Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  Evaporator_2, Page 7 of 34  Not logged in ELOG logo
ID Date Author Target Material Target Oven W.O# Source Status Subjectdown Text Attachments
  485   Friday, May 29, 2020, 10:26 Marla CervantesEmpty43044-8LP-SISDoneTaC coating/sintering  Friday, May 29, 2020, 08:52
Ta tube was coated with TaC
 e-log-485.PNG 
  499   Tuesday, August 18, 2020, 09:26 Marla CervantesTaC44489-15TARGET BOATDoneTaC coating/sintering  Tuesday, August 18, 2020, 09:06
A short tantalum tube was coated
with TaC and wrapped with 3 layers of Ta,
  
  500   Tuesday, August 18, 2020, 10:41 Marla CervantesTaC44489-11 DoneTaC coating/sintering Thursday, August 19, 2020, 17:28
 A short tantalum tube
  
  429   Thursday, February 07, 2019, 15:20 Darwin Ortiz RosalesEmpty 43630-1 DoneTaC coating/sinteringThursday, February 07, 2019, 14:12
Tantalum tube coated with TaC and
wrapped with 3 layers of Ta heat-shielding.
  
  441   Tuesday, April 30, 2019, 09:35 Darwin Ortiz RosalesEmpty43044-6LP-SISDoneTaC coating/sinteringTuesday, April 30, 2019, 09:33
Container was coated with TaC and
wrapped with 2 Ta heat shields.
 43044_6a.png43044_6b.png 
  455   Friday, September 06, 2019, 11:58 Darwin Ortiz Rosales 44062-4LP-SISDoneTaC coating/sinteringFriday, September 06, 2019, 11:20
Container was coated with Tac and
wrapped with 2 Ta heat shields.
 190906LPSIS_Sintering.PNG 
  461   Thursday, October 03, 2019, 09:26 Darwin Ortiz RosalesTaC44062-6LP-SISDoneTaC coating/sinteringThursday, October 03, 2019, 08:58
Ta tube was coated with TaC and wrapped
with Ta heat-shields (3 layers)
  
  464   Thursday, October 17, 2019, 13:53 Darwin Ortiz RosalesTaC44062-3LP-SISIn progressTaC coating/sinteringThursday, October 17, 2019, 12:00
Ta tube was coated with TaC and wrapped
with Ta heat-shields (3 layers)
  
  468   Friday, November 22, 2019, 18:32 Fernando Maldonado & Marla Cervantes TaC HP-FEBIADIn progressTaC coating/sintering Friday, November 22, 2019, 18:18:
 
 
  
  469   Saturday, November 23, 2019, 14:03 Darwin Ortiz RosalesTaC42464-3HP-FEBIADDoneTaC coating/sintering12.3
Saturday, November 23, 2019, 14:00
Container coated with TaC and wrapped
 HPFIBIAD20191124.PNG 
  476   Tuesday, March 10, 2020, 09:34 Darwin Ortiz RosalesEmpty42218-8HP-SISDoneTaC coating/sinteringMonday, March 9, 2020, 03:15
Container coated with TaC and wrapped
with 3 Ta heat shields.
 SiC#40.PNG 
  479   Wednesday, March 18, 2020, 07:21 Marla CervantesTaC44139-11LP-SISDoneTaC coating/sintering Wednesday, March 18, 2020, 07:10
Ta tube was coated with TaC
 IMG_1538.JPG 
  488   Monday, June 15, 2020, 14:28 Darwin Ortiz RosalesEmpty42218-7HP-SISDoneTaC coating/sintering Monday, June 15, 2020, 13:30
Container coated with TaC and
  
  503   Sunday, August 30, 2020, 18:28 Marla CervantesEmpty44489-13 DoneTaC coating/sintering Sunday, August 30, 2020, 06:47
A short tantalum tube was coated
  
  507   Thursday, September 17, 2020, 16:11 Marla CervantesEmpty44139-9LP-SISDoneTaC coating/sintering Thursday, September 17, 2020, 16:10
An LP-SIS was wrapped with 3 Ta layers,
and installed in the EVAP2
  
  533   Tuesday, March 02, 2021, 11:32 Darwin Ortiz RosalesTaC44691-5LP-SISDoneTaC coating/sinteringTuesday, March 02, 2021, 11:26 
Ta tube was coated with TaC
  
  534   Friday, March 05, 2021, 10:48 Darwin Ortiz RosalesTaC44691-1LP-SISDoneTaC coating/sintering Friday, March 05, 2021, 10:47
Ta tube was coated with TaC
 2021-03-07_090107-44691-1_Tac_Sintering.png 
  535   Tuesday, March 09, 2021, 11:54 Darwin Ortiz RosalesTaC42464-1HP-FEBIADDoneTaC coating/sinteringTuesday, March 09, 2021, 11:54 
 Container coated with
  
  554   Thursday, September 02, 2021, 07:14 Darwin Ortiz RosalesTaC44691-7LP-SISDoneTaC coating/sintering Thursday, September 02, 2021, 06:36
Ta tube was coated with TaC
 coating44691-7.PNG 
  556   Tuesday, September 14, 2021, 09:33 Darwin Ortiz Rosales 42218-5LP-IG-LISDoneTaC coating/sinteringTuesday, September 14, 2021, 09:32
Ta IGLIS tube was coated with
  
ELOG V2.9.2-2455