Tuesday, October 13, 2020, 11:15, Ferran Boix Pamies, Empty, 44139-7-SK, TARGET BOAT, Done, foil heating
|
2020-10-13 11:13 Target was left under vacuum over the weekend. IGP1: 1.6e-7T water on- leak check ok. Ramping up 2A/30s to 100A.
2020-10-13 11:47 All ok at 100A. Ramping up, 1A/10s to 200A.
2020-10-13 12:08 All ok at 200A. Temp tc on foil 200degC. Ramping up, 1A/10s to 300A.
2020-10-13 12:08 All ok at 300A. Temp tc on foil 340degC. Ramping up, 1A/10s to 400A.
2020-10-13 12:48 All ok at 400A. Temp tc on foil 474degC. pyro shows 1050degC Ramping up, 1A/10s to 500A.
2020-10-13 13:06 All ok at 500A. Temp tc on foil 615degC. pyro shows 1238degC Ramping down, 1A/10s to 0A.
2020-10-13 17:04 The foil has been replaced due to suspected radiation transparency being the cause of low measured temperatures. A graphite and tantalum pack is now attached. Vacuum is back to IGP1: 9.5e-6T. Ramping up to 100A, 1A/10s.
2020-10-13 17:31 All ok at 100A. Temp tc on foil 80degC. Ramping up, 1A/10s to 200A.
2020-10-13 17:31 All ok at 200A. Temp tc on foil 310degC. Ramping up, 1A/10s to 300A.
2020-10-13 17:31 All ok at 300A. Temp tc on foil 468degC. Ramping up, 1A/10s to 400A.
2020-10-13 17:31 All ok at 400A. Temp tc on foil 598degC. Ramping up, 1A/10s to 500A.
2020-10-13 17:31 All ok at 500A. Temp tc on foil 700degC. Ramping up, 1A/10s to 600A.
2020-10-13 17:31 All ok at 600A. Temp tc on foil 760degC. Ramping down, 1A/20s to 0A.
2020-10-14 17:09 foils for radiation focusing have been replaced and doubled to reduce transmission. IGP1:1.5e-5T , water leak check ok. Ramping up to 100A 1A/10s.
2020-10-14 17:30 All ok at 100A. Temp tc on foil 60degC. Ramping up, 1A/10s to 500A.
2020-10-14 17:50 All ok at 200A. Temp tc on foil 378degC.
2020-10-14 18:10 All ok at 300A. Temp tc on foil 550degC.
2020-10-14 18:10 All ok at 400A. Temp tc on foil 705degC.
2020-10-14 18:10 All ok at 500A. Temp tc on foil 816degC.Ramping up, 1A/10s to 600A.
2020-10-14 18:10 All ok at 600A. Temp tc on foil 906degC.Ramping up, 1A/10s to 625A.
2020-10-14 18:10 All ok at 625A, IGP1: 1.3e-5T. Temp tc on foil 924degC.Ramping up, 1A/10s to 650A.
2020-10-14 19:21 All ok at 650A. Temp tc on foil 940degC.Ramping down, 1A/10s to 0A. Pyrometer on foil 1200degC
|
Thursday, October 15, 2020, 18:51, Ferran Boix Pamies, Empty, 44139-7-SK, TARGET BOAT, Done, heat gun plus parasitic target thermal comissioning.
|
2020-10-15 18:51 : Setup installed during the day. Pumped down to IGP1:1.5e-5T , water leak check ok. Ramping up to 100A.
2020-10-15 19:30 : A heating element was showing bad signs and failed very early. ramping down and venting. |
Tuesday, October 27, 2020, 10:25, Ferran Boix Pamies, Empty, 44139-7-SK, TARGET BOAT, Done, parasitic target commissioning
|
2020-10-27 10:24 setup introduced yesterday. Pumping over night IGP1: 5.7e-7T. Water leak check ok. Performing heating elements check.
2020-10-27 10:43 Heating elements check show low cooling. Ramping up target 1A/15s to 200A.
2020-10-27 11:54 all ok 200A, thermocouples show room temperature on cartridge and heat shield. Ramping up target 2A/10s to 300A.
2020-10-27 11:54 all ok 300A, thermocouples show 28/25degC. Ramping up target 2A/10s to 400A.
2020-10-27 11:54 all ok 400A, thermocouples show 36.5/29degC. Ramping up target 2A/10s to 500A.
2020-10-27 11:54 all ok 500A, thermocouples show 48.9/33degC. Ramping up target 2A/15s to 550A.
2020-10-27 12:43 all ok 550A, thermocouples show 55/34degC. Ramping up target 2A/15s to 600A.
2020-10-27 12:43 all ok 600A, thermocouples show 61.5/35.2degC. Ramping up target 2A/15s to 625A.
2020-10-27 13:14 all ok 625A, thermocouples show 64.6/34.2degC. Ramping up target 2A/15s to 650A. |
Monday, November 02, 2020, 18:32, Ferran Boix Pamies, Empty, 44139-7-SK, TARGET BOAT, Done, HEA heat treatment 
|
2020-11-02 6:32: roughing on
2020-11-02 7:21: Turbo on for a while, IGP1:1.8e-5T . water leak check ok.
