Friday, March 27, 2015, 11:25, Travis Cave, Cyclotron, Standard Operation, Copper Blockers
|
Copper Blockers have been removed from the cyclotron and one ladder has been installed. |
Thursday, April 02, 2015, 12:09, Dan McDonald, Cyclotron, Standard Operation, Lid Down operations April, 2, 2015
|
Lid down Start at 11:17, lid went down without any issues or stop's. Lid finish at 11:45
|
Tuesday, January 05, 2016, 09:58, Travis Cave, Cyclotron, Standard Operation, Opened the shield door
|
The shield door on the B2 level has been opened. |
Wednesday, February 03, 2016, 08:16, Dan McDonald, Cyclotron, Standard Operation, Cyclotron lid up
|
Lid up procedure Started at 12:00pm. Initial numbers. # 1-47,2-49,3-45,4-47,5-47,6-47,7-49,8-45,9-50,10-50,11-51,12-49. After a number of unsuccessful
attempts at jogging the system and trouble shooting it was decided to suspend operations record numbers and resume on Feb 2nd. Final numbers for
Feb 1st #1-1289,2-1297,3-1288,4-1295,5-1283,6-1298,7-1287,8-1289,9-1290,10-1296,11-1287,12-1296. |
Tuesday, February 09, 2016, 14:48, Travis Cave, Cyclotron, Standard Operation, shadow shields
|
All shadow shields have been installed. Ladders, the pothole covers and the second rad survey will be done tomorrow. |
Wednesday, February 10, 2016, 14:53, Travis Cave, Cyclotron, Standard Operation, shadow shields
|
All cyclotron in tank work is completed. |
Tuesday, February 16, 2016, 16:32, Isaac Earle, Cyclotron, Standard Operation, HE1 Probe Removed from Cyclotron
|
The HE1 Probe was removed from the cyclotron this morning following the procedure in Document-126165 (currently in draft status, to be released after
the probe has been reinstalled). The procedure took approximately 2 hours from when the trolley was put into the tank until when it was removed from
the tank with the probe. The procedure took from 8am - noon including putting the bridge into the cyclotron, and removing the probe from the trolley |
Friday, February 19, 2016, 10:17, Isaac Earle, Cyclotron, Standard Operation, HE1 Probe Installed in Cyclotron
|
The HE1 Probe was reinstalled into the cyclotron this morning following Section 3.2 in Document-126165 (to be reviewed and released after camera
view screen captures added). The procedure took approximately 1 hour from when the trolley was moved into the cyclotron tank until when it was removed.
Camera view screenshots were captured throughout the procedure and the probe head was inspected with the left outrigger camera after installation |
Thursday, February 25, 2016, 11:41, Travis Cave, Cyclotron, Standard Operation, Ex 2C removal
|
Ex 2C has been removed from the cyclotron. A trip into the tank was needed to free the probe, hung up on the usual spot. |
Tuesday, March 01, 2016, 13:27, Travis Cave, Cyclotron, Standard Operation, Ex 2C install
|
EX 2C has been installed back into the cyclotron. |
Wednesday, March 09, 2016, 17:09, Ron Kuramoto, Cyclotron, Development, EX4N new housing installation
|
The new EX4N housing assembly drawing TEC0071 (unfinished) was installed and connected to the EX4 tank side port flange over a 3 day period from Feb29
– Mar 2, 2016. This was a hands on installation spread amongst 5 people with the total accumulated dose was 2.97 mSv. See W/P C2016-02-29-5
|
Tuesday, March 15, 2016, 13:56, Dan McDonald, Cyclotron, Standard Operation, Lid Down 2016
|
Lid down Started at 12:15, station and count numbers. Lid went down with out incident as station 1 and 7 show the counters will need replacing. We are
going to change counters before the end of this shutdown to ensure proper orientation in case of emergency lid up scenario.
Start 12:15 |
Thursday, April 07, 2016, 11:04, Travis Cave, Cyclotron, Standard Operation, Closed the shield door
|
The shield door on the B2 level of the RH building has been closed. |
Tuesday, January 31, 2017, 14:41, Travis Cave, Cyclotron, Standard Operation, Shield installation
|
200, 400, 500, 600, and a pallet of 700 series of shield have been installed in the cyclotron. |
Thursday, February 09, 2017, 15:21, Isaac Earle, Cyclotron, Standard Operation, HE2 Probe Removed
|
The HE2 probe was removed from the cyclotron today following the
procedure in Document #126165. An orbital bridge position of 247.35° provided better alignment than 247.2
from the procedure. The probe signal head was intentionally left in the "up" position by Diagnostics Group which did not cause any issues |
Tuesday, February 21, 2017, 13:40, Isaac Earle, Cyclotron, Standard Operation, HE2 Probe Returned to Cyclotron
|
The HE2 probe was reinstalled in the cyclotron this morning following the procedure in Document #126165. An orbital bridge position of 247.35°
was used (same as for the removal on Feb 9th). The installation went smoothly. |
Tuesday, February 28, 2017, 15:45, Jason Kapalka, Cyclotron, Standard Operation, 2C extraction probe removal and reinstallation
|
2C extraction probe was removed from cyclotron tank on 2017-02-07 by RH and Probes group members with service
bridge, upper resonator trolley, and 2C attachment. Three QDLs were disengaged remotely, while one had to be
disengaged locally in the tank (just like in 2013, 2014, 2015, and 2016).
|
Friday, March 03, 2017, 13:30, Jason Kapalka, Cyclotron, Standard Operation, CP continuity test
|
Performed continuity test at Cyclotron center post with RH and Operations group members using the service bridge,
tool trolley, and probe attachment on 2017-03-03.
|
Tuesday, March 14, 2017, 11:23, Jason Kapalka, Cyclotron, Standard Operation, Start/end of shutdown photo and video survey
|
The start of shutdown photo and video survey was performed in the Cyclotron tank by the RH group using the
service bridge and video trolley on 2017-01-27 (see attached pictures).
|
Tuesday, March 14, 2017, 12:02, Jason Kapalka, Cyclotron, Standard Operation, Radiation survey
|
The unshielded radiation survey was performed in the Cyclotron tank by the RH group using the service bridge,
tool trolley, and radiation survey attachment on 2017-01-30 (see attached plot).
|
|