  1415   Monday, December 05, 2016, 10:10 David WangITWStandard OperationTM2 Five shielding blocks have been transferred from ITE to ITW. The ITW is configured to take proton beam.   
  1414   Monday, December 05, 2016, 10:04 Aurelia LaxdalConditioning StationRepairTM3 TM3 vacuum system have been connected at TCS.


   
        
            
  
  1413   Saturday, December 03, 2016, 10:01 David WangITWRepairTM2 venting ITW and TM2 with argon.A short between TM2 EE and bias is produced
yesterday during tube heater ramp up. 
Alex asked for an argon venting on ITW to
  
  1412   Wednesday, November 30, 2016, 16:31 David WangConditioning StationRepairTM3 TM3 vacuum system have been connected at TCS.All water circuits are by passed on the
top of TM3. Water pumps and vacuum turbo-
pumps are started. Everything is ready for
  
  1411   Tuesday, November 29, 2016, 14:50 Travis CaveITWStandard OperationTM2UC#18module movedTM#2 with UC#18 has been moved to ITW from
the conditioning station.
  
  1410   Tuesday, November 29, 2016, 12:57 David WangITWStandard OperationTM2 TM2 is connected in ITWAll turbo pumps are started. Water system
and water signals have been checked. Pumping
down on ITW and TM2 is good so far.
  
  1409   Tuesday, November 29, 2016, 07:50 David WangConditioning StationStandard OperationTM2 TM2 is disconnected at TCS.Argon venting is done.   
  1408   Tuesday, November 29, 2016, 06:27 David WangConditioning StationStandard OperationTM2 TCS water pumps are stoppedArgon venting on TCS and TM2 is processing   
  1407   Friday, November 25, 2016, 09:04 Travis CaveSpent Target VaultStandard Operation SiC#35Spent Target moveOn November 24th 2016 the spent SiC#35
was moved from the south hot cell to the
spent target vault. see attached pdf for
 Vault_Storage_November_24_2016.pdf 
  1406   Thursday, November 24, 2016, 10:30 David WangConditioning StationStandard OperationTM2 HV cover is installed on TM2 at TCSInterlock key  are returned back to
B2 level.TM2 is ready for HV conditioning
and heating up at TCS.
  
  1405   Thursday, November 24, 2016, 09:33 Anders MjosConditioning StationStandard OperationTM2UC#18Conditioning UC#18Thursday, November 24, 2016, 09:33: Water
package on
Thursday, November 24, 2016, 09:43:
  
  1404   Wednesday, November 23, 2016, 16:21 David WangConditioning StationStandard OperationTM2 TM2 and TCS vacuum system has been connected.All vacuum pumps have been started. Air
ballast 50seconds on roughing pump. Everything
is good  so far.
  
  1403   Wednesday, November 23, 2016, 16:10 David WangSouth Hot-CellStandard OperationTM2 SHC, TM2 leak check on HS line.Chad and I leak checked TM2 HS line with
new UCx target installed. Helium spray 
2 seconds on each joint and 10seconds flushing
  
  1402   Wednesday, November 23, 2016, 14:25 Travis CaveSouth Hot-CellStandard OperationTM2UC#18Electrical CheckResults of TM#2 with UC#18 electrical at
the south hot cell. See attached PDF for
details.
 TM2_elechk_UC18_SHC.PDF 
  1401   Wednesday, November 23, 2016, 14:21 Travis CaveConditioning StationStandard OperationTM2UC#18module movedTM#2 with UC#18 has been moved from the
south hot cell to the conditioning station.
  
  1400   Tuesday, November 22, 2016, 14:26 David WangConditioning StationStandard Operation  TCS vacuum pumps are switched offTCS will be vented tomorrow morning for
TM2 moving.
  
  1399   Tuesday, November 22, 2016, 11:56 Travis CaveSouth Hot-CellStandard OperationTM2SiC#35Electrical CheckElectrical check of TM#2 with the SiC#35 
post beam run. See attached PDF for details.
 TM2_elechk_SiC35_postbeam.PDF 
  1398   Tuesday, November 22, 2016, 10:45 Travis CaveSouth Hot-CellStandard OperationTM2SiC#35module movedTM#2 with the old SiC #35 has been moved
from ITW to the south hot cell.
  
  1397   Tuesday, November 15, 2016, 07:53 David WangConditioning StationStandard OperationTM4 Target Hall schedule for beam schedule 131(Sep-Dec, 2016)Update TH schedules . See attachments  Target_Hall_shedule_131_Sep_to_Dec.pdfTarget_Hall_shedule_131_Sep_to_Dec.mppTarget_Hall_shedule_131__Sep_to_Dec_2016.pdf 
  1396   Tuesday, November 08, 2016, 14:45 David WangITEMaintenanceTM4 TM4 has been moved to ITE and connected there.All ITE and TM4  turbo pumps are started.
The east station pumping down is good so
far.
  