621
|
Sunday, April 16, 2023, 14:08 |
Darwin Ortiz Rosales | TaC | 45220-14 | LP-SIS | Done | TaC coating sintering | Sunday, April 16, 2023, 14:08
The coated container was wrapped in four Ta foil heatshields.
Target temperature on OMEGA= 1860-1900 C
OMEGA slope:= 0.990
Target time at max temperature = 4 hours
Final Current TBHT= 230A
Final TGHT current= ~400A (adjustable)
Good vacuum = 5.0 e-04 Torr
Bad vacuum = 5.0E-02 Torr
Ramped at 2A/min to 230 A on both TGHT and TBHT.
Then ramped @4A/min to 385 A on TGHT. Then ramped manually to 1850 C
Sunday, April 16, 2023, 18:31
At 428A reached 1830C on OMEGA
Sunday, April 16, 2023, 22:24
Start ramp down @ -2A/min TGHT and -1A/min TBHT |
|
622
|
Tuesday, April 18, 2023, 06:48 |
Darwin Ortiz Rosales | TaC | 45220-11 | LP-SIS | Done | TaC coating sintering | Tuesday, April 18, 2023, 06:46
The coated container was wrapped in four Ta foil heatshields.
Target temperature on OMEGA= 1830-1900 C
OMEGA slope:= 0.990
Target time at max temperature = 4 hours
Final Current TBHT= 230A
Final TGHT current= ~400A (adjustable)
Good vacuum = 5.0 e-04 Torr
Bad vacuum = 5.0E-02Torr
Tuesday, April 18, 2023, 06:47
IGP1 initial = 3.80e-07 Torr
Start ramp up at 2A min to 230 on both TBHT and TGHT
Tuesday, April 18, 2023, 09:43
Autoramping TGHT to 380 A @4/min (2/A 30s)
Tuesday, April 18, 2023, 10:36
manually ramped to 416A, 6.8 V on TGHT
TBHT = 230 A, 4.0V
Holding here for 4 hours.
OMEGA = 1863 c
Tuesday, April 18, 2023, 11:26
increased current on TGHT to 418 because temperature had slipped below 1850 C
Tuesday, April 18, 2023, 14:52
ramping down @-2A/min TGHT and -1A/min TBHT |
|
623
|
Thursday, April 20, 2023, 07:00 |
Darwin Ortiz Rosales | TaC | 41790-7 | LP-FEBIAD | Done | TaC coating sintering | Thursday, April 20, 2023, 06:59
The coated container was wrapped in 3 Ta foil heatshields.
Target temperature on OMEGA= 1830-1900 C
OMEGA slope:= 0.990
Target time at max temperature = 4 hours
Final Current TBHT= 230A
Final TGHT current= ~400A (adjustable)
Good vacuum = 5.0 e-04 Torr
Bad vacuum = 5.0E-02 Torr
Thursday, April 20, 2023, 07:02
Started TBHT and TBHT ramp at 1A/min to 230A
Thursday, April 20, 2023, 09:55
From 170 A started ramping at 2A/min to 230 A on both TGHT and TBHT
Thursday, April 20, 2023, 10:27
Starting ramp on TGHT to 300A, TBHT kept at 230A, 3.0 V
Thursday, April 20, 2023, 11:19
ramping at 4A/min (2A/30s) to 340 A on TGHT
Thursday, April 20, 2023, 11:40
After plot, ramping @ 2A/min to 460A on TGHT expected to reeach at 1245. 4 hours at 4:45 pm
Thursday, April 20, 2023, 13:44
Note that top temperature was 1835C @ 480 A, 7.9V
Thursday, April 20, 2023, 17:00
Start rampdown at -2A/min TGHT and -1A/min TBHT
Monday, April 24, 2023, 13:35
The coating is not as good as expected. Maybe too much time between coating and sintering. Will not use for TiC target. |
|
624
|
Monday, April 24, 2023, 09:12 |
Darwin Ortiz Rosales | TaC | 44692-5 | LP-FEBIAD | Done | TaC coating sintering | Sunday, April 23, 2023, 07:23
The coated container was wrapped in 3 Ta foil heatshields.
