1828
|
Tuesday, November 27, 2018, 13:31 |
chad fisher | South Hot-Cell | Standard Operation | TM4 | Ta#57 | Ta#57 removal | Ta#57 has been removed from TM4. |
|
1827
|
Tuesday, November 27, 2018, 11:05 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | Ta#57 | Module move | TM#4 with Ta#57 has been moved from
the east target station to the south hot
cell. |
|
1826
|
Monday, November 26, 2018, 12:19 |
chad fisher | North Hot-Cell | Repair | | | East Manipulator | In preparation for removing the slave for
replacement I discovered that the timing
screw in the handle cable drum (master side) |
|
1825
|
Thursday, November 22, 2018, 14:38 |
Isaac Earle | North Hot-Cell | Development | | | NHC design approved by High Voltage Engineer | To satisfy RS 101 from the NHC requirements
specification (Document-131915) Tomislav
Hurskovec was consulted regarding high voltage |
|
1824
|
Thursday, November 22, 2018, 08:55 |
Anders Mjos | ITW | Repair | TM2 | UC#25 | ITW:FC5 safety signal limit switch installed | Yesterday Diagnostics group installed a
temporary external limit switch to provide
the in signal to the safety system. |
|
1823
|
Thursday, November 22, 2018, 08:53 |
Anders Mjos | ITW | Standard Operation | TM2 | UC#25 | Block move | Frank and Anders moved blocks from ITE
to ITW yesterday |
|
1822
|
Thursday, November 22, 2018, 08:52 |
Anders Mjos | ITE | Standard Operation | TM4 | Ta#57 | Closed ITE dump water | Paddle wheel signal was tripping proton
beam in ITW. Valved off ITE dump to divert
flow to ITW. Field around valve was about |
|
1821
|
Wednesday, November 14, 2018, 16:10 |
Anders Mjos | ITW | Repair | TM2 | UC#25 | ITW:FC5 safety signal troubleshooting | Measured resistance on safety limit switches
for FC5 on Exit Module 2. Determined that
the in connected signal did not work (shows |
|
1820
|
Thursday, November 08, 2018, 09:27 |
chad fisher | South Hot-Cell | Maintenance | | | South East Manipulator cable replacement | The handle cable on the east manipulator
of the south hot cell has been replaced.
Old cable showed signs of wear but had no |
|
1819
|
Wednesday, November 07, 2018, 09:50 |
Anders Mjos | ITW | Standard Operation | TM2 | UC#25 | TM2 connected in ITW | TM2 was connected yesterday by Frank and
Anders. The West side panel with IG1S on
Exit Module 2 was replaced with a new SST |
|
1818
|
Tuesday, November 06, 2018, 10:59 |
Travis Cave | ITW | Standard Operation | TM2 | UC#25 | Module move | TM#2 with UC#25 has been moved from
the conditioning station to the west target
station. |
|
1817
|
Monday, November 05, 2018, 14:27 |
Anders Mjos | Conditioning Station | Standard Operation | TM2 | UC#25 | Target module disconnected | Frank and Anders disconnected the water
and electrical connections this afternoon
after the target was conditioned over the |
|
1816
|
Monday, November 05, 2018, 08:24 |
Travis Cave | Spent Target Vault | Standard Operation | | nSiC#1 | Spent Target Move | The spent nSiC#1 target has been
moved from the south hot cell to the spent
target vault. It was placed in pail #172 |
|
1815
|
Thursday, November 01, 2018, 11:42 |
David Wang | Conditioning Station | Standard Operation | TM2 | UCx 25. | TM2 HS line helium pressure test at TCS and helium spray at SHC.. | Chad and I did leak check on TM2
HS line at SHC yesterday. Base LR 0.0XE-9
atm.cc/sec. No response on LD. |
|
1814
|
Wednesday, October 31, 2018, 14:23 |
Travis Cave | South Hot-Cell | Standard Operation | TM2 | nSiC#1 and UC#25 | Electrical Check | TM#2 with targets nSiC#1 (old target)
and UC#25 (new target) electrical check results.
See attached for details. |
|
1813
|
Wednesday, October 31, 2018, 14:20 |
Travis Cave | Conditioning Station | Standard Operation | TM2 | UC#25 | Module move | TM#2 with UC#25 has been moved from the south
hot cell to the conditioning station. |
|
1812
|
Tuesday, October 30, 2018, 10:50 |
Travis Cave | ITW | Standard Operation | TM2 | nSiC#1 | Modules moved | Modules were moved, ITW EX2 was moved
from the conditioning station to the west
target station and TM#2 ,with nSiC#1, |
|
1811
|
Monday, October 29, 2018, 10:43 |
David Wang | Conditioning Station | Repair | | | ITW exit 2 leak check at TCS. | I did a leak check this morning on exit
2 module at TCS. LD base leak rate
is 4.00XE-9atm.cc/sec, Base pressure is 0.00 |
|
1810
|
Friday, October 26, 2018, 09:44 |
Travis Cave | Conditioning Station | Standard Operation | | | Exit Module moved | The west exit #2 module has been moved from
the south hot cell to the conditioning station. |
|
1809
|
Thursday, October 25, 2018, 11:03 |
chad fisher | South Hot-Cell | Repair | | | Exit 2 West | Actuator arms, lemos, lemos and banana
plug block have been disconnected in preparation
for raising of the service tray. Aaron has |
8x |