Subject: Target Change Nb#6 - Ta#38 

Nb#6 was removed from TM1...it looked very clean.

Ta#38 was installed onto TM1...fit well.

Isaac Earle did this change with supervision in an effort to cross train.

TM1 containment box was checked for damage from the "bump" it got during yesterday's move. There was new scratches on the shutter side panel. Picture to follow.

The front containment box panel was "difficult" to remove...it required a good pull to get off.

 