2020-11-02 7:47: IGP1:1e-5T . Ramping up target heater to 200A, 1A/10s.
2020-11-02 7:47: TGHT at 275A, pyrometer at 1300degC. Leaving it hot for 24h.
2020-11-04 9:06: After 37h treatment, ramping down to 0A.2A/10s.
2020-11-04 9:46: target ramped down. Venting.
2020-11-04 17:30: Big amounts of outgassing non detected in GP1 coated some inner walls in evap2. The walls got cleaned with acetone. All as before now.
 |
Thursday, April 15, 2021, 18:33, Marla Cervantes, Ta, 44139-6-SK, TARGET BOAT, Done, Carbon penetration on Ta
|
Thursday, April 15, 2021, 18:24
Tantalum samples were loaded in a tantalum testing tube and installed in the EVAP2 to heat under vacuum for 3 days at 2000 degC (~500A, 4kW).
The temperature is measured with the Omega pyrometer (slope 0.98)
Some of the samples are in contact with graphite and enclosed with Ta caps, the other samples are not in contact with carbon.
The testing tube is wrapped with 3 Ta heat shields and is not TaC coated.
Thursday, April 15, 2021, 18:31
IGP1 = 4.5e-7 Torr
Good vacuum = 3e-2 Torr
Bad vacuum = 5e-2Torr
The TGHT will be ramped to 500A at 5A/min
Thursday, April 15, 2021, 20:00
Finished ramping
TGHT = 502 A, 8.22 V, Omega 2012 degC
Sunday, April 18, 2021, 20:38
After 3 days at ~2000 degC, TGHT was ramped at -2A/min to 0A |
Thursday, August 08, 2024, 11:17, Marla Cervantes, C, 44139-5 SK, LP TUBE, Done, Graphite foils conditioning
|
Aaron Schmidt wrote: |
Wednesday, August 07, 2024, 15:36: Roughing. Had initially been roughed & TP started w/ Marla CS, however it timed out. Restarting.
Wednesday, August 07, 2024, 15:37: TP on.
Wednesday, August 07, 2024, 15:46: Tripped at 4 KRPM. Restarted. Up to 5 KRPM.
Failed to start.
Thursday, August 08, 2024, 10:00: TP started.
Thursday, August 08, 2024, 10:12: TP Tripped but nearly spun up. Reset & Restarted. TP Green / on.
|
Thursday, August 08, 2024, 10:43
A cartridge was filled with graphite foils and loaded in an uncoated tantalum tube. The tube was wrapped with four Ta-sheets. A Ta-foil was placed in the tube's right end for measuring the temperature.
Green graphite target characteristics
Number of discs |
822 |
Mass of discs |
11.74 g |
Mass of loaded cartridge with normal cap and hole-cap |
31.1290 g |
Mass of tube loaded, w/shields and tantalum cap |
250 g |
Note: A cartridge loaded with graphite foils has not been conditioned before. Thus, there is no reference on what current to use to reach 2000 °C.
The conditioning of a graphite composite target will be used as a reference, but note that the graphite foils are not expected to outgas as the composites since the foils do not contain binders and plasticizers.
Reference: Elog 636 Graphite inside insert Experiment 2 (regular formulation discs)
Initial ramps used in elog 636:
Currently waiting for vacuum to reduce to IGP1= 8.2e-07
Thursday, August 08, 2024, 11:23
Slope: 0.98 (same as slope used for tantalum targets since temperature is measured on Ta foil)
Friday, August 09, 2024, 08:50
Good vacuum 3e-5 Torr
Bad vacuum 5e-5 Torr
Initial IGP1 = 5.06E-7 Torr
Starting ramp at 1A/min to 200 A
Friday, August 09, 2024, 09:40 Pressure started to rise, but temperature is not within pyrometer range yet. Current 42 A, Voltage 0.5 V
Friday, August 09, 2024, 10:46 Pressure started to reduce (peak 1.4e-5 Torr). Temperature is not within pyrometer range yet Current 100 A, Voltage 1.3 V
Friday, August 09, 2024, 11:28 Temperature started to be detected, but not stable enough. Current 135 A, Voltage 1.9 V
Friday, August 09, 2024, 12:54 Temperature 1129 °C, current 196 A, voltage 3 V.
