  672   Wednesday, August 14, 2024, 16:24 Marla CervantesC44139-5 SKLP TUBEIn progressEVAP2 Calibration - Vanadium
 
 

Marla Cervantes wrote:

Marla Cervantes wrote:

Tuesday, August 13, 2024, 17:20 Pressure kept increasing when turning the turbo pump on

Tuesday, August 13, 2024, 18:00 Pressure stayed constant when turning the turbo pump on

Wednesday, August 14, 2024, 10:18

The turbo pump started up normally. System is purging. and tomorrow the target will be heated.



 Wednesday, August 14, 2024, 16:19

A vanadium wire was introduced in a tantalum pouch and snug among the graphite foils of a conditioned graphite target. The V wire was introduced in the Ta pouch to prevent the direct contact of the wire with the carbon and avoid the reaction between them. 

 

As a first approach, the target will be heated to approximately 1377 °C, aiming at the vaporization temperature of the V wire. If the wire does not vaporize, heating with the turbo pump off would be considered to aim at the vanadium's melting point of 1910 °C. 

 

Plan: 

  • The temperature of the tube will be measured from the side on a Ta-foil cap with a two-colour pyrometer, and from the center with a filament pyrometer (a pinhole was made on the tantalum tube heat shields to allow looking at the tube. 
  • The temperature registered by the omega will be used as a rough reference of the temperature range at which the V wire is either melting or vaporizing. 

    • The pressure will be closely monitored to have a reference for the V vaporization.

Vanadium 

Temperature (­°C) 

Vaporization (at 3e-6 Torr) 

1377 

Melting 

1910 

  • Initial ramping: 2 A/min to 200 A.  

    Expected temperature: approx. 1100 °C. Estimated ramping duration  

 

In case of outgassing, let the pressure reduce  
  • Next ramping: 0.5 A/ 2min  to 250 A.

Very slow rate to allow thermal equilibrium and temperature measurements. Estimated time 3h.


Thursday, August 15, 2024, 08:21

IGP1 = 5.3e-7 Torr

Good vacuum 3e-5 Torr

Bad vacuum 5e-5 Torr

Initial ramping: 2 A/min to 200 A.


Thursday, August 15, 2024, 09:01. Pressure starting to increase at 74 A

Thursday, August 15, 2024, 09:15. Pressure stabilizing 1.8e-6 Torr. Current 103 A, voltage 1.3 V


Thursday, August 15, 2024, 09:21. Pressure increasing (116 A).

 Thursday, August 15, 2024, 09:29 Pressure dropping (Current approx. 120 A)


Thursday, August 15, 2024, 10:54

Started ramping to find a pressure peak corresponding to V vaporization.

IGP1 = 6.4e-7

TGHT = 200 A, 2.9 V, omega 1152 °C

Next ramping: 0.5 A/ 2min  to 250 A


Thursday, August 15, 2024, 11:17

Ramp seem to slow. The temperature change was too subtle (according to the omega).

IGP1 = 6.5e-7

TGHT = 205 A, 3.03 V, omega 1157 °C

Next ramping: 1 A/ 2min  to 250 A


Thursday, August 15, 2024, 11:32

Ramp changed to 0.5 A/min


Thursday, August 15, 2024, 11:54

Ramp was stopped because the pressure was increasing, suggesting the V vaporization.

IGP1 = 6.9e-7

TGHT = 222 A, 3.3 V

Omega 1210 °C, filament 1280 °C

The difference between pyrometers is negligible, suggesting that the V vaporization temperature at 6e-7 Torr of approx. 1300 °C


 Thursday, August 15, 2024, 13:15

IGP1 = 7.9e-7

TGHT = 250 A, 3.8 V

Omega 1289 °C


Thursday, August 15, 2024, 13:16

Ramp set to 0.5 A/min to 300 A


 Pressure mini-spike at 13:18

Omega reading 1291 °C


Thursday, August 15, 2024, 14:08

IGP1 = 8.5e-7

TGHT = 270 A, 4.18 V

Omega 1375 °C, filament 1400 °C

The system stayed at those conditions for 15min


Thursday, August 15, 2024, 14:11

Ramping to 0A at 2A/min

 

  600   Monday, November 07, 2022, 14:26 Darwin Ortiz RosalesTaC44139-4TARGET BOATDoneTaC coating sintering

Monday, November 07, 2022, 14:24

The coated container tube was wrapped in four Ta foil heatshields.

Target temperature on OMEGA= 1850-1900 C

OMEGA slope:= 0.990

Target time at max temperature = 4 hours

 

Final TGHT current= ~400A (adjustable)

Heating autoramp starged at 4A/min to 40A

Then at 1A/min on both heaters to 120A.

Good vacuum = 5.0 e-02 Torr

Bad vacuum = 5.0E-04 Torr

 IGP1 initial =

  634   Wednesday, May 24, 2023, 15:23 Darwin Ortiz Rosales 44139-4LP TUBEDoneGraphite inside insert Experiment 1

 

Wednesday, May 24, 2023, 15:22

A Ta container tube was wrapped with 4 Ta heatshields.  Note final container is 45220-11

219 graphite discs were loaded.

a TaC coated Ta spring at the front end.

The system was left to establish vacuum over previous night.

Good vacuum set to5e-04Torr

Bad vacuum was set to 5e-2 Torr

Total weight of system including spring= 250.1 g

OMEGA slope = 0.99

The target will be heated to 2000 C, held there for 10 hours. 

Initial ramp at 1A/min to 200A

Then ramp at 0.5A/min while taking temperature readings periodically unti l250A.

At 250 A will let pressure stabilize and then ramp at 1A/min to 2000C or 450A.  

Will hold at target Temperature or Current for 10 hours before starting ramp-down.


 Wednesday, May 24, 2023, 15:50

Currently heating at 0.5A/min to250A.  Taking temperature/current measurements

IGP1= 1.06e-06 Torr


Wednesday, May 24, 2023, 18:28

heating at 1A/min to 275A to collect more temperature data


Wednesday, May 24, 2023, 19:22

Slight offset between set and RD current observed. 

