Message ID: 1413     Entry time: Saturday, December 03, 2016, 10:01
Author: David Wang 
Category: ITW 
Type: Repair 
Module: TM2 
Target/Number:  
Subject: venting ITW and TM2 with argon. 

A short between TM2 EE and bias is produced yesterday during tube heater ramp up.  Alex asked for an argon venting on ITW to see if the problem could be solved by venting and pumping down yesterday.  I set up argon venting system in electrical room and started the venting at 8:30 AM this morning.  It will take 5 hours to vent the ITW to 760 torr(mechanical gauge reading).  The venting system pressure is set as 2 torr. A pressure relieve valve is installed into ITW venting line to prevent station over venting. The argon bottle  valve in electrical room will be closed by isac opps after 5 hours venting.