  2753   Wednesday, January 22, 2025, 10:29 Frank SongFaraday CageMaintenance  Annual clean up for ITE/ITW Faraday cages

 David and I cleaned both cages in ISAC1 electric room, all done.

  2752   Tuesday, January 21, 2025, 10:46 David WangITE/ITWStandard Operation  ITW/ITE pit general annual cleaning up.

ITW/ITE pit general annual cleaning up were done. all concrete floor and TM equipment surface are vacuum  cleaned. HV cage inside and blue nylon insulators were wiped by paper.

  2751   Monday, January 20, 2025, 11:33 Adam NewsomeWaste Package/ShipStandard Operation   F-308 flask loading - six flasks loaded

Today (2025-01-20), six flasks were loaded in preparation for shipment with the following targets: C#4, TiC#5, Ta#64,Ta#62, Nb#10, SiC#44

Some of the pails (256, 273, 279, 277) required replacement of the wire rope cable with new style, 30 ft length, as requested by CNL. A lifting label was also applied to these pails. Some of the pails (295, 298) already had the appropriate cable and lifter label.

 

At the time of writing this log:

  • The second crimped lifting loop has not yet been applied to each pail.
  • The locks have not yet been applied to the flasks.

 

The mini-storage vault is now EMPTY. The mini-storage vault has been swiped and checked for contamination.

The target index spreadsheet has been updated (attached).

Attachment 1: Target_Index_2025-01-20.xlsm
  2750   Thursday, January 16, 2025, 14:21 David WangConditioning StationStandard OperationTM3No targetTM3 electrical check at TCS under good vacuum

A complete TM3 electrical check at TCS under good vacuum has been done. Pin 14 to 60KV only has 8K ohm on ohmmeter check , and it's about 2Kohm @250V Megga. It's low in resistivity. The pin 14 is for thermocouples only so no big concern.  The rest things are good. See attachments.

Attachment 1: TM3_electrical_check_@TCS_page_1.pdf
TM3_electrical_check_@TCS_page_1.pdf
Attachment 2: TM3_electrical_check_@TCS_page_2.pdf
TM3_electrical_check_@TCS_page_2.pdf
  2749   Thursday, January 16, 2025, 10:03 Travis CaveSpent Target VaultStandard Operation UC#47Spent Target Move

 The spent UC#47 was moved from the south hot cell to the spent target vault placed in pail #302 in spot 1C of the vault, it was 24.5mSv/hr when removed from the south hot cell. See attached for vault details.

Attachment 1: Target_Index_2025-01-16.pdf
Target_Index_2025-01-16.pdf
  2748   Tuesday, January 14, 2025, 10:00 David WangSouth Hot-CellStandard OperationTM3UCx#47after operation electrical check, Tm3 UCx 47

TM3 UCx#47 after operation electrical check  is done at SHC. The result is normal. See attachment.

Attachment 1: TM3_UCX_47_after_operation_electrical_check.pdf
TM3_UCX_47_after_operation_electrical_check.pdf
  2747   Monday, January 13, 2025, 10:36 Frank SongITEStandard OperationTM3UCx#47module disconnection

 TM3 with spent target UCx#47 was disconnected in ITE and will be moved to SHC.

Attachment 1: TM3_with_spent_target_UCx#47_disconnection_in_ITE_2025-01-13.pdf
TM3_with_spent_target_UCx#47_disconnection_in_ITE_2025-01-13.pdf TM3_with_spent_target_UCx#47_disconnection_in_ITE_2025-01-13.pdf TM3_with_spent_target_UCx#47_disconnection_in_ITE_2025-01-13.pdf
  2746   Monday, January 13, 2025, 10:02 Travis CaveSpent Target VaultStandard Operation UC#46Spent Target Move
UC#46 was placed in pail# 301 in spot 1B and was 26.3mSv/hr when removed from the SHC. See attached PDF for vault 
details.
Attachment 1: Target_Index_2025-01-13.pdf
Target_Index_2025-01-13.pdf
  2745   Thursday, January 09, 2025, 11:46 David WangSafe Module ParkingStandard OperationTM4No targetSMP is under vacuum for TM4 storage during shut down.

 SMP:MP1 is started with SMP BV1 is opened. SMP is under vacuum for TM4 storage during shut down.

  2744   Thursday, January 09, 2025, 11:08 David WangFacilitiesMaintenance  ITH:MP1 is deteriorating by watching on ITH:CG1 and CG2 readings

ITH:MP1 is deteriorating by watching on ITH:CG1 and CG2 readings and investigation in pit. A fault 17644 has been issued. this pump will be replaced in March when general fielding in vacuum pit is reasonable for the job.

  2743   Wednesday, January 08, 2025, 07:37 chad fisherSouth Hot-CellStandard OperationTM4UCx#46UCx#46 removal

UCx#46 removed from TM4 and placed into a pail back-filled with argon. Nothing visually unusual; no issues.