Friday, August 09, 2024, 12:56
Next ramp 0.5A/min while taking temperature readings periodically until 250A
Friday, August 09, 2024, 14:45
IGP1 = 1.0e-6 Torr
Next ramp 1A/min to 480 A aiming at 2000 °C
Friday, August 09, 2024, 17:13
IGP1 = 1.9e-6 Torr, Current 327A, Voltage 5.3V
Ramp changed to 2A/min to 480 A aiming at 2000 °C
Coolded down after 4 hours at ~2000°C
at -2A/min |
Wednesday, August 14, 2024, 07:23, Marla Cervantes, C, 44139-5 SK, LP TUBE, Problems, EVAP2 Calibration - Vanadium
|
Tuesday, August 13, 2024, 17:20 Pressure kept increasing when turning the turbo pump on
Tuesday, August 13, 2024, 18:00 Pressure stayed constant when turning the turbo pump on |
Wednesday, August 14, 2024, 16:22, Marla Cervantes, C, 44139-5 SK, LP TUBE, Problems resolved, EVAP2 Calibration - Vanadium
|
Marla Cervantes wrote: |
Tuesday, August 13, 2024, 17:20 Pressure kept increasing when turning the turbo pump on
Tuesday, August 13, 2024, 18:00 Pressure stayed constant when turning the turbo pump on
|
Wednesday, August 14, 2024, 10:18
The turbo pump started up normally. System is purging. and tomorrow the target will be heated.
|
Wednesday, August 14, 2024, 16:24, Marla Cervantes, C, 44139-5 SK, LP TUBE, In progress, EVAP2 Calibration - Vanadium
|
Marla Cervantes wrote: |
Marla Cervantes wrote: |
Tuesday, August 13, 2024, 17:20 Pressure kept increasing when turning the turbo pump on
Tuesday, August 13, 2024, 18:00 Pressure stayed constant when turning the turbo pump on
|
Wednesday, August 14, 2024, 10:18
The turbo pump started up normally. System is purging. and tomorrow the target will be heated.
|
Wednesday, August 14, 2024, 16:19
A vanadium wire was introduced in a tantalum pouch and snug among the graphite foils of a conditioned graphite target. The V wire was introduced in the Ta pouch to prevent the direct contact of the wire with the carbon and avoid the reaction between them.
As a first approach, the target will be heated to approximately 1377 °C, aiming at the vaporization temperature of the V wire. If the wire does not vaporize, heating with the turbo pump off would be considered to aim at the vanadium's melting point of 1910 °C.
|
|
Vaporization (at 3e-6 Torr)
|
|
|
|
In case of outgassing, let the pressure reduce
- Next ramping: 0.5 A/ 2min to 250 A.
Very slow rate to allow thermal equilibrium and temperature measurements. Estimated time 3h.
Thursday, August 15, 2024, 08:21
IGP1 = 5.3e-7 Torr
Good vacuum 3e-5 Torr
Bad vacuum 5e-5 Torr
Initial ramping: 2 A/min to 200 A.
Thursday, August 15, 2024, 09:01. Pressure starting to increase at 74 A
Thursday, August 15, 2024, 09:15. Pressure stabilizing 1.8e-6 Torr. Current 103 A, voltage 1.3 V
Thursday, August 15, 2024, 09:21. Pressure increasing (116 A).
Thursday, August 15, 2024, 09:29 Pressure dropping (Current approx. 120 A)
Thursday, August 15, 2024, 10:54
Started ramping to find a pressure peak corresponding to V vaporization.
IGP1 = 6.4e-7
TGHT = 200 A, 2.9 V, omega 1152 °C
Next ramping: 0.5 A/ 2min to 250 A
Thursday, August 15, 2024, 11:17
Ramp seem to slow. The temperature change was too subtle (according to the omega).
IGP1 = 6.5e-7
TGHT = 205 A, 3.03 V, omega 1157 °C
Next ramping: 1 A/ 2min to 250 A
Thursday, August 15, 2024, 11:32
Ramp changed to 0.5 A/min
Thursday, August 15, 2024, 11:54
Ramp was stopped because the pressure was increasing, suggesting the V vaporization.
IGP1 = 6.9e-7
TGHT = 222 A, 3.3 V
Omega 1210 °C, filament 1280 °C
The difference between pyrometers is negligible, suggesting that the V vaporization temperature at 6e-7 Torr of approx. 1300 °C
Thursday, August 15, 2024, 13:15
IGP1 = 7.9e-7
TGHT = 250 A, 3.8 V
Omega 1289 °C
Thursday, August 15, 2024, 13:16
Ramp set to 0.5 A/min to 300 A
Pressure mini-spike at 13:18
Omega reading 1291 °C
Thursday, August 15, 2024, 14:08
IGP1 = 8.5e-7
TGHT = 270 A, 4.18 V
Omega 1375 °C, filament 1400 °C
The system stayed at those conditions for 15min
Thursday, August 15, 2024, 14:11
Ramping to 0A at 2A/min
|
Monday, November 07, 2022, 14:26, Darwin Ortiz Rosales, TaC, 44139-4, TARGET BOAT, Done, TaC coating sintering
|
Monday, November 07, 2022, 14:24
The coated container tube was wrapped in four Ta foil heatshields.
Target temperature on OMEGA= 1850-1900 C
OMEGA slope:= 0.990
Target time at max temperature = 4 hours
Final TGHT current= ~400A (adjustable)
Heating autoramp starged at 4A/min to 40A
Then at 1A/min on both heaters to 120A.
