Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC, Page 16 of 138  Not logged in ELOG logo
ID Date Author Category Type Module Target/Number Subject Text Attachments
  2455   Tuesday, June 13, 2023, 09:55 Frank SongITEStandard OperationTM4TiC#5module disconnection TM4 with TiC#5 was disconnected in
ITE and moved to NHC.
 TM4_with_TiC#5_(FEBIAD)disconnected_in_ITE_20230613.pdf 
  2454   Monday, June 12, 2023, 07:36 David WangConditioning StationStandard Operation  TCS water filters annual change. Plant group changed TCS water filters last
Friday. 4 filters on resin can inet /outlet
sides and filters(4 in one cartridge house)on
  
  2453   Tuesday, June 06, 2023, 17:36 Carla BabcockITWStandard OperationTM2TiC#6Module conditioningConditioned TM2 up to 48kV in ITW. Some
sparks and current is not very stable. Drawing
about 178uA at 48kV.
  
  2452   Tuesday, June 06, 2023, 15:10 Antoniette YapSpent Target VaultMaintenance   Annual Inspection of Main and Mini Storage VaultsThe annual inspection of the mini-storage
vault and main storage vault was completed
June 23, 2023. The following items were checked:
  
  2451   Tuesday, May 30, 2023, 14:19 David WangITE/ITWStandard Operation  BL2A MAA primary beam exclusion area ASU test. MAA ASU test have been done following document
154779. All three tests in document are passed.
DCR Jas has all test documents.
  
  2450   Tuesday, May 30, 2023, 14:15 David WangITWStandard Operation  ITW water signal interlock check is done.ITW water signal interlock check is done.
All ITW water signals including HS, EE, Coil
, Ta, Tu, MSP, C-window, HVC1, HVC2, 2A-dump,
  
  2449   Tuesday, May 30, 2023, 12:30 Frank SongITWStandard OperationTM2TiC#6gas lines pump out in ITW Faraday Cage Gas lines pumped  gas_lines_pumped_out_to_ITW.JPG 
  2448   Tuesday, May 30, 2023, 12:23 Frank SongITEStandard OperationTM4TiC#5gas lines pump out in ITE Faraday Cageargon is being supplied at 6 psi to TM4.   Argon_supplied_at_6psi_to_TM4_in_ITE.JPG 
  2447   Monday, May 29, 2023, 12:52 Frank SongITWStandard OperationTM2TiC#6Module Connection TM2 with TiC#6 was connected in ITW
(FEBIAD), turbo pumps were started successfully.
 TM2_with_TiC#6_connected_in_ITW_(FEBIAD)_20230529.pdf 
  2446   Thursday, May 25, 2023, 13:10 David WangConditioning StationMaintenanceTM2 TCS MP1 is replaced due to poor performace. TCS MP1 is replaced due to poor performance(
system shows unstable and high reading on
TCSCG1A and high TP1,TP2 current draw) .
  
  2445   Wednesday, May 24, 2023, 17:25 Carla BabcockITERepairTM4TiC#5Issues with anode shortWhen I tried to raise the anode voltage
in cathode bias mode on May 23 evening, I
found the target or tube shorted to HV common.
  
  2444   Wednesday, May 24, 2023, 08:34 David WangConditioning StationStandard OperationTM2TiC#6TM2 HS line helium pressure check and gasline fittins leak check.TM2 HS line helium leak check is done.
leak detector base LR 1.8xE-8atm.cc/sec. 
helium pressure 70 psi. 5 minutes test. no
  
  2443   Monday, May 22, 2023, 15:06 Carla BabcockITEStandard OperationTM4TiC#5Module conditioningYesterday and today module conditioning
was done on Tm4 in ITE. This is the first
ramp up after the shutdown and ITE is planned
  
  2442   Friday, May 19, 2023, 09:39 Frank SongSouth Hot-CellStandard OperationTM2TiC#6leak/electrical check TM2 with TiC#6 was checked on SHC,
see pic attached pls.
 TM2_with_TiC#6_leak_and_eletrical_check.png 
  2441   Friday, May 12, 2023, 09:56 Adam NewsomeSpent Target VaultStandard Operation  Emergency Close Mechanism Test The emergency close
mechanism for the Storage Vault door was
  
  2440   Wednesday, May 10, 2023, 08:40 Frank SongITEStandard OperationTM4TiC#5Module Connection TM4 was connected in ITE.  pics
attached FYI.
 TM4_with_TiC5_connection_in_ITE_20230509.pngTM4_with_TiC5_all_set_in_ITE_20230510_758AM.JPG 
  2439   Monday, May 08, 2023, 10:59 Frank SongNorth Hot-CellStandard OperationTM4TiC#5electrical check/leak check TM4 with target TiC#5 installed has
been leak checked and electric checked on
NHC.
 TM4_with_TiC#5_20230508.png 
  2438   Thursday, May 04, 2023, 07:14 David WangSafe Module ParkingStandard OperationTM4  SMP vacuum pumpimg down is stopped. SMP  vacuum pumping down is stopped.
SMP and TM4 venting to atmosphere will be
started soon. 
  
  2437   Wednesday, May 03, 2023, 13:22 David WangITEStandard Operation  Argon vented ITE station. Argon vented ITE station. ITEVV1S and ITGT
SV3 were closed after venting. 
  
  2436   Wednesday, May 03, 2023, 11:04 Adam NewsomeCraneMaintenance  Pail Handling Tool - Annual InspectionThe pail handling tool which is used to
move 5 gallon pails around the target hall
was inspected by A. Newsome, N. Jorgenson,
 PXL_20230503_172503014.jpgPXL_20230503_172457837.jpgPXL_20230503_172454009.jpg 
ELOG V2.9.2-2455