Target temperature on OMEGA= 1850-1900 C
OMEGA slope:= 0.990
Target time at max temperature = 4 hours
Final Current TBHT= 230A
Final TGHT current= ~450A (adjustable)
Good vacuum = 5.0 e-04Torr
Bad vacuum = 5.0E-02 Torr
Interlock tripped (HS water flow, SP6, GE, CHIL <--supposed to be bypassed)
Monday, April 24, 2023, 13:24
In the morning Carla found some loose wires behind EVAP 2. Wires connecting the flow-meter. The interlock problem was fixed as it was noted there was normal HS water flow.
Started ramp up at 1A/min to 230 A. The first outgassing bump observed and wil start autoramp @ 2A/min on both TGHT and TBHT (target is 400A on TGHT and 230A on TBHT).
Monday, April 24, 2023, 16:24
Reached 480A on TGHT at 4 pm. Manually tapped to 500 A on TGHT , OMEGA=1853C. Will keep until 8 pm.
Monday, April 24, 2023, 19:56
OMEGA= 1853 C
IGP1= 1.5e-06 Torr
TGHT = 500A, 8.5V
TBHT= 230A, 3.1V
rampdown TGHT @-2A/min and TBHT @ -1A/min
|
|
632
|
Friday, April 28, 2023, 11:31 |
Darwin Ortiz Rosales | TaC | Boat | TARGET BOAT | Done | TaC coated endcaps and spring sintering | Friday, April 28, 2023, 11:29
loaded 14 TaC coated end caps and 2 TaC coated springs.
OMEGA Slope 0.99
Will heat to 1850-1900 C and hold for 4 hours
Good Vac = 5.0e-4 Torr
Bad Vac= 5.0 e-02 Torr
2 end caps had slight damage and were disposed of. 12 good caps and 2 good springs. |
|
637
|
Thursday, June 08, 2023, 09:29 |
Darwin Ortiz Rosales | TaC | | TARGET BOAT | Done | TaC coated endcaps and spring sintering (new TaC) | Thursday, June 08, 2023, 09:28
Using smaller particle size TaC no ball mill procedure.
Loaded 2 TaC coated end caps and 1 TaC coated springs.
OMEGA Slope 0.99
Will heat to 1850-1900 C and hold for 4 hours
Good Vac = 5.0e-4 Torr
Bad Vac= 5.0 e-02 Torr
Initial IGP1= 4.07E-06 Torr
Thursday, June 08, 2023, 10:36
ramped @ 2A/min to 100A. Then after pressure stabilized starting ramp at 4A/min (2A/30s) to 400A
Thursday, June 08, 2023, 12:24
reached 1850 C with Set current = 480 and RD current = 470.6A, V = 7.7
Will leave for 4 hours.
Thursday, June 08, 2023, 15:31
ramping down at -2A/min (-1A/30s) |
|
639
|
Tuesday, August 15, 2023, 12:03 |
Darwin Ortiz Rosales | TaC | 44692-11 | TARGET BOAT | Done | TaC coating sintering | Tuesday, August 15, 2023, 10:48
The coated container was wrapped in 4 Ta foil heatshields.
Target temperature on OMEGA= 1850-1900 C
OMEGA slope:= 0.990
Target time at max temperature = 4 hours
Final Current TBHT= N/A
Final TGHT current= ~400A (adjustable)
Heating autoramp starged at 2A/min(1A/30s) on TGHT 100A
Then at 4A/min to 100 A.
Good vacuum = 5.0 e-04 Torr
Bad vacuum = 5.0E-02 Torr
IGP1 initial =8.9e-06 Torr
Tuesday, August 15, 2023, 13:00
Tuesday, August 15, 2023, 13:00
Pressure stabilizing @8.8e-06 Torr
starting 2A/30s ramp to 400 A
Tuesday, August 15, 2023, 14:02
TGHT RD CURRENT = 331.4A, 5.8V, SET CURRENT=338 A.