Attachment 1: TM4_UCx46_07012024.jpeg
TM4_UCx46_07012024.jpeg
Attachment 2: TM4_UCx46_2_07012024.jpeg
TM4_UCx46_2_07012024.jpeg
  2742   Tuesday, January 07, 2025, 12:05 David WangITEStandard OperationTM3UCx #47ITE primary and secondary vacuum vessel leak check for 2025 shut down

ITE primary and secondary vacuum vessel leak check for 2025 shut down have been done. No leak.  The TM3 waterlines helium pressure test will be done at TCS when module is there.

TM3 water lines helium pressure test  are done. 70 psi helium 3 minutes to each line( except HS which has no target on it ) . leak detector base leak rate :0.0Xe-9 atm.cc/sec. No leak on all tested water lines.Helium were purged out after test. and 60 psi nitrogen were filled in lines for storage. 

  2741   Monday, January 06, 2025, 08:38 Frank SongITWStandard OperationTM4UCx#46module disconnection

 TM4 WITH UCx#46 was disconnected in 2025-01-02 in ITW. Forms attached.

Attachment 1: TM4_with_UCx#46_disconnection_in_ITW_2025-01-02.pdf
TM4_with_UCx#46_disconnection_in_ITW_2025-01-02.pdf TM4_with_UCx#46_disconnection_in_ITW_2025-01-02.pdf TM4_with_UCx#46_disconnection_in_ITW_2025-01-02.pdf
  2740   Friday, January 03, 2025, 12:34 Frank Song5 Shielding BlocksMaintenance UCx#47shielding blocks moving

 Five shielding blocks are moved from ITE to storage area ( one of them is sitting on B2 as limit of room) for target stations maintenance in 2025 winter shut down .

  2739   Friday, January 03, 2025, 10:41 David WangITWStandard OperationTM4UCX46ITW primary and secondary vacuum vessel leak check for 2025 shut down

ITW primary and secondary vacuum vessel leak check for  2025 shut down has been done. Also,TM4 internal water line helium pressure test has been finished.  Both results are normal. There are two small old leak on EXit 1 and Exit2 module top plate  o-ring under 1Xe-8 atm.cc/sec which we knoew in past years test. resin spray on leak  area reduce the leak ratee below 5Xe-9 atm.cc/sec. No concern on these small leak.   See attachment  for detail results.

Attachment 1: ITW_primary_and_secondary_vacuum_leak_check_2025.pdf
ITW_primary_and_secondary_vacuum_leak_check_2025.pdf ITW_primary_and_secondary_vacuum_leak_check_2025.pdf
  2738   Friday, January 03, 2025, 09:59 Adam NewsomeFacilitiesStandard Operation  Safety Walkaround complete - ISAC Hot Cells, Target Hall

A safety walkaround was completed for the ISAC Hot Cells and Target Hall Areas.

The resulting spreadsheet can be found on DocuShare as Document-242733.

Main deficiencies identified:

  • Hot Cells:
    • NHC right manipulator gripper stuck (known, repair planned)
  • Target Hall:
    • 50% of overhead light bulbs burnt out (David Wang contacted Electrical Services to rectify)
    • One RH camera for target pit not working (Travis Cave notified)

Action has been taken on all deficiencies.

  2737   Wednesday, December 18, 2024, 14:17 Adam NewsomePail Handling ToolMaintenance  Pail Handling Tool - Inspection

An informal inspection of the main Pail Handling Tool was performed today as the final one for the year. Note that the main formal annual inspection was performed June 18, 2024 for this year.

The attachment to this e-log serves as a record of all inspections for this tool throughout 2024.

The spare tool was not inspected as it was not in service this year.

Attachment 1: ISAC_Pail_Handling_Tool_Inspection_Record_-_2024.pdf
ISAC_Pail_Handling_Tool_Inspection_Record_-_2024.pdf
  2736   Wednesday, December 18, 2024, 12:18 Adam NewsomeSpent Target VaultStandard Operation  Five Pails Transferred from Main Vault to Mini Vault

Five pails were transferred from main vault to mini vault. Note that there was already one pail in the mini vault, so at present there are six pails staged for packaging into F-308s.

Nb#10, Pail 295, Tray 4A
C#4, Pail 277, Tray 4C
Ta#64, Pail 273, Tray 5C
Ta#62 with wire scanner, Pail 256, Tray 7A
TiC#5, Pail 279, Tray 3A

The target index has been updated accordingly (see attached but note that the summary does not reflect the sixth pail).

Attachment 1: MiniVault_2024-12-18.pdf
MiniVault_2024-12-18.pdf MiniVault_2024-12-18.pdf
  2735   Monday, December 09, 2024, 13:10 Frank Song5 Shielding BlocksStandard OperationTM3UCx#47shielding blocks transfer

 5 Shielding Blocks have been transferred from ITW to ITE. MAA is secured after moving.

  2734   Thursday, December 05, 2024, 12:00 Adam NewsomeSpent Target VaultStandard Operation Ta#68Spent target move - Ta#68 in Pail 300

Ta#68 spent target was moved in Pail 300 to storage vault location 5A. The dose rate measured at the South Hot Cell was 429 mSv/h at 1m. The target index spreadsheet has been updated and the current vault configuration is attached to this e-log. At this time, the storage vault is getting quite full - it is planned to remove five pails in January 2025.

Attachment 1: Storage_Vault_Contents_2024-12-05.pdf