Good vacuum = 5.0 e-02 Torr
Bad vacuum = 5.0E-04 Torr
IGP1 initial = |
Wednesday, May 24, 2023, 15:23, Darwin Ortiz Rosales, , 44139-4, LP TUBE, Done, Graphite inside insert Experiment 1
|
Wednesday, May 24, 2023, 15:22
A Ta container tube was wrapped with 4 Ta heatshields. Note final container is 45220-11
219 graphite discs were loaded.
a TaC coated Ta spring at the front end.
The system was left to establish vacuum over previous night.
Good vacuum set to5e-04Torr
Bad vacuum was set to 5e-2 Torr
Total weight of system including spring= 250.1 g
OMEGA slope = 0.99
The target will be heated to 2000 C, held there for 10 hours.
Initial ramp at 1A/min to 200A
Then ramp at 0.5A/min while taking temperature readings periodically unti l250A.
At 250 A will let pressure stabilize and then ramp at 1A/min to 2000C or 450A.
Will hold at target Temperature or Current for 10 hours before starting ramp-down.
Wednesday, May 24, 2023, 15:50
Currently heating at 0.5A/min to250A. Taking temperature/current measurements
IGP1= 1.06e-06 Torr
Wednesday, May 24, 2023, 18:28
heating at 1A/min to 275A to collect more temperature data
Wednesday, May 24, 2023, 19:22
Slight offset between set and RD current observed.
Ramping at 1A/min to 440A according to the regression below

Should be around 2000 C.
Wednesday, May 24, 2023, 20:22
Currently at 339 A, 4.8V
OMEGA = 1614 C, IGP1= 2.04e-06 Torr
Will ramp up at 2A/min to 450A as new data point suggests

Wednesday, May 24, 2023, 21:05
heating curve has new slope suggesting 500A as minimum to reach 2000 C
Increasing ramp to 1A/10s to reach 450A
Wednesday, May 24, 2023, 21:17
TGHT
IGP1= 3.9e-06 Torr
Continue ramping to 480A

Wednesday, May 24, 2023, 22:11
Offset between setpoint of current and readback. readback 10A below.
Will keep at this setting until 7:30 am tomorrow then start ramp down @-2A/min
Thursday, May 25, 2023, 07:25
OMEGA=1912C, IGP1 =1.29e-06 Torr, TGHT = 480A, 9.0V
begin ramp down at -2A/min
Thursday, May 25, 2023, 09:52
Some odd current readback behaeviour noticed. Have contacted Gelo from controls. He will look at it next week. Discrepancy between read back and set point and drop in read back currrent. See picture
|
Tuesday, June 06, 2023, 09:14, Darwin Ortiz Rosales, C, 44139-4, TARGET BOAT, Done, Graphite inside insert Experiment 2 (regular formulation discs)
|
Tuesday, June 06, 2023, 09:11
A Ta container tube was wrapped with 4 Ta heatshields. Note final container is 45220-6
272 graphite discs were loaded.
a TaC coated Ta spring at the front end.
The system was left to establish vacuum over previous night.
Good vacuum set to5e-04Torr
Bad vacuum was set to 5e-2 Torr
Total weight of system including spring= 253.94 g
OMEGA slope = 0.99
The target will be heated to ~2000 C, held there for 10 hours.
Initial ramp at 1A/min to 200A
Then ramp at 0.5A/min while taking temperature readings periodically unti l250A.
At 250 A will let pressure stabilize and then ramp at 1A/min to 2000C or 480A. Will use read back current
Will hold at target Temperature or Current for 10 hours before starting ramp-down.
Tuesday, June 06, 2023, 09:14
Starting ramt at 1A/min
initial IGP1= 8.2e-07
Tuesday, June 06, 2023, 21:25
@480 A on readback, 1823C on OMEGA. ramping to 510A set point which should be around 490 RD. (see heating profile for details)
Tuesday, June 06, 2023, 22:02
ramped to 516 on RD 527 on set. Will leave for 10 hours
OMEGA =1930 C
Wednesday, June 07, 2023, 06:32
OMEGA at 1950 C this morning. Will continue heating. Lowered to 1940 C as in experiment 1 this was the top temperature.
Wednesday, June 07, 2023, 07:40
OMEGA= 1940 C
IGP1=1.7-6 Torr
TGHT= 513A, 9.4V
starting ramp down at -2A/min |
Thursday, September 29, 2022, 10:02, Darwin Ortiz Rosales, , 44139-3, TARGET BOAT, Done, 220926-Graphite conditioning in target tube
|
Thursday, September 29, 2022, 09:57
A Ta container tube was wrapped with 3 Ta heatshields.
338 graphite discs were loaded.
one Tantalum cup (modified to fit losely) was inserted on the front end along with a Ta spring.
on the backside there is no spring but four discs glued together with PVA
The system was left to establish vacuum over night.