Ramping at 1A/min to 440A according to the regression below

Should be around 2000 C.


Wednesday, May 24, 2023, 20:22

Currently at 339 A, 4.8V

OMEGA = 1614 C, IGP1= 2.04e-06 Torr

Will ramp up at 2A/min to 450A as new data point suggests


Wednesday, May 24, 2023, 21:05

1730 C   411.0 A 6.9 V

heating curve has new slope suggesting 500A as minimum to reach 2000 C

Increasing ramp to 1A/10s to reach 450A


Wednesday, May 24, 2023, 21:17

TGHT

1804 C   441.0 A 7.4 V

IGP1= 3.9e-06 Torr

Continue ramping to 480A


Wednesday, May 24, 2023, 22:11

Offset between setpoint of current and readback.  readback 10A below. 

1941 C   480.0 A 8.5V

Will keep at this setting until 7:30 am tomorrow then start ramp down @-2A/min


Thursday, May 25, 2023, 07:25

OMEGA=1912C, IGP1 =1.29e-06 Torr, TGHT = 480A, 9.0V

begin ramp down at -2A/min


Thursday, May 25, 2023, 09:52

Some odd current readback behaeviour noticed.  Have contacted Gelo from controls.  He will look at it next week.  Discrepancy between read back and set point and drop in read back currrent. See picture

 

 

Attachment 1: Screenshot_Graphite_insert_Exp1.png
Screenshot_Graphite_insert_Exp1.png
  636   Tuesday, June 06, 2023, 09:14 Darwin Ortiz RosalesC44139-4TARGET BOATDoneGraphite inside insert Experiment 2 (regular formulation discs)

Tuesday, June 06, 2023, 09:11

A Ta container tube was wrapped with 4 Ta heatshields.  Note final container is 45220-6

272 graphite discs were loaded.

a TaC coated Ta spring at the front end.

The system was left to establish vacuum over previous night.

Good vacuum set to5e-04Torr

Bad vacuum was set to 5e-2 Torr

Total weight of system including spring= 253.94 g

OMEGA slope = 0.99

The target will be heated to ~2000 C, held there for 10 hours. 

Initial ramp at 1A/min to 200A

Then ramp at 0.5A/min while taking temperature readings periodically unti l250A.

At 250 A will let pressure stabilize and then ramp at 1A/min to 2000C or 480A.  Will use read back current

Will hold at target Temperature or Current for 10 hours before starting ramp-down.


Tuesday, June 06, 2023, 09:14

 Starting ramt at 1A/min

initial IGP1= 8.2e-07


Tuesday, June 06, 2023, 21:25

@480 A on readback, 1823C on OMEGA.  ramping to 510A set point which should be around 490 RD.  (see heating profile for details)


Tuesday, June 06, 2023, 22:02

ramped to 516 on RD 527 on set.  Will leave for 10 hours

OMEGA =1930 C

 


Wednesday, June 07, 2023, 06:32

OMEGA at 1950 C this morning.  Will continue heating.  Lowered to 1940 C as in experiment 1 this was the top temperature.


Wednesday, June 07, 2023, 07:40

OMEGA= 1940 C

IGP1=1.7-6 Torr

TGHT= 513A, 9.4V

starting ramp down at -2A/min

  593   Thursday, September 29, 2022, 10:02 Darwin Ortiz Rosales 44139-3TARGET BOATDone220926-Graphite conditioning in target tube

Thursday, September 29, 2022, 09:57

A Ta container tube was wrapped with 3 Ta heatshields.

338 graphite discs were loaded.

one Tantalum cup (modified to fit losely) was inserted on the front end along with a Ta spring.

on the backside there is no spring but four discs glued together with PVA

The system was left to establish vacuum over night.

Good vacuum set to5e-04Torr

Bad vacuum was set to 5e-2 Torr

Total weight of system including springs = 249.07 g

OMEGA slope = 0.99

The target will be heated to 2100 C, held there for 10 hours.  The target Temperature vs Power will be tabulated and the current required to reach 2100 will  be extrapolated to avoid using OMEGA at higher temperatures.

a)  The target will be removed, weighed and inspected

b) If the target boat is still good, run again at 10A higher than previous for 2 hours.

c) The target will be removed, weighed and inspected

d) i) If the weight is the same or negligible, experiment ends

  ii) if the weight has decreased and target still intact, repeat from step b and document all measurements and settings


 Thursday, September 29, 2022, 10:04

IGP1= 1.4e-04 Torr

TGHT= 80.0 A, 1.0V

Will allow pressure to drop and then continue heating


Thursday, September 29, 2022, 10:20

IGP1= 7.9e-05 Torr pressure on downward trend

Start heating at 2A/min to 200A


The target started dropping in temperature as current increased.  Suspected OMEGA issue.

Started cooling at -2A/min

Will continue next week.


Monday, October 03, 2022, 11:05

Upon inspection, the window though which the OMEGA laser travels was coated with dark precipitate (mostly a spot in the direct path of the laser).

Cleaned the window and started pumpdown.


Monday, October 03, 2022, 12:57

start heating @2A/20s = 6A/min because the target had previously been heated past additive evaporation point.

IGP1= 3.8e-06 Torr


Monday, October 03, 2022, 18:41

Will heat to 500A and leave for 10 hours.  The regression shows too high current to reach 2100.  Not reasonable.  So will work with 500A as a baseline.

 

 

 


Tuesday, October 04, 2022, 06:52

Temperature @500 A read 1742C

maintained for 10 hours

start rampdown at -2A/min 

OMEGA currently 1099C

Current = 500 A

Voltage =9.9 V

IGP1= 5.9e-7 Torr


Tuesday, October 04, 2022, 21:32

Quartz window was completely covered with graphite like dust.  final weight after heating = 244.57 g (a couple of discs came loose and they were weighed separately and not included in the next heating).

weighted target and added one extra heatshield because it looked like a lot of heat was escaping.  Will treat at 500A again for 2 hours.  The extra heat-shield should provide hotter environment.

new initial weight = 254.24 g (don't have a balance with greater precision .


