34
|
Friday, January 31, 2014, 10:07 |
Travis Cave | Cyclotron | Standard Operation | 2C removal | 2C has been successfully removed from the
cyclotron and is now currently sitting in
the B2 level of the RH building. A tank access |
|
|
55
|
Wednesday, February 04, 2015, 13:57 |
Travis Cave | Cyclotron | Standard Operation | 2C removal | 2C has been removed from the cyclotron. |
|
|
35
|
Friday, February 07, 2014, 10:50 |
Travis Cave | Cyclotron | Standard Operation | 2C install | 2C has been installed into the cyclotron. |
|
|
95
|
Tuesday, February 28, 2017, 15:45 |
Jason Kapalka | Cyclotron | Standard Operation | 2C extraction probe removal and reinstallation | 2C extraction probe was removed from cyclotron
tank on 2017-02-07 by RH and Probes group
members with service
|
|
|
3
|
Tuesday, February 14, 2012, 15:40 |
Grant Minor | Trolley | Standard Operation | 2C Removal - all 4 QDLs were actuated remotely this year! | Today Remote Handling staff (Maico Dalla
Valle, Travis Cave) used the Remote Handling
2C probe removal trolley to remove the probe |
|
|
57
|
Tuesday, February 17, 2015, 11:28 |
Travis Cave | Cyclotron | Standard Operation | 2C Installation | 2C extraction probe has been re-installed
in the cyclotron. After some problems on
the first install attempt, do to a busted |
|
|
92
|
Monday, February 06, 2017, 20:32 |
Jason Kapalka | Elevation Jack | Maintenance | 2017 Cyclotron Elevating System Maintenance | The Cyclotron Elevating System planned maintenance
work this year was performed on Jack Station
#3, #8, #9, and #10.
|
|
|
76
|
Wednesday, January 27, 2016, 10:51 |
maicodallavalle | Elevation Jack | Maintenance | 2016 Cyclotron Elevation System Maintenance | The Cyclotron Elevating System Shut Down
work done this year was done on Station #9
and Station #10. |
|
|
47
|
Friday, January 23, 2015, 10:27 |
maicodallavalle | Elevation Jack | Maintenance | 2015 Jack Maintenance - Stations #4 and Station #9 | The Cyclotron Elevating System Shut Down
work done this year was done on Station #4
and Station #9. |
|
|
5
|
Tuesday, September 25, 2012, 08:57 |
maicodallavalle | Elevation Jack | Maintenance | 2012 Service Maintance of #4 Station Jacking System | Shut down work for 2012.Replaced serviced
Jacking Station #6. Tapered alignment pins
were damaged. They were skimmed and checked |
|
|
174
|
Tuesday, May 07, 2024, 09:35 |
Adam Newsome | Elevation Jack | Standard Operation | Lid down operation (third) - 2024 | A third lid down
operation took place over May 6-7, 2024. |
|
|
149
|
Thursday, February 02, 2023, 07:05 |
maicodallavalle | Service Bridge | Repair | Hinged Festoon Rail at Cyclotron | The Hinged section of the festoon rail
at Cyclotron has a piston to keep rail in
the up position for shutdown work (Bridge |
|
|
191
|
Wednesday, October 16, 2024, 11:37 |
Adam Newsome | Service Bridge | Development | Bridge Lift Mechanism Refurbishment (Phase 2 of 2) - Complete | See previous e-log for phase 1: e-log
134
|
6x |