Good vacuum set to5e-04Torr
Bad vacuum was set to 5e-2 Torr
Total weight of system including springs = 249.07 g
OMEGA slope = 0.99
The target will be heated to 2100 C, held there for 10 hours. The target Temperature vs Power will be tabulated and the current required to reach 2100 will be extrapolated to avoid using OMEGA at higher temperatures.
a) The target will be removed, weighed and inspected
b) If the target boat is still good, run again at 10A higher than previous for 2 hours.
c) The target will be removed, weighed and inspected
d) i) If the weight is the same or negligible, experiment ends
ii) if the weight has decreased and target still intact, repeat from step b and document all measurements and settings
Thursday, September 29, 2022, 10:04
IGP1= 1.4e-04 Torr
TGHT= 80.0 A, 1.0V
Will allow pressure to drop and then continue heating
Thursday, September 29, 2022, 10:20
IGP1= 7.9e-05 Torr pressure on downward trend
Start heating at 2A/min to 200A
The target started dropping in temperature as current increased. Suspected OMEGA issue.
Started cooling at -2A/min
Will continue next week.
Monday, October 03, 2022, 11:05
Upon inspection, the window though which the OMEGA laser travels was coated with dark precipitate (mostly a spot in the direct path of the laser).
Cleaned the window and started pumpdown.
Monday, October 03, 2022, 12:57
start heating @2A/20s = 6A/min because the target had previously been heated past additive evaporation point.
IGP1= 3.8e-06 Torr
Monday, October 03, 2022, 18:41
Will heat to 500A and leave for 10 hours. The regression shows too high current to reach 2100. Not reasonable. So will work with 500A as a baseline.


Tuesday, October 04, 2022, 06:52
Temperature @500 A read 1742C
maintained for 10 hours
start rampdown at -2A/min
OMEGA currently 1099C
Current = 500 A
Voltage =9.9 V
IGP1= 5.9e-7 Torr
Tuesday, October 04, 2022, 21:32
Quartz window was completely covered with graphite like dust. final weight after heating = 244.57 g (a couple of discs came loose and they were weighed separately and not included in the next heating).
weighted target and added one extra heatshield because it looked like a lot of heat was escaping. Will treat at 500A again for 2 hours. The extra heat-shield should provide hotter environment.
new initial weight = 254.24 g (don't have a balance with greater precision .
Wednesday, October 05, 2022, 07:42
IGP1= 3.8e-07 Torr
ramping to 280A @ 3A/min
Wednesday, October 05, 2022, 11:40
ramping to 350 @ 3A/min
Then ramp to 500A
500A at 12:50
Wednesday, October 05, 2022, 15:52
ramping down at -2A/min
Thursday, October 06, 2022, 09:27
IGP1= 1.8e-07 Torr
Will dismount and weigh, then decide how to proceed
 
according to second regression, second heating was ~2000 C. OMEGA not reliable after 1700 C in this case.
Thursday, October 06, 2022, 12:34
The final weight after the second heating was = 254.19 g
reinstalled target and cleaned quartz window.
will heat up to 510 A
Friday, October 07, 2022, 07:46
IGP1= 3.0 e-07 Torr
ramp at 2A/min to 500A. will pause to take data points for regression.
Friday, October 07, 2022, 13:05
Start rampdown after two hours at 500A, 10.3V
-2A/min
|
Tuesday, October 25, 2022, 12:25, Darwin Ortiz Rosales, TaC, 44139-15-SK, LP-SIS, Done, TaC coating sintering
|
Tuesday, October 25, 2022, 12:18
Container wrapped in 4 Ta foil heatshields
Target temperature on OMEGA= 1850-1900 C
OMEGA slope:= 0.990
Target time at max temperature = 4 hours
Final Current TBHT= 230A
Final TGHT current= ~420A (adjustable)
Heating autoramp started at 2A/min on both TGHT and TBHT to40A
Then at 1A/min on both heaters to 120A.
Good vacuum = 5.0 e-04 Torr
Bad vacuum = 5.0E-02 Torr
Wednesday, October 26, 2022, 07:07
IGP1= 7.5e-7 Torr
start ramp at 2A/min to 40A
Ramped at 1A/min to 120A then held until pressure drop. Then ramped @ 4A/min to 400A on TGHT.
Wednesday, October 26, 2022, 14:09
Manually rampted TGHT to 415A, 6.9V will hold for 4 hours
OMEGA reads 1870 C initially
Thursday, October 27, 2022, 09:44
was held for 5 hours due to technical issues but should be ok.
OMEGA @ time of rampdown = 1830C
Rampdown @-2A/min TGHT and -1A/min TBHT
IGP1= 3.5e-07 Torr
|
Monday, June 01, 2020, 12:03, Aaron Schmidt, Ta, 44139-13, LP-SIS, In progress, Ta#60 Conditioning
|
Ta#60 LP-SIS target description:
Total Ta foils = 470 [6x20 packs + 350 single discs]
Foil Thickness = 0.025mm
Target density = 14.081 g/cm3
Target length = 3.33 cm
Total Mass = 46.891 g [Incl foils + Ta wire on 6 packs]
Total mass w/ Target oven= 445g w/ end caps)
Discs in target are arranged as follows: 1pack / 75singles / 1pack / 100singles / 2packs / 100singles / 1pack / 75singles / 1pack
End caps installed (Expanded). No Ta heat shield added.
https://elog.triumf.ca/TIS/Target+Production/98
Monday, June 01, 2020, 11:38: Roughing.