Wednesday, October 05, 2022, 07:42

IGP1= 3.8e-07 Torr

ramping to 280A @ 3A/min


Wednesday, October 05, 2022, 11:40

ramping to 350 @ 3A/min

Then ramp to 500A

500A at 12:50


Wednesday, October 05, 2022, 15:52

ramping down at -2A/min


Thursday, October 06, 2022, 09:27

IGP1= 1.8e-07 Torr

Will dismount and weigh, then decide how to proceed

 

according to second regression, second heating was ~2000 C.  OMEGA not reliable after 1700 C in this case. 


Thursday, October 06, 2022, 12:34

The final weight after the second heating was = 254.19 g

reinstalled target and cleaned quartz window. 

will heat up to 510 A


Friday, October 07, 2022, 07:46

IGP1=  3.0 e-07 Torr

ramp at 2A/min to 500A.  will pause to take data points for regression.


Friday, October 07, 2022, 13:05

Start rampdown after two hours at 500A, 10.3V

-2A/min

 

  597   Tuesday, October 25, 2022, 12:25 Darwin Ortiz RosalesTaC44139-15-SKLP-SISDoneTaC coating sintering

Tuesday, October 25, 2022, 12:18

Container wrapped in 4 Ta foil heatshields

Target temperature on OMEGA= 1850-1900 C

OMEGA slope:= 0.990

Target time at max temperature = 4 hours

Final Current TBHT= 230A

Final TGHT current= ~420A (adjustable)

Heating autoramp started at 2A/min on both TGHT and TBHT to40A

Then at 1A/min on both heaters to 120A.

Good vacuum = 5.0 e-04 Torr

Bad vacuum = 5.0E-02 Torr


Wednesday, October 26, 2022, 07:07

IGP1= 7.5e-7 Torr

start ramp at 2A/min to 40A


Ramped at 1A/min to 120A then held until pressure drop.  Then ramped @ 4A/min to 400A on TGHT.


Wednesday, October 26, 2022, 14:09 

Manually rampted TGHT to 415A, 6.9V will hold for 4 hours 

OMEGA reads 1870 C initially


Thursday, October 27, 2022, 09:44

was held for 5 hours due to technical issues but should be ok.

OMEGA @ time of rampdown = 1830C

Rampdown @-2A/min TGHT and -1A/min TBHT

IGP1= 3.5e-07 Torr

 

  486   Monday, June 01, 2020, 12:03 Aaron SchmidtTa44139-13LP-SISIn progressTa#60 Conditioning

 Ta#60 LP-SIS target description:

Total Ta foils = 470 [6x20 packs + 350 single discs]

Foil Thickness = 0.025mm

Target density =  14.081 g/cm3

Target length = 3.33 cm

Total Mass =  46.891 g [Incl foils + Ta wire on 6 packs]

Total mass w/ Target oven=  445g w/ end caps)

Discs in target are arranged as follows: 1pack / 75singles / 1pack / 100singles / 2packs / 100singles / 1pack / 75singles / 1pack

End caps installed (Expanded). No Ta heat shield added.

https://elog.triumf.ca/TIS/Target+Production/98


Monday, June 01, 2020, 11:38: Roughing.

Monday, June 01, 2020, 12:03: Turbo pump on. 


TBHT will be ramped up to 230A at 1.0A/min.

TGHT will be ramped up to 600A + at 2.0A/min.

Final desired temperature = 1900C.

OMEGA slope = 0.98.

Tuesday, June 02, 2020, 07:13: Omega slope set to 0.98. Power supplies / sources on. vacuum@ 5.13e-07T.

Tuesday, June 02, 2020, 07:16: Manually tap up TGHT / TBHT to 40 / 5 A. Vacuum @ 5.08e-07T.

Tuesday, June 02, 2020, 07:19: Auto-ramping TGHT / TBHT @ 2 A per min to 350 / 150 A. 

Tuesday, June 02, 2020, 10:02: Auto-ramping TGHT / TBHT @ 2 / 1 A per min to 450 / 200 A. Vacuum @ 1.39e-06T. TGHT Voltage= 5.955V. Omega: 1288 deg C.

Tuesday, June 02, 2020, 11:54: Auto-ramping TGHT / TBHT @ 2 / 1 A per min to 500 / 230 A. Vacuum @ 1.85e-06T. TGHT Voltage= 7.998V. Omega: 1528 deg C.

Tuesday, June 02, 2020, 13:16: Auto-ramping TGHT @ 2 A per min to 550 A. Vacuum @ 2.51e-06T. TGHT Voltage= 9.060V. Omega: 1625 deg C. 

Tuesday, June 02, 2020, 13:58: Auto-ramping TGHT @ 2 A per min to 600 A. Vacuum @ 3.53e-06T. TGHT Voltage= 9.060V. Omega: 1728 deg C. 

Tuesday, June 02, 2020, 14:23: Auto-ramping TGHT @ 2 A per min to 625 A. Vacuum @ 5.56e-06T. TGHT Voltage= 11.236V. Omega: 1821 deg C.

Tuesday, June 02, 2020, 14:36: TGHT / TBHT 625 / 230 A. Vacuum @ 6.65e-06T. TGHT Voltage= 11.724V. Omega: 1865 deg C. 

Tap up TGHT manually.

Tuesday, June 02, 2020, 14:48: TGHT / TBHT 643 / 230 A. Vacuum @ 7.24e-06T. TGHT Voltage= 12.129V. Omega: 1901-1903 deg C.  

Desired temperature = 1900C reached.

Tuesday, June 02, 2020, 22:20: TGHT / TBHT 643 / 230 A. Vacuum @ 2.05e-06T. TGHT Voltage= 12.212V. Omega: 1901-1903 deg C. 

Tuesday, June 02, 2020, 22:22: Auto-Cooling @ 1 A per min. 


Wednesday, June 03, 2020, 06:08: TBHT @ 0. TGHT set for Auto-Cooling @ 2 A per min.

Wednesday, June 03, 2020, 11:38: PS off. Turbo pump off. 

Wednesday, June 03, 2020, 12:40: Venting. 

