ID |
Date |
Author |
Category |
Type |
Subject |
Text |
|
86
|
Friday, February 05, 2016, 08:48 |
Keith C Ng | Primary Beamlines | Maintenance | 4VVR1 Removal | Returned work permit C2016-01-27-2 due
to tank lid being raised and elevated fields
make the work area un-favourable to work |
|
91
|
Wednesday, March 16, 2016, 17:19 |
Ron Kuramoto | Primary Beamlines | Development | 4VQ3 Removal | On 8March2016, under W/P C2016-03-08-2,
4VQ3 was lifted out of BL4V with the vault
orbit crane where it was first weighed then |
|
92
|
Wednesday, March 16, 2016, 17:57 |
Ron Kuramoto | Primary Beamlines | Development | 4VQ1&Q2 Removal | On 14March2016, 4VQ1&Q2 were
removed from BL4V and lowered into the Vault
basement B3 level where they were stored |
13x |
88
|
Friday, February 19, 2016, 14:03 |
Keith C Ng | Primary Beamlines | Development | 4V CM1 blanking | Continued with work blanking off CM1 flange.
- Placed lead shot on left and right
side of the CM1 flange to lower fields. No |
|
89
|
Monday, February 22, 2016, 16:09 |
Keith C Ng | Primary Beamlines | Development | 4V CM1 blanking |
Rolled
indium into new blanking plate turned down |
|
130
|
Friday, May 06, 2022, 11:27 |
Keith C Ng | Primary Beamlines | Standard Operation | 4V CM1 RH joint install | 2022 Apr 28 to 29:
Installed a new remote handling 4"
indium joint for new beamline 4 north section. |
|
6
|
Thursday, March 01, 2012, 16:01 |
Keith C Ng | Primary Beamlines | Repair | 2C Rad Hard Valve Replacement | 4" indium flanges at the 2C rad hard
valve were cleaned of the remaining indium
by C. Ballard. Both upstream and down stream |
|
111
|
Wednesday, February 14, 2018, 10:36 |
Keith C Ng | Primary Beamlines | Repair | 1a q12 q13 | Uncovered and placed bridges for 1a q12
q13 for doug's re cabling work. See WP C2018-02-13-2:
work |
|
60
|
Friday, January 23, 2015, 15:21 |
Keith C Ng | Primary Beamlines | Maintenance | 1VQ4 joint section (WR #2686) | 1VQ4 & 1VQ6 beamtube was installed
by UCN group. RH provisonally installed aluminum
indium carrier ring with no indium into joint |
|
59
|
Wednesday, January 14, 2015, 11:00 |
Keith C Ng | Primary Beamlines | Maintenance | 1VQ4 & 1VQ6 beamtube removal (WR #2686) | Disconnected and removed beam tube from
1VQ4, 5, 6.
|
|
93
|
Thursday, March 31, 2016, 15:32 |
Keith C Ng | Primary Beamlines | Development | 1VM3 to 1VQ4 joint. | Re-installed indium vacuum joint for 1VQ4,
routing installation. R. Kuramoto sprayed
silicone grease on to the threads and bushings |
|
20
|
Monday, January 14, 2013, 16:36 |
Keith C Ng | Primary Beamlines | Maintenance | 1AVA8 valve o ring replacement | continued with o ring replacement, replaced
all relevant o ring seals on valve (valve
body seal and actuator arm dynamic seals). |
|
19
|
Friday, January 11, 2013, 15:44 |
Keith C Ng | Primary Beamlines | Maintenance | 1AVA8 valve o ring replacement | Assisted vacuum group with removing 1AVA8:
- uncovered valve area and set up
remote handling bridge over valve. |
|
21
|
Tuesday, January 15, 2013, 16:37 |
Keith C Ng | Primary Beamlines | Maintenance | 1AVA8 valve o ring replacement | Job completed today and shielding block
over valve restored.
- He leak checked valve and accessible |
|
74
|
Thursday, March 05, 2015, 08:42 |
Keith C Ng | Primary Beamlines | Repair | 1AT1 area water leak fixes | 1) Quick connect fittings on the rotary
collimator were leaking (the two red collared
fittings in photo below). |
11x |
107
|
Tuesday, January 23, 2018, 15:44 |
Keith C Ng | Primary Beamlines | Repair | 1AQ15 insulator repair | Assisted beamlines in replacing 2 insulators
on 1A Q15 magnet. #10 and #14 insulators
were found to be leaking at the ceramic, |
|
119
|
Tuesday, April 16, 2019, 11:19 |
Ron Kuramoto | Primary Beamlines | Repair | 1AQ14 B/L Flange Broken Thermocouple | On March 7,2019 the Thermocouple (TC) cable
which monitors the temperature of the 1AQ14
B/L vacuum joint was broken when the iron |
|
33
|
Tuesday, February 05, 2013, 16:12 |
Keith C Ng | Primary Beamlines | Maintenance | 1A triplet repair (ground fault) (Completed) | Today: D. Preddy completed another power
test on 1A Q14, 15, 16 after all iron/steel
shielding was restored. Magnet power and |
|
25
|
Wednesday, January 23, 2013, 15:51 |
Keith C Ng | Primary Beamlines | Repair | 1A triplet repair (ground fault) | Continued work on finding ground fault
in 1A triplet magnets;
|
|
26
|
Thursday, January 24, 2013, 17:05 |
Keith C Ng | Primary Beamlines | Repair | 1A triplet repair (ground fault) | Continued with work on finding ground fault
on 1A triplet;
|
|