620
|
Wednesday, April 12, 2023, 09:53 |
Darwin Ortiz Rosales | TaC | | TARGET BOAT | Done | TaC coating sintering |
Wednesday, April 12, 2023, 09:53
The coated container was wrapped in 3 Ta foil heatshields.
Target temperature on OMEGA= 1850-1900 C
OMEGA slope:= 0.990
Target time at max temperature = 4 hours
Final Current TBHT= N/A
Final TGHT current= ~400A (adjustable)
Heating autoramp starged at 4A/min on TGHT 40A
Then at 2A/min to 90 A.
Good vacuum = 5.0 e-04 Torr
Bad vacuum = 5.0E-02 Torr
IGP1 initial = 4.7e-07 Torr
Wednesday, April 12, 2023, 10:46
heating at 2A/min to 90A
Wednesday, April 12, 2023, 11:18
Autoramping at 2A/min to 230A
Wednesday, April 12, 2023, 11:53
Autoramping at 4A/min to 230 A
Wednesday, April 12, 2023, 13:57
Autoramping to 380A

Wednesday, April 12, 2023, 14:07
manually adjusted TGHT to 384A. 6.6 V
OMEGA reads 1859 C. Leaving for 4 hours.
Wednesday, April 12, 2023, 18:36
Started rampdown at -2A/min |
621
|
Sunday, April 16, 2023, 14:08 |
Darwin Ortiz Rosales | TaC | 45220-14 | LP-SIS | Done | TaC coating sintering | Sunday, April 16, 2023, 14:08
The coated container was wrapped in four Ta foil heatshields.
Target temperature on OMEGA= 1860-1900 C
OMEGA slope:= 0.990
Target time at max temperature = 4 hours
Final Current TBHT= 230A
Final TGHT current= ~400A (adjustable)
Good vacuum = 5.0 e-04 Torr
Bad vacuum = 5.0E-02 Torr
Ramped at 2A/min to 230 A on both TGHT and TBHT.
Then ramped @4A/min to 385 A on TGHT. Then ramped manually to 1850 C
Sunday, April 16, 2023, 18:31
At 428A reached 1830C on OMEGA
Sunday, April 16, 2023, 22:24
Start ramp down @ -2A/min TGHT and -1A/min TBHT |
622
|
Tuesday, April 18, 2023, 06:48 |
Darwin Ortiz Rosales | TaC | 45220-11 | LP-SIS | Done | TaC coating sintering | Tuesday, April 18, 2023, 06:46
The coated container was wrapped in four Ta foil heatshields.
Target temperature on OMEGA= 1830-1900 C
OMEGA slope:= 0.990
Target time at max temperature = 4 hours
Final Current TBHT= 230A
Final TGHT current= ~400A (adjustable)
Good vacuum = 5.0 e-04 Torr
Bad vacuum = 5.0E-02Torr
Tuesday, April 18, 2023, 06:47
IGP1 initial = 3.80e-07 Torr
Start ramp up at 2A min to 230 on both TBHT and TGHT
Tuesday, April 18, 2023, 09:43
Autoramping TGHT to 380 A @4/min (2/A 30s)
Tuesday, April 18, 2023, 10:36
manually ramped to 416A, 6.8 V on TGHT
TBHT = 230 A, 4.0V
Holding here for 4 hours.
OMEGA = 1863 c
Tuesday, April 18, 2023, 11:26
increased current on TGHT to 418 because temperature had slipped below 1850 C
Tuesday, April 18, 2023, 14:52
ramping down @-2A/min TGHT and -1A/min TBHT |
623
|
Thursday, April 20, 2023, 07:00 |
Darwin Ortiz Rosales | TaC | 41790-7 | LP-FEBIAD | Done | TaC coating sintering | Thursday, April 20, 2023, 06:59
The coated container was wrapped in 3 Ta foil heatshields.
Target temperature on OMEGA= 1830-1900 C
OMEGA slope:= 0.990
Target time at max temperature = 4 hours
Final Current TBHT= 230A
Final TGHT current= ~400A (adjustable)
Good vacuum = 5.0 e-04 Torr
Bad vacuum = 5.0E-02 Torr
Thursday, April 20, 2023, 07:02
Started TBHT and TBHT ramp at 1A/min to 230A
Thursday, April 20, 2023, 09:55
From 170 A started ramping at 2A/min to 230 A on both TGHT and TBHT
Thursday, April 20, 2023, 10:27
Starting ramp on TGHT to 300A, TBHT kept at 230A, 3.0 V
Thursday, April 20, 2023, 11:19
ramping at 4A/min (2A/30s) to 340 A on TGHT
Thursday, April 20, 2023, 11:40
After plot, ramping @ 2A/min to 460A on TGHT expected to reeach at 1245. 4 hours at 4:45 pm
Thursday, April 20, 2023, 13:44
Note that top temperature was 1835C @ 480 A, 7.9V
Thursday, April 20, 2023, 17:00
Start rampdown at -2A/min TGHT and -1A/min TBHT
Monday, April 24, 2023, 13:35
The coating is not as good as expected. Maybe too much time between coating and sintering. Will not use for TiC target. |
624
|
Monday, April 24, 2023, 09:12 |
Darwin Ortiz Rosales | TaC | 44692-5 | LP-FEBIAD | Done | TaC coating sintering | Sunday, April 23, 2023, 07:23
The coated container was wrapped in 3 Ta foil heatshields.
Target temperature on OMEGA= 1850-1900 C
OMEGA slope:= 0.990
Target time at max temperature = 4 hours
Final Current TBHT= 230A
Final TGHT current= ~450A (adjustable)
Good vacuum = 5.0 e-04Torr
Bad vacuum = 5.0E-02 Torr
Interlock tripped (HS water flow, SP6, GE, CHIL <--supposed to be bypassed)
Monday, April 24, 2023, 13:24
In the morning Carla found some loose wires behind EVAP 2. Wires connecting the flow-meter. The interlock problem was fixed as it was noted there was normal HS water flow.