  487   Thursday, June 11, 2020, 13:01 Darwin Ortiz RosalesEmpty44139-12LP-SISDone 

 Thursday, June 11, 2020, 09:56

Previous day (Wednesday June 10, 2020) 

Container coated with TaC and wrapped with 3 Ta heat shields.

Desired temperature= 1900 C, Omega Slope set = 0.990, Auto TGHT at 0.2A/min to reach 400A, TGHT will be tapped up accordingly to reach desired Temp.

TBHT will be set fixed at 230 A (max).

Good vac at 3.00e -5 Torr

Bad vac at 5.00e-5 Torr

Chamber pump down


Thursday, June 11, 2020, 10:19

IEVAP2:IGP1=1.06e-6 Torr

ramping to 40A (TGHT and TBHT) at 1A/min


Thursday, June 11, 2020, 12:35

IEVAP2:IGP1=1.8e-6 Torr

TGHT = 39.8 A, 0.45V

TBHT=38.5 A, 0.48V

Manually rampted to 45A on both TGHT and TBHT 


Thursday, June 11, 2020, 12:58

IEVAP2:IGP1=1.6e-6 Torr

TGHT = 34.8 A, 0.52V

TBHT=44.2A, 0.55V 

Start Autoramp at .5A/min to 400A on TGHT and 230A on TBHT


Thursday, June 11, 2020, 17:14

Irregular pressure profile.  Cooling .  Need to check for leak.

TGHT = 99 A 1.3 V

TBHT = 99 A 1.4 V


Friday, June 12, 2020, 12:59

Restarting ramping

IGP1= 4.98e7 Torr

Autoramp at 1A/min to 400A on TGHT and 230A on TBHT

(pressure and TGHT current and voltage profile seem normal compared to previous coating sintering with the same power supply)


Friday, June 12, 2020, 14:40

Paused ramping

TGHT = 90A

After a few minutes the profile (noise) was still there.  Continue autoramp at 0.5A/min to 400 A on TGHT and 230A on TBHT


Friday, June 12, 2020, 15:21

IGP1= 1.97e-06 Torr trending down

TGHT = 111.5 A , 1.5 V

TBHT = 112.9 A, 1.9 V

Increase ramping speed to 1A/min to 400A on TGHT and 230A on TBHT


Friday, June 12, 2020, 20:50

OMEGA = 1754 C

IGP1= 2.5e-6 Torr

TGHT = 394.1 A, 6.6 V

TBHT = 232.8 A, 4.0 V 

Tapping to 1900 C


Friday, June 12, 2020, 21:00

OMEGA =1901 C

IGP1= 5.6e-6 Torr

TGHT = 448.3 A, 7.5 V

TBHT = 232.8 A, 4.1 V


Saturday, June 13, 2020, 00:51 

 OMEGA = 1898 C

IGP1 = 2.0e-6 Torr

TGHT = 447.2 A, 7.5 V

TBHT = 232.9 A, 4.1 V

Start cooling at -2A/ min for TGHT and -1A/min for TBHT

 

 

 

 

Attachment 1: WO#_44139-12_TaC_sintering.PNG
WO#_44139-12_TaC_sintering.PNG
  479   Wednesday, March 18, 2020, 07:21 Marla CervantesTaC44139-11LP-SISDoneTaC coating/sintering

 Wednesday, March 18, 2020, 07:10

Ta tube was coated with TaC and wrapped with Ta heat-shields (3 layers)

Desired temperature= 1900 C (expected TGHT ~430 A), TBHT will be set fixed at 230A (max).

Evap 2 was pumped down on the previous night.

Good vacuum= 3.00 e-5 Torr

Bad vacuum = 5.00 e-5 Torr

Ramped TGHT and TBHT to 40A at 0.5A/min

Initial pressure IGP1 = 4.8e-7Torr


 Wednesday, March 18, 2020, 09:29

After an hour pressure reduced to 5.45e-6 Torr

TGHT; 0.518 V, 40.5 A

TBHT: 0.41 V, 38.6 A

Autoramp TGHT and TBHT at 1A/min to 400A and 230A respectively.


 Wednesday, March 18, 2020, 18:29

TGHT = 400A, 6.6V, TBHT= 232.9, 3.9V

OMEGA = 1240 C, this is 500 degC lower than previous LP-SIS at same conditions

https://elog.triumf.ca/TIS/Evaporator_2/464

Start autoramp to 460A on TGHT at 1A/min


Wednesday, March 18, 2020, 20:51

TGHT: 464 A, 7.75 V

Temperature 1328, I won't increase the temperature because there is a chance that the reading is 500 degC off and the target is sitting at 1828 degC instead of 1328 degC 


Wednesday, March 18, 2020, 23:17

After ~4 hours at 1317 degC according to the pyrometer:

TGHT = 7.7 V, 457.8 A,

TBHT = 3.9 V, 232.9 A,

IGP1 = 1.16e-6

Commence cooling at -2A/min for TGHT and -1A/min for TBHT


Thursday, March 19, 2020, 15:53

Venting and dismounting.

The coating does not have the quality to be used online, another LP-SIS will be coated and sinter

Attachment 1: IMG_1538.JPG
IMG_1538.JPG
  483   Sunday, May 24, 2020, 13:39 Marla CervantesEmpty44139-11LP-SISDoneTaC coating/sintering

 Sunday, May 24, 2020, 06:54

Ta tube was coated with TaC and wrapped with Ta heat-shields (3 layers)

Desired temperature= 1900 C (expected TGHT ~430 A), TBHT will be set fixed at 230A (max).

Evap 2 was pumped down

Good vacuum= 3.00 e-5 Torr

Bad vacuum = 5.00 e-5 Torr

Ramped TGHT and TBHT to 40A at 0.5A/min

Initial IGP1 = 2.5e-7 Torr


Sunday, May 24, 2020, 08:24

Autoramp deliver 40 A

TGHT = 0.58 V, 39.6 A

TBHT = 0.46 V, 39.81 A

IGP1 = 2.9 e-7 Torr and increasing

Heater conditions will be hold for 15 min to account for pressure changes.


