  ID Date Author Categorydown Type Subject Text Attachments
  103   Monday, January 08, 2018, 09:04 Maico Dalla Valle / Jason KapalkaCyclotronStandard OperationCyclotron Lid UpRemote Handing is ready for January, 8 2018
Cyclotron lid up. Elevating system service
has been completed.
 Cyclotron_Elevation_Maintenance_Rotation_Record_20180223.xlsx 
  104   Tuesday, January 09, 2018, 15:54 Jason KapalkaCyclotronStandard OperationLid-up sequence (in-tank work)2018-01-09
07:00-10:00 - Pre-job meeting, informed main
control room of operation startup, lowered
  
  105   Tuesday, January 16, 2018, 13:43 Travis CaveCyclotronStandard OperationCyclotron in tank work All cyclotron in tank work has been
completed.
  
  106   Thursday, January 25, 2018, 17:16 Isaac EarleCyclotronStandard OperationHE1 probe removed The HE1 probe was removed from the
cyclotron today using the procedure in Document
126165.  The reason for removal is so
  
  107   Wednesday, January 31, 2018, 11:20 Isaac EarleCyclotronStandard OperationHE1 probe reinstalled HE1 probe was reinstalled in the
cyclotron this morning as per the procedure
in Document 126165.  Hardware for the
  
  111   Tuesday, April 03, 2018, 11:57 Travis CaveCyclotronStandard OperationBlue Shield Door Shut. The Blue Shield Door on the B2 level
of the RH building has been closed.
  
  115   Thursday, January 30, 2020, 06:55 Dan McDonaldCyclotronStandard OperationLid up operationsLid up operations took place on January
21st starting at 10:25 lid went up without
issue. Couple things to note are station
 lid_up_2020.xlsx 
  116   Monday, February 03, 2020, 11:06 Adam NewsomeCyclotronDevelopmentPorthole Cover Handling Tool - Initial Test ReportThe suction-cup based porthole cover handling
tool (TRH1366) was tested for the first time
inside the cyclotron as part of the regular
 IMG_20200128_114901.jpg 
  117   Wednesday, February 05, 2020, 12:37 Adam NewsomeCyclotronDevelopmentCyclotron Vacuum Cleaning Tool - Initial TestThe vacuum cleaning tool (TRH1366, vacuum
cleaning configuration) was tested in the
cyclotron tank. The following test were performed:
 IMG_20200205_093927.jpg 
  118   Wednesday, February 05, 2020, 12:44 Adam NewsomeCyclotronDevelopmentCyclotron Small Object Retrival Tool - Intial TestThe small object retrieval tool was tested
in the cyclotron tank for the first time.
At this time, there are no known accessible
 IMG_20200205_112703.jpg 
  120   Saturday, April 04, 2020, 09:47 Dan McDonaldCyclotronStandard OperationLid down operationsLid down operations for 2019/2020 shutdown
went ahead as planned on March 10th 2020
with Dan Louie and Arthur Leung absent due
 lid_down_2020.xlsx 
  123   Thursday, July 16, 2020, 11:57 Adam NewsomeCyclotronDevelopmentCyclotron Mockup: Orbital Position Pendant UpgradeThe pendant used for controlling the orbital
motion of the bridge mockup was upgraded.
Features of the new pendant include:
 Before.jpgAfter.jpg 
  127   Friday, January 22, 2021, 14:30 Adam NewsomeCyclotronStandard OperationLid up operation - 2021The lid
up operation took place on Jan. 22, 2021.
The
  
  128   Wednesday, February 03, 2021, 12:37 Adam NewsomeCyclotronDevelopmentLadder Handling Tool - First In-Tank Test (SAS0824)The newly developed Ladder Handling Tool
(TRH1401), which is used to move the maintenance
ladders from the #5 resonator area closer
 Capture.PNGCapture5.PNGCapture14.PNG 
  131   Thursday, April 01, 2021, 13:47 Adam NewsomeCyclotronStandard OperationVault Shield Door ClosedThe vault shield door has been closed and
seal inflated. The operation was performed
with no issue. 
  
  137   Friday, February 04, 2022, 11:52 Adam NewsomeCyclotronStandard OperationLid up operation - 2022The lid up operation
took place on Feb. 4, 2022. 
  
  138   Tuesday, February 08, 2022, 11:39 Adam NewsomeCyclotronDevelopmentRadiation Survey - sampling rate errorWhen attempting to perform the radiation
survey, the program displayed an error at
startup stating that the software was not
  
  140   Wednesday, April 27, 2022, 16:05 Adam NewsomeCyclotronStandard OperationLid down operation - 2022The lid down operation
took place on Apr. 27, 2022. 
  
  142   Tuesday, May 10, 2022, 11:26 Nadia JorgensonCyclotronRepairFestooning rail rope and pulley system re-routedThe rope and pulley system that is used
to raise the festooning rail across the vault
shield door has been re-routed. It now makes
  
  143   Tuesday, May 10, 2022, 11:30 Nadia JorgensonCyclotronRepairCracked Festooning Rail Bushing Removed We removed the left bushing that
is around the air cylinder on the festooning
rail, right outside the cyclotron. It was
 Festooning_Bushing_Cracked.jpg 