Message ID: 120     Entry time: Thursday, June 07, 2012, 11:58
Author: Bevan Moss 
Category: Conditioning Station 
Type: Standard Operation 
Module: TM1 
Target/Number: Ta38 
Subject: Module Move from SHC to TCS 

TM1 was moved from SHC to the TCS. The mode took roughly 1 hour. During the move the north east corner of the containment box caught slightly on the flange of the vacuum vessel and then slipped off. The contact was minimal but should none the less be noted. After sliding off of the flange the module did not crash into the other sides of the vacuum vessel, this is why I believe the contact was minimal. It should be noted that the corner of concern is the one that is most difficult to see.