 Sunday, May 24, 2020, 08:39

IGP1 = 2.7e-7 Torr and decreasing

Autoramp TGHT and TBHT at 1A/min to 400A and 230A respectively.


 Sunday, May 24, 2020, 14:57

After 15 min the autoramp stopped

TGHT = 6.8 V, 394.65 A

TBHT =4 V, 232.9 A

IGP1 = 2.2e-6 Torr and going down

Omega = 1747 degC

Autoramp set to TGHT 1A/min to 450A


Sunday, May 24, 2020, 16:07

After 15 min the autoramp stopped

TGHT = 7.7 V, 448 A

IGP1 = 2.88e-6 Torr

Omega = 1886 degC

The current will be increased manually to reach 1900 deg C

Final TGHT = 7.9 V, 453.15 A (455 A input)

Omega = 1899 degC

The TGHT and TBHT will leave at current conditions until pressure reduce (approx 4 hours)


Sunday, May 24, 2020, 20:01

TGHT = 7.9 V, 456 A

TBHT = 4 V, 232.9 A

IGP1 = 1.8e-6 Torr

Omega = 1893 degC

Initiating auto-cool at -2.0A/min and -1.0A/min for the TGHT and TBHT respectively.

Attachment 1: TaC-coating-sintering.PNG
TaC-coating-sintering.PNG
  490   Thursday, July 16, 2020, 11:15 Darwin Ortiz RosalesSiC44139-11LP-SISDoneSiC sintering for Luca 1 of 2

 Thursday, July 16, 2020, 11:15

Coated Ta tube cotaining 233 SiC disks wrapped with Ta heat-shields (3 layers)

Desired temperature= 1800C (expected TGHT 410 A), TBHT will be set fixed at 230A (max).

Evap 2 was pumped down


 Friday, July 17, 2020, 08:49

Total length packed approximately 10 cm

container has 3 Ta heat shields.

No endcaps inserted to facilitate out-gassing

Two TaC coated Ta wire springs inserted at both ends.

Initially to ramp TGHT and TBHT to 40 A at 0.5 A/min

Then heat ramping TGHT manually and automatically  to reach 400 A  (Omega slope set = 0.990)

Then ramp to temperature = 1800 C

TBHT will be set fixed at 230 A (max).  TBHT heated manually and automatically to max.

Good vac at 3.00 e -5 Torr

Bad vac at 5.00 e-5 Torr

Initial IGP1 = 6.45e-07 Torr

 


 

Friday, July 17, 2020, 20:49

TBHT = 38.9 A, 0.47 V

TGHT = 39.7 A, 0.59 V

IGP1 = 9.1e-06 Torr

Autoramp to 50 A at 0.5 A/min for both TGHT and TBHT


 Saturday, July 18, 2020, 09:04

IGP1 = 1.6e-06 Torr

TGHT = 50.5 A, 0.76V

TBHT = 49.7 A, 0.62 V

Starting autoramp at 0.5 A/ min to 400 A TGHT and 230 A TBHT


Saturday, July 18, 2020, 10:17

IGP1 = 5.06e-05 torr

stopped autoramp and allow pressure to decrease and stabilize


Saturday, July 18, 2020, 10:47 

IGP1 = 6.65 e-06 Torr and trending down

TGHT = 55.4 A, 0.83 V

TBHT= 54.6 A, 0.68 V

Change autoramp to 0.25 A/min for both heaters (.05 increments and 120s wait) 


Sunday, July 19, 2020, 08:46 

 IGP1= 2.2 e-05 Torr

TBHT = 109.5 A, 1.6 V

TGHT = 106.6 A, 1.7 V

increased ramping rate to .5A/min by decreasing wait intervals to 60 s


Sunday, July 19, 2020, 14:55 

IGP1 = 7.1 e -06 Torr

TGHT = 271.8 A, 4.7 V

TBHT = 233.1 A, 4.1 V

Increasing ramping rate to 1 A/min 


 Sunday, July 19, 2020, 17:35

IGP1 = 2.6e-06 Torr

TGHT = 400 A, 7.2 V

TBHT = 233 A, 4.1 V

Tap manually  to 410 (expected 1800 C )

Note*  OMEGA reading cannot be obtained.  

Leave at 410 A on TGHT for 4 hours.


Sunday, July 19, 2020, 22:57

IGP1 = 7.0 e-07 Torr

TGHT= 410 A , 7.2 V

TBHT = 233 A, 4.2 V

Start cool down at -2A/min for TGHT and -1A/min for TBHT

 


 Monday, July 20, 2020, 12:20

IGP1 = 2.2e-07 Torr

Unloading target

  491   Monday, July 20, 2020, 19:25 Darwin Ortiz RosalesSiC44139-11LP-SISDoneSiC sintering for Luca 2 of 2

Monday, July 20, 2020, 19:27 

Coated Ta tube cotaining 355 SiC disks wrapped with Ta heat-shields (3 layers)

Desired temperature= 1800C (expected TGHT 410 A), TBHT will be set fixed at 230A (max).

good vacuum = 3.00 e-05 Torr

bad vacuum = 5.00 e-05 Torr

Evap 2 was left to pump down over night.


 Monday, July 20, 2020, 23:06

IPG1 = 3.1e-06 Torr

Start autoramp at .25A/min to 40A for both TGHT and TBHT


Tuesday, July 21, 2020, 08:06

TGHT = 40.3 A, 0.51 V

TBHT = 39.0 A, 0.46 V

increase auto ramp limit to 50 A for both TGHT and TBHT 

IGP1=1.8e-05 Torr

 


Tuesday, July 21, 2020, 16:22

IGP1= 1.5 e-05 Torr 

TGHT = 50.1 A, 0.65 V

TBHT = 50.0 A, 0.60 V

 Change ramp target to 350 A for TGHT and 230A for TBHT


Wednesday, July 22, 2020, 13:24

Stopped autoramp.  Will allow pressure to drop. 