OMEGA = 1855
IGP1= 1.5e-05 Torr
Leave for 4 hours
Tuesday, August 15, 2023, 15:05
Temperature dropped slightly to 1820C so increased current set point to 345A, and RD was at 338A, 5.9V
OMEGA increased to 1842C
Tuesday, August 15, 2023, 17:59
OMEGA = 1823C
TGHT= RD 338A, 5.9V SET= 345A
IGP1= 4.0e-06 Torr
Start rampdown at -2A/min |
|
640
|
Tuesday, August 22, 2023, 09:35 |
Darwin Ortiz Rosales | TaC | 44692-11 | TARGET BOAT | Done | TaC coating sintering (second coating on same tube) | Tuesday, August 22, 2023, 09:29
The coated container was wrapped in 4 Ta foil heatshields.
Target temperature on OMEGA= 1850-1900 C
OMEGA slope:= 0.990
Target time at max temperature = 2 hours
Final Current TBHT= N/A
Final TGHT current= ~400A (adjustable)
Heating autoramp starged at 2A/min(1A/30s) on TGHT 100A
Then at 4A/min to =400 A.
Good vacuum = 5.0 e-04 Torr
Bad vacuum = 5.0E-02 Torr
IGP1 initial =2.2e-06 Torr
Tuesday, August 22, 2023, 10:25
IGP1= 2.31e-06 Torr
TGHT 98.0 A (RD), 1.35 V
Start ramping at 2A/min to 400A
Tuesday, August 22, 2023, 11:54
Reached 1860 @ TGHT = 353A, 6.16V (RD) Will leave for 2 hours
Tuesday, August 22, 2023, 14:07
1853C OMEGA
TGHT = 353 A, 6.2 V (RD)
IGP1= 2.88E-06 Torr
Starting ramp-down at -2A/min
Saturday, August 26, 2023, 09:37
Note: the coating looks really good . The second sintering on the second coating was 2 hours. Will test the coating during graphite material conditioning. |
|
642
|
Saturday, August 26, 2023, 09:41 |
Darwin Ortiz Rosales | TaC | 45220-10 | LP-SIS | Done | TaC coating sintering |
Saturday, August 26, 2023, 09:39
The coated container was wrapped in 4 Ta foil heatshields.
Target temperature on OMEGA= 1850-1900 C
OMEGA slope:= 0.990
Target time at max temperature = 4 hours
Final Current TBHT= 230 A
Final TGHT current= ~400A (adjustable)
Heating autoramp starged at 2A/min(1A/30s) on TGHT 100A
Then at 4A/min to =400 A TGHT and 230A TBHT
Good vacuum = 5.0 e-04 Torr
Bad vacuum = 5.0E-02 Torr
Initial IGP1= 8.7e-07 Torr
Saturday, August 26, 2023, 10:54
IGP1= 1.2e-06 Torr
Start ramp up at 4A/min on both heaters (2A/30s) until TGHT = 400A and TBHT=230A
Saturday, August 26, 2023, 11:32
Paused ramp to allow temperature to stabilize and record data
OMEGA= 1396 C
IGP1= 2.47e-06 Torr
Saturday, August 26, 2023, 11:52
Paused ramp to record data
OMEGA = 1544 C
IGP1=3.4e-06 Torr
Saturday, August 26, 2023, 12:09
Paused ramp to record data
OMEGA = 1653
IGP1 = 4.5e-06 Torr
Saturday, August 26, 2023, 12:33
Omega went up to 1878C. Lowered the current on TGHT to reach OMEGA = 1857 C
Will keep until 430 pm
IGP1- 3.4e-06 Torr
Saturday, August 26, 2023, 16:10
ramping down at -2A/min tght 1A/min tbht
1837 C OMEGA
|
|
643
|
Tuesday, August 29, 2023, 12:47 |
Darwin Ortiz Rosales | TaC | 45220-10 | LP-SIS | Done | TaC coating sintering | Tuesday, August 29, 2023, 12:46
The coated container was wrapped in 4 Ta foil heatshields.