Monday, June 01, 2020, 12:03: Turbo pump on.
TBHT will be ramped up to 230A at 1.0A/min.
TGHT will be ramped up to 600A + at 2.0A/min.
Final desired temperature = 1900C.
OMEGA slope = 0.98.
Tuesday, June 02, 2020, 07:13: Omega slope set to 0.98. Power supplies / sources on. vacuum@ 5.13e-07T.
Tuesday, June 02, 2020, 07:16: Manually tap up TGHT / TBHT to 40 / 5 A. Vacuum @ 5.08e-07T.
Tuesday, June 02, 2020, 07:19: Auto-ramping TGHT / TBHT @ 2 A per min to 350 / 150 A.
Tuesday, June 02, 2020, 10:02: Auto-ramping TGHT / TBHT @ 2 / 1 A per min to 450 / 200 A. Vacuum @ 1.39e-06T. TGHT Voltage= 5.955V. Omega: 1288 deg C.
Tuesday, June 02, 2020, 11:54: Auto-ramping TGHT / TBHT @ 2 / 1 A per min to 500 / 230 A. Vacuum @ 1.85e-06T. TGHT Voltage= 7.998V. Omega: 1528 deg C.
Tuesday, June 02, 2020, 13:16: Auto-ramping TGHT @ 2 A per min to 550 A. Vacuum @ 2.51e-06T. TGHT Voltage= 9.060V. Omega: 1625 deg C.
Tuesday, June 02, 2020, 13:58: Auto-ramping TGHT @ 2 A per min to 600 A. Vacuum @ 3.53e-06T. TGHT Voltage= 9.060V. Omega: 1728 deg C.
Tuesday, June 02, 2020, 14:23: Auto-ramping TGHT @ 2 A per min to 625 A. Vacuum @ 5.56e-06T. TGHT Voltage= 11.236V. Omega: 1821 deg C.
Tuesday, June 02, 2020, 14:36: TGHT / TBHT 625 / 230 A. Vacuum @ 6.65e-06T. TGHT Voltage= 11.724V. Omega: 1865 deg C.
Tap up TGHT manually.
Tuesday, June 02, 2020, 14:48: TGHT / TBHT 643 / 230 A. Vacuum @ 7.24e-06T. TGHT Voltage= 12.129V. Omega: 1901-1903 deg C.
Desired temperature = 1900C reached.
Tuesday, June 02, 2020, 22:20: TGHT / TBHT 643 / 230 A. Vacuum @ 2.05e-06T. TGHT Voltage= 12.212V. Omega: 1901-1903 deg C.
Tuesday, June 02, 2020, 22:22: Auto-Cooling @ 1 A per min.
Wednesday, June 03, 2020, 06:08: TBHT @ 0. TGHT set for Auto-Cooling @ 2 A per min.
Wednesday, June 03, 2020, 11:38: PS off. Turbo pump off.
Wednesday, June 03, 2020, 12:40: Venting. |
Thursday, June 11, 2020, 13:01, Darwin Ortiz Rosales, Empty, 44139-12, LP-SIS, Done,
|
Thursday, June 11, 2020, 09:56
Previous day (Wednesday June 10, 2020)
Container coated with TaC and wrapped with 3 Ta heat shields.
Desired temperature= 1900 C, Omega Slope set = 0.990, Auto TGHT at 0.2A/min to reach 400A, TGHT will be tapped up accordingly to reach desired Temp.
TBHT will be set fixed at 230 A (max).
Good vac at 3.00e -5 Torr
Bad vac at 5.00e-5 Torr
Chamber pump down
Thursday, June 11, 2020, 10:19
IEVAP2:IGP1=1.06e-6 Torr
ramping to 40A (TGHT and TBHT) at 1A/min
Thursday, June 11, 2020, 12:35
IEVAP2:IGP1=1.8e-6 Torr
TGHT = 39.8 A, 0.45V
TBHT=38.5 A, 0.48V
Manually rampted to 45A on both TGHT and TBHT
Thursday, June 11, 2020, 12:58
IEVAP2:IGP1=1.6e-6 Torr
TGHT = 34.8 A, 0.52V
TBHT=44.2A, 0.55V
Start Autoramp at .5A/min to 400A on TGHT and 230A on TBHT
Thursday, June 11, 2020, 17:14
Irregular pressure profile. Cooling . Need to check for leak.