TGHT = 64.0 A, 0.86 V

TBHT = 64.5 A, 0.82 V 

 

Thursday, July 23, 2020, 23:55

TGHT Reached 430 A,  7.7 V

OMEGA reads 1310 C but reading is not considered accurate so will leave at this current for 4 hours.


Friday, July 24, 2020, 11:31

IGP1 = 1.98e-07 Torr

Window for pyrometer was coated with condensate.  

Dismounted target and cleaned two windows in line with the pyrometer.

 

 

 

  546   Thursday, April 08, 2021, 08:25 Aaron SchmidtTa44139-10LP-SISIn progressConditioning Ta#62 & Flex - line HS installed

 Ta#62 LP-SIS target description:

Total Ta foils = 470 [6x20 packs + 350 single discs]

Foil Thickness = 0.025mm

Target density = 13.96 g/cm3

Target length = 3.4 cm

Total Mass = 47.461 g [Incl foils + Ta wire on 6 packs]

Total mass w/ Target oven= 445 g (w/ end caps)

Discs in target are arranged as follows: 1pack / 75 singles / 1pack / 100 singles / 2packs / 100 singles / 1pack / 75 singles / 1pack

End caps installed (expanded). No Ta foil heat shield added


TBHT will be ramped up to 230A 

TGHT will be ramped up to 600A +

Final desired temperature = 1900C.

OMEGA slope = 0.98.

Thursday, April 08, 2021, 08:24: Roughing.

Thursday, April 08, 2021, 09:06: Vent & check. Roughed to only 20 T. 

Thursday, April 08, 2021, 09:18: Roughing. Loose flange found. Left side wall / upper right. 

Thursday, April 08, 2021, 09:34: TP1 on. 

Thursday, April 08, 2021, 14:41: Vacuum @ 1.65e-06T. Waterline opened.

Thursday, April 08, 2021, 14:46: Vacuum ok. Power on. TGHT / TBHT to 20 / 15 A. Ok.

Thursday, April 08, 2021, 14:50: Auto-ramping TGHT / TBHT to 300 / 100 A @ 2 A per min.


Friday, April 09, 2021, 05:08: Vacuum @ 6.23e-07T. Temp @ 1195 C. Auto-ramping TGHT / TBHT to 400 / 150 A @ 2 A per min.

Friday, April 09, 2021, 06:01: Vacuum @ 9.64e-07T. Temp @ 1447 C. Auto-ramping TGHT / TBHT to 500 / 200 A @ 2 A per min.

Friday, April 09, 2021, 07:23: Vacuum @ 1.92e-06T. Temp @ 1671 C. Auto-ramping TGHT / TBHT to 600 / 230 A @ 2 / 1 A per min.  

Friday, April 09, 2021, 08:40: Vacuum @ 3.96e-06T. Temp @ 1877 C. Auto-ramping TGHT / TBHT to 620 A @ 1 A per min.   

Friday, April 09, 2021, 09:10: Vacuum @ 3.60e-06T. Temp @ 1915 C. Drop TGHT from 620 A to 610 A manually.

TGHT to 613 A manually.

Friday, April 09, 2021, 09:15: Vacuum @ 3.60e-06T. Temp @ 1902 C. TGHT / TBHT @ 613 A / 230 A. Desired temperature reached.

Friday, April 09, 2021, 12:08: Auto-cooling @ 1 A per min initiated. 


Monday, April 12, 2021, 07:23: PS / Turbo pump / roughing pump off. 

Monday, April 12, 2021, 08:03: Vented. 

  461   Thursday, October 03, 2019, 09:26 Darwin Ortiz RosalesTaC44062-6LP-SISDoneTaC coating/sintering

Thursday, October 03, 2019, 08:58

Ta tube was coated with TaC and wrapped with Ta heat-shields (3 layers)

Initial weight including heat-shields = 427 g

Desired temperature = 1900 C (expected TGHT ~430 A), TBHT will be set fixed at 230A (max).

Evap 2 was pumped down previous night.

IGP1= 7.81e-07 Torr

Manually tapping up to ~40A on both TGHT and TBHT at ~1A/min

Good vacuum = 3.00 e-5 Torr

Bad vacuum = 5.00 e-5 Torr


Thursday, October 03, 2019, 09:21

Manually tapped to 50A on TGHT and TBHT

Will allow pressure to stabilize and begin autoramp TGHT and TBHT at 1A/min to 400A and 230A respectively.

autoramp increments might be increased to 2A/min depending on stability of system.


Thursday, October 03, 2019, 10:00

TGHT = 51.6A, 0.36V

TBHT = 49.5A, 0.62V

IGP1=9.6e-7 Torr

Starting autoramp at 1A/min to a max of 400A for TGHT and 230A for TBHT.  Will monitor and increase ramp increments to 2A/min if stable.


Thursday, October 03, 2019, 11:09

TGHT = 103A, TBHT=97A

IGP1=9.1e-06 Torr and dropping

Will increase autoramp increments to 2A/min


Thursday, October 03, 2019, 11:41

With TGHT = 148A, 1.9V and TBHT = 141A, 2.3V

IGP1= 7.9e-6 Torr

Autoramp was increased to 3A/min


Thursday, October 03, 2019, 13:45

TGHT=401A, 6.9V

TBHT=233A, 4.2V

IGP1= 1.14e-05Torr

OMEGA = 1874

begin manual ramp to 1900C

(Temperature dropping as pressure drops)


 Thursday, October 03, 2019, 14:11

 TGHT= 416A, 7.1V

TBHT=233A, 4.2V

OMEGA = 1900 C

IGP1= 6.9e-06 Torr and trending down


Thursday, October 03, 2019, 15:24

TGHT manually bumped to 421A,  7.2 V because temperature dropped slightly.

Thursday, October 03, 2019, 19:00

TGHT manually increased to 425A, 7.3V

 


Thursday, October 03, 2019, 19:12

TGHT = 424.9A, 7.3V

TBHT=233.2A, 4.1V

OMEGA= 1897 C

IGPA=1.45e-06 Torr

Starting ramp-down at -1A/min on TGHT and 0.5A/min on TBHT


Friday, October 04, 2019, 11:34

Container taken out.