Target temperature on OMEGA= 1850-1900 C
OMEGA slope:= 0.990
Target time at max temperature = 4 hours
Final Current TBHT= 230 A
Final TGHT current= ~400A (adjustable)
Heating autoramp starged at 2A/min(1A/30s) on TGHT 100A
Then at 4A/min to =400 A TGHT and 230A TBHT
Good vacuum = 5.0 e-04 Torr
Bad vacuum = 5.0E-02 Torr
Tuesday, August 29, 2023, 12:49
Initial heating start
IGP1= 6.0 e-06 Torr
Tuesday, August 29, 2023, 14:31
Paused ramping to take reading
IGP1= 5.98e-06 Torr
OMEGA = 1500 C
Tuesday, August 29, 2023, 15:24
OMEGA 1866 C
IGP1= 6.6e-6 Torr
|
|
644
|
Thursday, August 31, 2023, 07:09 |
Darwin Ortiz Rosales | TaC | 45447-4 | HP-FEBIAD | Done | TaC coating sintering | Thursday, August 31, 2023, 07:07
The coated container was wrapped in 3 Ta foil heatshields.
Target temperature on OMEGA= 1850-1900 C
OMEGA slope:= 0.990
Target time at max temperature = 4 hours
Final Current TBHT= 230 A
Final TGHT current= ~500A (adjustable)
Heating autoramp starged at 1A/min on TGHT and TBHT to 120A
Then at 2 A/min to =400 A TGHT and 230A TBHT
Good vacuum = 5.0 e-04 Torr
Bad vacuum = 5.0E-02 Torr
Initial IGP1= 7.7e-07 Torr
Thursday, August 31, 2023, 12:29
OMEGA=1238 C
IGP1=1.4e-06 Torr
Continue ramp
ramp @ 4A/min (2A/30s)
Thursday, August 31, 2023, 12:50
IGP1= 2.23e-06 Torr
OMEGA=1392 C
Thursday, August 31, 2023, 13:04
IGP1=2.7e-06 Torr
OMEGA=1443 C
Thursday, August 31, 2023, 13:18
IGP1= 3.8e-06 Torr
OMEGA=1537 C
Thursday, August 31, 2023, 14:38
OMEGA=1852C |
|
645
|
Tuesday, September 12, 2023, 09:54 |
Darwin Ortiz Rosales | TaC | 41369-2 | HP-SIS | Done | TaC coating sintering | Tuesday, September 12, 2023, 09:51
The coated container was wrapped in 3 Ta foil heatshield and left in evap2 over night to attain vacuum.
Target temperature on OMEGA= 1850-1900 C
OMEGA slope:= 0.990
Target time at max temperature = 4 hours
Final Current TBHT= 230 A
Final TGHT current= ~700A (adjustable)
Heating autoramp starged at 1A/min on TGHT and TBHT to 120A
Then at 2 A/min to =400 A TGHT and 230A TBHT
Good vacuum = 5.0 e-04 Torr
Bad vacuum = 5.0E-02 Torr
Initial IGP1= 2.7e-06 Torr
Tuesday, September 12, 2023, 7:00
Started autoramp @1A/min to 120A on both TGHT and TBHT
Tuesday, September 12, 2023, 09:53
Heating ramp set to 230A for both TGHT and TBHT. Rate at 2A/min for both heaters.
Tuesday, September 12, 2023, 11:21
Continued ramp on TGHT at 2A/min to 335A and now setting to 3A/min (1.5A/30s)
Tuesday, September 12, 2023, 11:47
|
TGHT |
|
Temperature ( C ) |
Voltage (V) |
Current (A) |
1205 |
5.5 |
392.0 |
Continue ramping @3A/min on TGHT
Tuesday, September 12, 2023, 13:33
Reached 1840 C at TGHT =677A and 10.5V
Will keep for 4 hours |
|
648
|
Friday, October 20, 2023, 07:24 |
Darwin Ortiz Rosales | TaC | 45447-11 | LP-SIS | Done | TaC coating sintering | Friday, October 20, 2023, 07:20
The coated container was wrapped in 4 Ta foil heatshields.