TGHT = 99 A 1.3 V
TBHT = 99 A 1.4 V
Friday, June 12, 2020, 12:59
Restarting ramping
IGP1= 4.98e7 Torr
Autoramp at 1A/min to 400A on TGHT and 230A on TBHT
(pressure and TGHT current and voltage profile seem normal compared to previous coating sintering with the same power supply)
Friday, June 12, 2020, 14:40
Paused ramping
TGHT = 90A
After a few minutes the profile (noise) was still there. Continue autoramp at 0.5A/min to 400 A on TGHT and 230A on TBHT
Friday, June 12, 2020, 15:21
IGP1= 1.97e-06 Torr trending down
TGHT = 111.5 A , 1.5 V
TBHT = 112.9 A, 1.9 V
Increase ramping speed to 1A/min to 400A on TGHT and 230A on TBHT
Friday, June 12, 2020, 20:50
OMEGA = 1754 C
IGP1= 2.5e-6 Torr
TGHT = 394.1 A, 6.6 V
TBHT = 232.8 A, 4.0 V
Tapping to 1900 C
Friday, June 12, 2020, 21:00
OMEGA =1901 C
IGP1= 5.6e-6 Torr
TGHT = 448.3 A, 7.5 V
TBHT = 232.8 A, 4.1 V
Saturday, June 13, 2020, 00:51
OMEGA = 1898 C
IGP1 = 2.0e-6 Torr
TGHT = 447.2 A, 7.5 V
TBHT = 232.9 A, 4.1 V
Start cooling at -2A/ min for TGHT and -1A/min for TBHT
|
Wednesday, March 18, 2020, 07:21, Marla Cervantes, TaC, 44139-11, LP-SIS, Done, TaC coating/sintering
|
Wednesday, March 18, 2020, 07:10
Ta tube was coated with TaC and wrapped with Ta heat-shields (3 layers)
Desired temperature= 1900 C (expected TGHT ~430 A), TBHT will be set fixed at 230A (max).
Evap 2 was pumped down on the previous night.
Good vacuum= 3.00 e-5 Torr
Bad vacuum = 5.00 e-5 Torr
Ramped TGHT and TBHT to 40A at 0.5A/min
Initial pressure IGP1 = 4.8e-7Torr
Wednesday, March 18, 2020, 09:29
After an hour pressure reduced to 5.45e-6 Torr
TGHT; 0.518 V, 40.5 A
TBHT: 0.41 V, 38.6 A
Autoramp TGHT and TBHT at 1A/min to 400A and 230A respectively.
Wednesday, March 18, 2020, 18:29
TGHT = 400A, 6.6V, TBHT= 232.9, 3.9V
OMEGA = 1240 C, this is 500 degC lower than previous LP-SIS at same conditions
https://elog.triumf.ca/TIS/Evaporator_2/464
Start autoramp to 460A on TGHT at 1A/min
Wednesday, March 18, 2020, 20:51
TGHT: 464 A, 7.75 V
Temperature 1328, I won't increase the temperature because there is a chance that the reading is 500 degC off and the target is sitting at 1828 degC instead of 1328 degC
Wednesday, March 18, 2020, 23:17
After ~4 hours at 1317 degC according to the pyrometer:
TGHT = 7.7 V, 457.8 A,
TBHT = 3.9 V, 232.9 A,
IGP1 = 1.16e-6
Commence cooling at -2A/min for TGHT and -1A/min for TBHT
Thursday, March 19, 2020, 15:53
Venting and dismounting.
The coating does not have the quality to be used online, another LP-SIS will be coated and sinter |
Sunday, May 24, 2020, 13:39, Marla Cervantes, Empty, 44139-11, LP-SIS, Done, TaC coating/sintering
|
Sunday, May 24, 2020, 06:54
Ta tube was coated with TaC and wrapped with Ta heat-shields (3 layers)
Desired temperature= 1900 C (expected TGHT ~430 A), TBHT will be set fixed at 230A (max).
Evap 2 was pumped down
Good vacuum= 3.00 e-5 Torr
Bad vacuum = 5.00 e-5 Torr
Ramped TGHT and TBHT to 40A at 0.5A/min
Initial IGP1 = 2.5e-7 Torr
Sunday, May 24, 2020, 08:24
Autoramp deliver 40 A
TGHT = 0.58 V, 39.6 A
TBHT = 0.46 V, 39.81 A
IGP1 = 2.9 e-7 Torr and increasing
Heater conditions will be hold for 15 min to account for pressure changes.
Sunday, May 24, 2020, 08:39
IGP1 = 2.7e-7 Torr and decreasing
Autoramp TGHT and TBHT at 1A/min to 400A and 230A respectively.
Sunday, May 24, 2020, 14:57
After 15 min the autoramp stopped
TGHT = 6.8 V, 394.65 A
TBHT =4 V, 232.9 A
IGP1 = 2.2e-6 Torr and going down
Omega = 1747 degC
Autoramp set to TGHT 1A/min to 450A
Sunday, May 24, 2020, 16:07
After 15 min the autoramp stopped
TGHT = 7.7 V, 448 A
IGP1 = 2.88e-6 Torr
Omega = 1886 degC
The current will be increased manually to reach 1900 deg C
Final TGHT = 7.9 V, 453.15 A (455 A input)
Omega = 1899 degC
The TGHT and TBHT will leave at current conditions until pressure reduce (approx 4 hours)
Sunday, May 24, 2020, 20:01
TGHT = 7.9 V, 456 A
TBHT = 4 V, 232.9 A
IGP1 = 1.8e-6 Torr
Omega = 1893 degC
Initiating auto-cool at -2.0A/min and -1.0A/min for the TGHT and TBHT respectively. |
Thursday, July 16, 2020, 11:15, Darwin Ortiz Rosales, SiC, 44139-11, LP-SIS, Done, SiC sintering for Luca 1 of 2
|
Thursday, July 16, 2020, 11:15
Coated Ta tube cotaining 233 SiC disks wrapped with Ta heat-shields (3 layers)
Desired temperature= 1800C (expected TGHT 410 A), TBHT will be set fixed at 230A (max).