 

  457   Monday, September 16, 2019, 14:50 Aaron SchmidtTa44062-5LP-SISIn progressConditioning Ta#59

 Ta#59 LP-SIS target description:

Total Ta foils = 470 [6x20 packs + 350 single discs]

Foil Thickness = 0.025mm

Target density =  13.74 g/cm3

Target length = 3.4 cm

Total Mass =  46.7314 g [Incl foils + Ta wire on 6 packs]

Total mass w/ Target oven=  436 g (440 g w/ end caps)

Discs in target are arranged as follows: 1pack / 75singles / 1pack / 100singles / 2packs / 100singles / 1pack / 75singles / 1pack

End caps installed (not yet expanded). No Ta heat shield added.


Monday, September 16, 2019, 14:47: Roughing. 

Monday, September 16, 2019, 14:55: Turbo pump on. 

Monday, September 16, 2019, 15:04: Timed out. Open RV1

Monday, September 16, 2019, 15:05: Restart Turbo pump.

Monday, September 16, 2019, 15:14: Attempt stop / restart before timeout. 

Monday, September 16, 2019, 15:21: Turbo pump unable to pass 4krpm. Close for re-attempt tomorrow am.


Tuesday, September 17, 2019, 12:33: Venting. Sort out pump down issues.


TBHT will be ramped up to 230A at 1.0A/min.

TGHT will be ramped up to 650A at 2.0A/min.

Final desired temperature = 1900C.

OMEGA slope = 0.98.

Wednesday, September 18, 2019, 08:50: Omega slope set to 0.98. Power supplies / sources on. vacuum@ 3.34e-05T & dropping. 

Wednesday, September 18, 2019, 08:25: Roughing.

Wednesday, September 18, 2019, 08:34: Turbo pump on. 

Wednesday, September 18, 2019, 10:22: TGHT manually to 40A. Vacuum @ 3.18e-06T.

Wednesday, September 18, 2019, 10:25: Auto-ramping TGHT / TBHT @ 2 / 1 A per min to 350 / 180 A. 

Wednesday, September 18, 2019, 13:43: Vacuum @ 2.30e-06T. Temp @ 1120 deg C. TGHT / TBHT @ 350 / 180 A. 

Wednesday, September 18, 2019, 13:45: Auto-ramping TGHT / TBHT @ 2 / 1 A per min to 550 / 215 A.  


Thursday, September 19, 2019, 06:39: Vacuum @ 8.79e-07T. Temp @ 1722 deg C. TGHT / TBHT @ 550 / 215 A.  

Thursday, September 19, 2019, 06:42: Auto-ramping TGHT / TBHT @ 2 / 1 A per min to 600 / 230 A.   

Thursday, September 19, 2019, 08:18: Auto-ramping TGHT to 630A @ 2 A per min

Step up to desired temp

Thursday, September 19, 2019, 08:49: Vacuum @ 3.22e-06T. TGHT / TBHT 645 (642.7) / 230 (233.44) A. TGHT Voltage= 12.501V. Omega: 1902-1903 deg C. Desired temperature = 1900C reached. 

Thursday, September 19, 2019, 14:17: Vacuum @ 1.45e-06T. Begin auto-cooling TGHT / TBHT @ -1 / -1 A per min. 


Friday, September 20, 2019, 07:59: Turbo pump off. PS / Sources off. 

Friday, September 20, 2019, 08:42: Venting. 

Attachment 1: Ta#59_Evap_2_Conditioning..docx
  455   Friday, September 06, 2019, 11:58 Darwin Ortiz Rosales 44062-4LP-SISDoneTaC coating/sintering

Friday, September 06, 2019, 11:20

Container was coated with Tac and wrapped with 2 Ta heat shields.

Desired temp=1900 C, Omega slope set =0.990

Chamber pumped down over night and will be initially tapped manually to 40A for both TGHT and TBHT.

Subsequently, current will be automatically ramped up in increments of 1A/min to reach 400A for TGHT and 230A for TBHT.

Then TGHT will be manually tapped to target temperature and allow to stabilize for a minimum of 3 hours.

Good vac at 3.0e-5 Torr

Bad vac at 5.0e-5 Torr


Friday, September 06, 2019, 11:32

IEVAP2:IGP1=9.6e-7 Torr

Tapping to 40A (TGHT and TBHT).


Friday, September 06, 2019, 12:54

Start autoramp

1A/min TGHT and TBHT

IGP1=4.0e-06 Torr


Friday, September 06, 2019, 13:29

TGHT = 70A, TBHT=70A, pressure started to spike rapidly so aborted autoramp and lowered the current to 66A for both TGHT and TBHT.

pressure continued to rise so tapped current to 60A.  A drop observed.  Will allow to stabilize.


Friday, September 06, 2019, 14:06

IGP1=5.3e-06 Torr.  Restart previous ramping. 


At 66A paused ramping.  IPG1= 1.0e-5 Torr

Friday, September 06, 2019, 15:44

IGP1=6.0e-6 Torr

Start modified autoramping: 0.4A/min for TGHT and TBHT.  Will manually tap up in the morning, over ham and eggs. 


Saturday, September 07, 2019, 10:52

 Will tap up to 423 A on TGHT as per attachment #1 regression

IGP1= 1.13e-6 Torr

OMEGA = 1802 C

TGHT= 401.0 A, 6.84V

TBHT=233.6A, 4.1V


Saturday, September 07, 2019, 11:06

Tapped up TGHT to 438A

OMEGA= 1903C

Will monitor and adjust if necessary.


Saturday, September 07, 2019, 15:06

IGP1 =  1.17e-6 Torr

TGHT = 7.46 V, 439.3 A

TBHT = 4.13 V, 233.4 A

Autoramps

TGHT = -2 A/min, TBHT = -1 A/min


Monday, September 09, 2019, 16:34

The EVAP2 was vented and the target container was removed. 

 

Attachment 1: 190906LPSIS_Sintering.PNG
190906LPSIS_Sintering.PNG
  456   Wednesday, September 11, 2019, 15:16 Marla Cervantes 44062-4LP-SISDoneTaC coated target container calibration/conditioning

 Wednesday, September 11, 2019, 15:12

A target container coated with TaC elog 455 was loaded with an empty graphite cartridge and set it in the EVAP2

The system is currently pumping down.

