ID Date Author Category Type Subjectdown Text Attachments
  34   Friday, January 31, 2014, 10:07 Travis CaveCyclotronStandard Operation2C removal2C has been successfully removed from the
cyclotron and is now currently sitting in
the B2 level of the RH building. A tank access
  
  55   Wednesday, February 04, 2015, 13:57 Travis CaveCyclotronStandard Operation2C removal2C has been removed from the cyclotron.   
  35   Friday, February 07, 2014, 10:50 Travis CaveCyclotronStandard Operation2C install2C has been installed into the cyclotron.   
  95   Tuesday, February 28, 2017, 15:45 Jason KapalkaCyclotronStandard Operation2C extraction probe removal and reinstallation2C extraction probe was removed from cyclotron
tank on 2017-02-07 by RH and Probes group
members with service 
  
  3   Tuesday, February 14, 2012, 15:40 Grant MinorTrolleyStandard Operation2C Removal - all 4 QDLs were actuated remotely this year!Today Remote Handling staff (Maico Dalla
Valle, Travis Cave) used the Remote Handling
2C probe removal trolley to remove the probe
 2C_probe_Feb_14_2012_labelled.JPG2C_probe_solenoid_5_Feb_14_2012_labelled.JPG 
  57   Tuesday, February 17, 2015, 11:28 Travis CaveCyclotronStandard Operation2C Installation2C extraction probe has been re-installed
in the cyclotron. After some problems on
the first install attempt, do to a busted
  
  92   Monday, February 06, 2017, 20:32 Jason KapalkaElevation JackMaintenance2017 Cyclotron Elevating System Maintenance The Cyclotron Elevating System planned maintenance
work this year was performed on Jack Station
#3, #8, #9, and #10.
 Cyclotron_Elevation_Maintenance_Rotation_Record_20170829.xlsx 
  76   Wednesday, January 27, 2016, 10:51 maicodallavalleElevation JackMaintenance2016 Cyclotron Elevation System Maintenance The Cyclotron Elevating System Shut Down 
work done this year was done on Station #9
and Station #10.
  
  47   Friday, January 23, 2015, 10:27 maicodallavalleElevation JackMaintenance2015 Jack Maintenance - Stations #4 and Station #9The Cyclotron Elevating System Shut Down 
work done this year was done on Station #4
and Station #9.
  
  5   Tuesday, September 25, 2012, 08:57 maicodallavalleElevation JackMaintenance2012 Service Maintance of #4 Station Jacking System Shut down work for 2012.Replaced serviced
Jacking Station #6. Tapered alignment pins
were damaged. They were skimmed and checked
  
  174   Tuesday, May 07, 2024, 09:35 Adam NewsomeElevation JackStandard Operation Lid down operation (third) - 2024 A third lid down
operation took place over May 6-7, 2024.
 Motor_Contactor_6_-_2024.PNGElevation_System_Checklist_-_2024_Lid_down_-_third.pdf 
  149   Thursday, February 02, 2023, 07:05 maicodallavalleService BridgeRepair Hinged Festoon Rail at Cyclotron The Hinged section of the festoon rail
at Cyclotron has a piston to keep rail in
the up position for shutdown work (Bridge
  
  191   Wednesday, October 16, 2024, 11:37 Adam NewsomeService BridgeDevelopment Bridge Lift Mechanism Refurbishment (Phase 2 of 2) - Complete See previous e-log for phase 1: e-log