Evap 2 was pumped down
Friday, July 17, 2020, 08:49
Total length packed approximately 10 cm
container has 3 Ta heat shields.
No endcaps inserted to facilitate out-gassing
Two TaC coated Ta wire springs inserted at both ends.
Initially to ramp TGHT and TBHT to 40 A at 0.5 A/min
Then heat ramping TGHT manually and automatically to reach 400 A (Omega slope set = 0.990)
Then ramp to temperature = 1800 C
TBHT will be set fixed at 230 A (max). TBHT heated manually and automatically to max.
Good vac at 3.00 e -5 Torr
Bad vac at 5.00 e-5 Torr
Initial IGP1 = 6.45e-07 Torr
Friday, July 17, 2020, 20:49
TBHT = 38.9 A, 0.47 V
TGHT = 39.7 A, 0.59 V
IGP1 = 9.1e-06 Torr
Autoramp to 50 A at 0.5 A/min for both TGHT and TBHT
Saturday, July 18, 2020, 09:04
IGP1 = 1.6e-06 Torr
TGHT = 50.5 A, 0.76V
TBHT = 49.7 A, 0.62 V
Starting autoramp at 0.5 A/ min to 400 A TGHT and 230 A TBHT
Saturday, July 18, 2020, 10:17
IGP1 = 5.06e-05 torr
stopped autoramp and allow pressure to decrease and stabilize
Saturday, July 18, 2020, 10:47
IGP1 = 6.65 e-06 Torr and trending down
TGHT = 55.4 A, 0.83 V
TBHT= 54.6 A, 0.68 V
Change autoramp to 0.25 A/min for both heaters (.05 increments and 120s wait)
Sunday, July 19, 2020, 08:46
IGP1= 2.2 e-05 Torr
TBHT = 109.5 A, 1.6 V
TGHT = 106.6 A, 1.7 V
increased ramping rate to .5A/min by decreasing wait intervals to 60 s
Sunday, July 19, 2020, 14:55
IGP1 = 7.1 e -06 Torr
TGHT = 271.8 A, 4.7 V
TBHT = 233.1 A, 4.1 V
Increasing ramping rate to 1 A/min
Sunday, July 19, 2020, 17:35
IGP1 = 2.6e-06 Torr
TGHT = 400 A, 7.2 V
TBHT = 233 A, 4.1 V
Tap manually to 410 (expected 1800 C )
Note* OMEGA reading cannot be obtained.
Leave at 410 A on TGHT for 4 hours.
Sunday, July 19, 2020, 22:57
IGP1 = 7.0 e-07 Torr
TGHT= 410 A , 7.2 V
TBHT = 233 A, 4.2 V
Start cool down at -2A/min for TGHT and -1A/min for TBHT
Monday, July 20, 2020, 12:20
IGP1 = 2.2e-07 Torr
Unloading target |
Monday, July 20, 2020, 19:25, Darwin Ortiz Rosales, SiC, 44139-11, LP-SIS, Done, SiC sintering for Luca 2 of 2
|
Monday, July 20, 2020, 19:27
Coated Ta tube cotaining 355 SiC disks wrapped with Ta heat-shields (3 layers)
Desired temperature= 1800C (expected TGHT 410 A), TBHT will be set fixed at 230A (max).
good vacuum = 3.00 e-05 Torr
bad vacuum = 5.00 e-05 Torr
Evap 2 was left to pump down over night.
Monday, July 20, 2020, 23:06
IPG1 = 3.1e-06 Torr
Start autoramp at .25A/min to 40A for both TGHT and TBHT
Tuesday, July 21, 2020, 08:06
TGHT = 40.3 A, 0.51 V
TBHT = 39.0 A, 0.46 V
increase auto ramp limit to 50 A for both TGHT and TBHT
IGP1=1.8e-05 Torr
Tuesday, July 21, 2020, 16:22
IGP1= 1.5 e-05 Torr
TGHT = 50.1 A, 0.65 V
TBHT = 50.0 A, 0.60 V
Change ramp target to 350 A for TGHT and 230A for TBHT
Wednesday, July 22, 2020, 13:24
Stopped autoramp. Will allow pressure to drop.
TGHT = 64.0 A, 0.86 V
TBHT = 64.5 A, 0.82 V
Thursday, July 23, 2020, 23:55
TGHT Reached 430 A, 7.7 V
OMEGA reads 1310 C but reading is not considered accurate so will leave at this current for 4 hours.
Friday, July 24, 2020, 11:31
IGP1 = 1.98e-07 Torr
Window for pyrometer was coated with condensate.
Dismounted target and cleaned two windows in line with the pyrometer.
|
|