148
|
Wednesday, July 18, 2012, 16:49 |
Grant Minor | South Hot-Cell | Development | | | South Hot Cell Ventilation Alarm Trip | Today (Wednesday July 18th) at around 4:15
pm I was taking a small tour group from
VECC into the Target Hall. In the process |
|
147
|
Monday, July 16, 2012, 11:55 |
Bevan Moss | Crane | Repair | | | Crane has stopped working |
|
|
146
|
Friday, July 13, 2012, 16:33 |
Bevan Moss | Crane | Repair | | | Crane has stopped working | In the AM today David and I used the crane
to raise the ground plate sheet metal into
place. This afternoon when I attempted to |
|
145
|
Monday, July 09, 2012, 16:08 |
David Wang | ITE | Standard Operation | TM4 | UO#3 | ITM4 in ITE connected and pumping down |
Normal
0
|
|
144
|
Monday, July 09, 2012, 10:51 |
Travis Cave | ITE | Standard Operation | TM4 | UO#3 | module move | TM#4 with UO#3 from the conditioning station
to the east target station. Move went well. |
|
143
|
Friday, July 06, 2012, 14:38 |
David Wang | Conditioning Station | Standard Operation | TM4 | UO#3 | TM4 UO#3 target heat shield helium pressure check is done. | Connected leak detector to TM4 and CS vacuum
system. The vacuum readings on TM4 and CS:PNG4
3.6 xE-6 Torr, IG1 2.3xE-6torr, IG4(diagnostic |
|
142
|
Friday, July 06, 2012, 11:34 |
Travis Cave | Spent Target Vault | Standard Operation | | SiC#27 | Spent target move | SiC#27 has been moved from the south hot
cell to the spent target vault. Target was
placed in pail #96, placed in slot 3A, the |
|
141
|
Friday, July 06, 2012, 09:24 |
Travis Cave | Conditioning Station | Standard Operation | TM4 | UO#3 | Electrical check | Electrical check of the target was done
at the conditioning station under vacuum,
see attached file for details. |
|
140
|
Wednesday, July 04, 2012, 14:16 |
Travis Cave | Conditioning Station | Standard Operation | TM4 | UO#3 | module move | TM#4 with UO#3 moved from the south hot
cell to the conditioning station. The fields
of the module at the hot cell was 74.4 mSv/hr. |
|
139
|
Wednesday, July 04, 2012, 13:18 |
David Wang | Conditioning Station | Standard Operation | TM4 | uo#3 | leak check on heat shield circuit |
|
|
138
|
Wednesday, July 04, 2012, 11:33 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | UO#3 | Electrical check | Electrical check of TM#4 with UO#3
attached at the south hot cell see attached
PDF for full results. It has been noted that |
|
137
|
Tuesday, July 03, 2012, 12:26 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | SiC#27 | module move | TM#4 with SiC#27 moved from the east station
to the south hot cell. Fields at East MAA
were 127mSv/hr and the fields at the south |
|
136
|
Tuesday, July 03, 2012, 10:50 |
David Wang | ITE | Standard Operation | TM4 | | Disconnected TM4 in ITE. | I disconnected TM4 in ITE this morning.
The window circuit and heat shield circuit
had been purged. The general field inside |
|
135
|
Tuesday, June 26, 2012, 14:10 |
David Wang | South Hot-Cell | Repair | TM3 | | TM3 heat shield and window circuits leak check is done. | Chad and i did a leak check on TM3 heat
shield and window circuits.Both circuits
are pumped easily down to the bottom leak |
|
134
|
Monday, June 25, 2012, 14:39 |
David Wang | ITW | Standard Operation | | | I moved 5 shielding blocks from ITE to ITW, | and set up ventilation for ITW. ITW is
ready for taking proton beam now. All water
interlock checks for ITW are done. The ITW |
|
133
|
Monday, June 25, 2012, 07:53 |
chad fisher | South Hot-Cell | Repair | TM3 | N/A | TM3 Refurb. Work | On Friday, June 22 the following work was
carried out.
Further inspection of |
|
132
|
Thursday, June 21, 2012, 14:33 |
chad fisher | South Hot-Cell | Repair | TM3 | N/A | Pictures TM3 June 21st | Here are the pictures from today...there
is video too but it is not uploaded yet. |
8x |
131
|
Thursday, June 21, 2012, 14:30 |
chad fisher | South Hot-Cell | Repair | TM3 | N/A | TM3 Refurbishment Start | Started refurb of TM3.
Planned activities:
Inspection |
|
130
|
Thursday, June 21, 2012, 14:00 |
Travis Cave | South Hot-Cell | Repair | TM3 | no target | module move | TM#3 has been moved from the south west
silo to the south hot cell for the start
of its second refurb/repair. The fields of |
|
129
|
Wednesday, June 20, 2012, 11:39 |
Grant Minor | South Hot-Cell | Development | TM3 | N/A | TM3 Planned Activites at South Hot Cell Jun 20 to 29 2012 |
Normal
0
false
false
false
|
|