Vacuum IGP1 initial = 9.9 e-07 Torr
Target temperature on OMEGA= 1850-1900 C
OMEGA slope:= 0.990
Target time at max temperature = 4 hours
Final Current TBHT= 230 A
Final TGHT current= ~400A (adjustable)
Heating autoramp starged at 2A/min(1A/30s) on TGHT 100A
Then at 4A/min to =400 A TGHT and 230A TBHT
Good vacuum = 5.0 e-04 Torr
Bad vacuum = 5.0E-02 Torr
Friday, October 20, 2023, 07:24
Starting initial ramp
Vacuum IGP1 initial = 9.9 e-07 Torr
Friday, October 20, 2023, 08:55
After initial pressure bump continued heating at 1A/min to 120A to observe any other possible pressure bump.
Friday, October 20, 2023, 09:05
increased ramp to 4A/min to 400 TGHT and 230 TBHT
Friday, October 20, 2023, 09:35
OMEGA=1280 C
TGHT= 221.5 A, 3.24V
TBHT=228.9, 3.9V
Friday, October 20, 2023, 10:22
OMEGA 1852 C at TGHT = 390A, 6.5 V ; TBHT = 232 A, 4.0 V
Will leave for 4 hours
Friday, October 20, 2023, 14:16
About to start rampdown
TGHT @ -2A/min
TBHT@ -1A/min
Final OMEGA = 1840 C
IGP1 = 1.83e-06 Torr |
|
652
|
Friday, January 26, 2024, 07:06 |
Darwin Ortiz Rosales | TaC | 45447-1 | HP-FEBIAD | Done | TaC coating sintering | Friday, January 26, 2024, 07:05
The coated container was wrapped in 4 Ta foil heatshield and left in evap2 over night to attain vacuum.
Target temperature on OMEGA= 1850-1900 C
OMEGA slope:= 0.990
Target time at max temperature = 4 hours
Final Current TBHT= 230 A
Final TGHT current= ~700A (adjustable)
Heating autoramp starged at 1A/min on TGHT and TBHT to 120A
Then at 2 A/min to =400 A TGHT and 230A TBHT
Good vacuum = 5.0 e-04 Torr
Bad vacuum = 5.0E-02 Torr
Initial IGP1= 5.7e-05 Torr
Friday, January 26, 2024, 09:20
Pressure starts increasing at 125 A on TGHT and TBHT. Leaving it to equilibrate then will start ramping at 3A/min (1.5A/30s) to 700A on TGHT and 230A on TBHT
Friday, January 26, 2024, 13:18
leave sintering at 1838C . Will start rampdown at 5 pm.
IGP1= 6.10e-06 Torr
TGHT=680A, 10.14V
TBHT = 230A, 3.13V
Friday, January 26, 2024, 16:52
IGP1 = 3.0e10-6 Torr
OMEGA=1821 C
start rampdown @-2A/min TGHT and -1A/min TBHT |
|
653
|
Monday, January 29, 2024, 16:45 |
Darwin Ortiz Rosales | TaC | | LP-FEBIAD | Done | TaC coating sintering | Monday, January 29, 2024, 16:36
LP FEBIAD
wrapped in 4 Ta heatshields.
Will heat at 2A/min to 95A on TGHT and TBHT
Then will heat at 3A/min to 1800 C ~400A on TGHT and 230A on TBHT
Monday, January 29, 2024, 16:45
Initial IGP1= 5e-05 Torr
Monday, January 29, 2024, 20:35
1800C was at TGHT 410A, 6.9V RD and set current 418A
TBHT= 233 RD A, 3.2V
|
|
659
|
Friday, April 26, 2024, 06:19 |
Darwin Ortiz Rosales | TaC | 45447-29 | HP-SIS | Done | TaC coating sintering |
Monday, April 29, 2024, 19:50
Started coating with coating stand.
The coated container was wrapped in 3 Ta foil heatshields.