The target container was wrapped with 3 new Ta heat shields.

The target container will be heated to 2000 C and the temperature will be held for 4 hours.


 The autoramp was set to:

TGHT 1 A/min, 450 A

TBHT 0.5 A/min, to 230 A


At 500 A on the TGHT, 20 additional amps were programmed to increased at 1 A/min, however, the autoramp increased the current to 520 A without stepping (see figure A). 


The final conditions were:

TGHT: 9.95 V, 565.59 A

TBHT: 4.18 V, 233.43 A

IGP1: 2.2 e-6 Torr


Friday, September 13, 2019, 11:16

After 4 hours the EVAP2 was cooled down

at a rate of TGHT 1 A/min and TBHT 0.5 A/min

The EVAP2 was vented with air.


 

Attachment 1: A.JPG
A.JPG
Attachment 2: B.JPG
B.JPG
  464   Thursday, October 17, 2019, 13:53 Darwin Ortiz RosalesTaC44062-3LP-SISIn progressTaC coating/sintering

Thursday, October 17, 2019, 12:00

Ta tube was coated with TaC and wrapped with Ta heat-shields (3 layers)

Desired temperature= 1900 C (expected TGHT ~430 A), TBHT will be set fixed at 230A (max).

Evap 2 was pumped down on the previous night.

Good vacuum= 3.00 e-5 Torr

Bad vacuum = 5.00 e-5 Torr

Ramped TGHT and TBHT to 40A at 0.5A/min

Initial IGP1= 7.0 e-07 Torr


Thursday, October 17, 2019, 13:53

After pressure stabilization at 40A:

 Autoramp TGHT and TBHT at 1A/min to 400A and 230A respectively.


 Friday, October 18, 2019, 6:20

TGHT = 400A, 6.52V, TBHT= 233A, 4.1V

OMEGA = 1733C

Start autoramp to 430A on TGHT at 1A/min


Friday, October 18, 2019, 7:05

TGHT= 431A, 7.1V

TBHT= 233A, 4.1V

IGP1= 1.13e-06 Torr

OMEGA = 1828 C

Set autoramp to 465 at 1A/min


Friday, October 18, 2019, 11:13

TGHT = 465A, 7.8V, TBHT = 233A, 4.1V

OMEGA = 1865C

(Something is different with the heat dissipation on this target.  Will leave at this current and start cooling at 1200 noon to avoid container strain)


 Friday, October 18, 2019, 12:00

TGHT = 462.7A, 7.8V

TBHT= 233.4A, 4.1V

OMEGA = 1863C

IPG1= 1.02e-06 Torr

Commence cooling at -2A/min for TGHT and -1A/min for TBHT


 Monday, October 21, 2019, 09:11

Pump down and dismount.

 

  454   Wednesday, August 28, 2019, 05:59 Marla Cervantes 44062-2-SK DoneGraphite insert test

Wednesday, August 28, 2019, 06:00

A graphite insert (with conical caps) was loaded in tantalum tube 

the Ta tube was wrapped with 3 tantalum foils,

a tantalum cap was inserted in one side of the Ta tube and sealed.

The tube was set in the EVAP2 and the furnace was pumped down.

IGP1 = 1.23e-6 Torr.

The current was tapped to 50 A

Autoramp was set to 1 A/min to 400 A.


 Wednesday, August 28, 2019, 12:02

Autoramp reached 400 A

TGHT = 6.57 V, 404.4 A, IGP1=4.7e-6 Torr

Autoramp was set to 450 A at 1A/min


 Wednesday, August 28, 2019, 12:48

Autoramp reached 450 A

TGHT =7.526 V, 450.188 A, IGP1=5.88e-6 Torr

Autoramp was set to 500 A at 1A/min


Wednesday, August 28, 2019, 13:40

Autoramp reached 500 A, temperature 1880 C

TGHT =8.79 V, 501.094A, IGP1=7.48-6 Torr

Autoramp was set to 540 A at 1A/min 


Wednesday, August 28, 2019, 14:03

The autoramp was stopped at 520 A, because according to previous tests that current is enough to have 2000 C,

the temperature read was 1930 C

TGHT =9.23 V, 520.7 A, IGP1=7.8-6 Torr


Wednesday, August 28, 2019, 15:20

The autoramp was set to 540 A at 1A/min

When the ramp stopped the conditions were:

TGHT=9.59 V, 539.5 A, IGP1= 6.08e-6 Torr

Temperature= 1988 C

Manually tapped to 545 A the temperature reached 2000 C


Wednesday, August 28, 2019, 17:08 

To keep the temperature at 2000 or less the current was decreased,

TGHT= 8.91 V, 445.125 A, IGP1=9.93e-7 Torr

Max temperature read: 2001 C

Min temperature read: 1996 C


Tuesday, September 03, 2019, 11:15

The tube was stable at 1950-1960 C during the weekend but today at around 6 am it had a drop in the current indicating mechanical failure 

The autoramp was set to -2A/min to 0 A. 

The tube will be examined and in case that it is not broken it will be set in the EVAP1 to continue heating it.


Monday, September 09, 2019, 16:35  

The tube became brittle and broke.

  446   Friday, May 24, 2019, 15:29 Marla Cervantes 43943-2 DoneGraphite insert test

Friday, May 24, 2019, 15:26

 A graphite insert with tantalum wires in its caps

was loaded in a tantalum tube, the system will be heated to 2000 C

and after 6 hrs at that temperature, it will be cooled and heated to 2000 C again.

The temperature will be hold at 2000 C for a 6 days.

Currently the chamber is being evacuated.


 Saturday, May 25, 2019, 06:01

IGP1 = 2.2e-7 Torr

Manually tapping to 50 A

Autoramp set to 1 A/min to 400 A


Saturday, May 25, 2019, 13:37

The autoramp was set to 450 A

Then it was manually tappe to 475 A 

ELOG V2.9.2-2455