Vacuum IGP1 initial =9.1 e-07 Torr
Target temperature on OMEGA= 1850-1900 C
OMEGA slope:= 0.990
Target time at max temperature = 4 hours
Final Current TBHT= 230 A
Final TGHT current= ~700A (adjustable)
Heating autoramp starged at 2A/min(1A/30s) on TGHT 100A
Then at 2A/min to =700 A TGHT and 230A TBHT
Good vacuum = 5.0 e-04 Torr
Bad vacuum = 5.0E-02 Torr
Monday, April 29, 2024, 20:25
Reached 1810 @700A
Will leave until 1230am |
|
660
|
Wednesday, May 01, 2024, 11:54 |
Darwin Ortiz Rosales | TaC | 25447-27 | HP-SIS | Done | TaC coating sintering | Wednesday, May 01, 2024, 11:53
The coated container was wrapped in 4 Ta foil heatshields.
Vacuum IGP1 initial =8.1 e-06 Torr
Target temperature on OMEGA= 1850-1900 C
OMEGA slope:= 0.990
Target time at max temperature = 4 hours
Final Current TBHT= 230 A
Final TGHT current= ~500A (adjustable)
Heating autoramp starged at 3A/min(1A/30s) on TGHT 100A
Then at 2A/min to =400 A TGHT and 230A TBHT
Good vacuum = 5.0 e-04 Torr
Bad vacuum = 5.0E-02 Torr
Wednesday, May 01, 2024, 22:19
1830C reached at 670A. 10.0V TGHT
Start cooling after 4 hours. |
|
661
|
Tuesday, May 07, 2024, 06:20 |
Darwin Ortiz Rosales | TaC | | TARGET BOAT | Done | Sintering TaC coating on endcaps | Tuesday, May 07, 2024, 06:16
TP was swapped on previous day (May 6th)
protective screen installed.
Loaded 9 TaC coated end caps (groups of 4 and 5) and 2 TaC coated springs.
OMEGA Slope 0.99
Will heat to 1850-1900 C and hold for 4 hours
Good Vac = 5.0e-4 Torr
Bad Vac= 5.0 e-02 Torr
Initial IGP1=6.7E-07 Torr
|
|
675
|
Saturday, September 07, 2024, 09:55 |
Darwin Ortiz Rosales | TaC | 45447-13 | LP-SIS | Done | TaC coating sintering | Saturday, September 07, 2024, 09:54
The coated container was wrapped in 4 Ta foil heatshields.
Vacuum IGP1 initial =8.1 e-07 Torr
Target temperature on OMEGA= 1850-1900 C
OMEGA slope:= 0.990
Target time at max temperature = 4 hours
Final Current TBHT= 230 A
Final TGHT current= ~400A (adjustable)
Heating ramp manually to 50A on TGHT and TBHT
Then at 1A/min to =400 A TGHT and 230A TBHT
Good vacuum = 5.0 e-04 Torr
Bad vacuum = 5.0E-02 Torr
Saturday, September 07, 2024, 17:38
At 400 A set point on TGHT, read back is 392A and OMEGA reads 1840C. TBHT set to 230A reads 233A.
It will be kept at this current for four hours before rampdown. |
|
676
|
Monday, September 09, 2024, 19:08 |
Darwin Ortiz Rosales | TaC | | LP-SIS | Done | TaC coating sintering LP-SIS with gas line | Monday, September 09, 2024, 19:06
The coated container was wrapped in 4 Ta foil heatshields.
Vacuum IGP1 initial =2.6 e-06 Torr
Target temperature on OMEGA= 1800-1900 C
OMEGA slope:= 0.990
Target time at max temperature = 4 hours
Final Current TBHT= 230 A
Final TGHT current= ~400A (adjustable)
Heating autoramp starged at 1A/min on TGHT and TBHT until outgassin peak passed
Then at 1A/min to =400 A TGHT and 230A TBHT
Good vacuum = 5.0 e-04 Torr
Bad vacuum = 5.0E-02 Torr
Monday, September 09, 2024, 19:08
Peak passed around 70A will continue ramp up at 1A/min to 400A on TGHT and 230A TBHT
Tuesday, September 10, 2024, 13:13
Was ramped down at -2 A/min TGHT and -1 A/min TBHT
|
|