Started ramp up at 1A/min to 230 A. The first outgassing bump observed and wil start autoramp @ 2A/min on both TGHT and TBHT (target is 400A on TGHT and 230A on TBHT).
Monday, April 24, 2023, 16:24
Reached 480A on TGHT at 4 pm. Manually tapped to 500 A on TGHT , OMEGA=1853C. Will keep until 8 pm.
Monday, April 24, 2023, 19:56
OMEGA= 1853 C
IGP1= 1.5e-06 Torr
TGHT = 500A, 8.5V
TBHT= 230A, 3.1V
rampdown TGHT @-2A/min and TBHT @ -1A/min

|
632
|
Friday, April 28, 2023, 11:31 |
Darwin Ortiz Rosales | TaC | Boat | TARGET BOAT | Done | TaC coated endcaps and spring sintering | Friday, April 28, 2023, 11:29
loaded 14 TaC coated end caps and 2 TaC coated springs.
OMEGA Slope 0.99
Will heat to 1850-1900 C and hold for 4 hours
Good Vac = 5.0e-4 Torr
Bad Vac= 5.0 e-02 Torr
2 end caps had slight damage and were disposed of. 12 good caps and 2 good springs. |
637
|
Thursday, June 08, 2023, 09:29 |
Darwin Ortiz Rosales | TaC | | TARGET BOAT | Done | TaC coated endcaps and spring sintering (new TaC) | Thursday, June 08, 2023, 09:28
Using smaller particle size TaC no ball mill procedure.
Loaded 2 TaC coated end caps and 1 TaC coated springs.
OMEGA Slope 0.99
Will heat to 1850-1900 C and hold for 4 hours
Good Vac = 5.0e-4 Torr
Bad Vac= 5.0 e-02 Torr
Initial IGP1= 4.07E-06 Torr
Thursday, June 08, 2023, 10:36
ramped @ 2A/min to 100A. Then after pressure stabilized starting ramp at 4A/min (2A/30s) to 400A
Thursday, June 08, 2023, 12:24
reached 1850 C with Set current = 480 and RD current = 470.6A, V = 7.7
Will leave for 4 hours.
Thursday, June 08, 2023, 15:31
ramping down at -2A/min (-1A/30s) |
639
|
Tuesday, August 15, 2023, 12:03 |
Darwin Ortiz Rosales | TaC | 44692-11 | TARGET BOAT | Done | TaC coating sintering | Tuesday, August 15, 2023, 10:48
The coated container was wrapped in 4 Ta foil heatshields.
Target temperature on OMEGA= 1850-1900 C
OMEGA slope:= 0.990
Target time at max temperature = 4 hours
Final Current TBHT= N/A
Final TGHT current= ~400A (adjustable)
Heating autoramp starged at 2A/min(1A/30s) on TGHT 100A
Then at 4A/min to 100 A.
Good vacuum = 5.0 e-04 Torr
Bad vacuum = 5.0E-02 Torr
IGP1 initial =8.9e-06 Torr
Tuesday, August 15, 2023, 13:00
Tuesday, August 15, 2023, 13:00
Pressure stabilizing @8.8e-06 Torr
starting 2A/30s ramp to 400 A
Tuesday, August 15, 2023, 14:02
TGHT RD CURRENT = 331.4A, 5.8V, SET CURRENT=338 A.
OMEGA = 1855
IGP1= 1.5e-05 Torr
Leave for 4 hours
Tuesday, August 15, 2023, 15:05
Temperature dropped slightly to 1820C so increased current set point to 345A, and RD was at 338A, 5.9V
OMEGA increased to 1842C
Tuesday, August 15, 2023, 17:59
OMEGA = 1823C
TGHT= RD 338A, 5.9V SET= 345A
IGP1= 4.0e-06 Torr
Start rampdown at -2A/min |
640
|
Tuesday, August 22, 2023, 09:35 |
Darwin Ortiz Rosales | TaC | 44692-11 | TARGET BOAT | Done | TaC coating sintering (second coating on same tube) | Tuesday, August 22, 2023, 09:29
The coated container was wrapped in 4 Ta foil heatshields.
Target temperature on OMEGA= 1850-1900 C
OMEGA slope:= 0.990
Target time at max temperature = 2 hours
Final Current TBHT= N/A
Final TGHT current= ~400A (adjustable)
Heating autoramp starged at 2A/min(1A/30s) on TGHT 100A
Then at 4A/min to =400 A.
Good vacuum = 5.0 e-04 Torr
Bad vacuum = 5.0E-02 Torr
IGP1 initial =2.2e-06 Torr
Tuesday, August 22, 2023, 10:25
IGP1= 2.31e-06 Torr
TGHT 98.0 A (RD), 1.35 V
Start ramping at 2A/min to 400A
Tuesday, August 22, 2023, 11:54
Reached 1860 @ TGHT = 353A, 6.16V (RD) Will leave for 2 hours
Tuesday, August 22, 2023, 14:07
1853C OMEGA
TGHT = 353 A, 6.2 V (RD)
IGP1= 2.88E-06 Torr
Starting ramp-down at -2A/min
Saturday, August 26, 2023, 09:37
Note: the coating looks really good . The second sintering on the second coating was 2 hours. Will test the coating during graphite material conditioning. |
642
|
Saturday, August 26, 2023, 09:41 |
Darwin Ortiz Rosales | TaC | 45447-12 | LP-SIS | Done | TaC coating sintering |
Saturday, August 26, 2023, 09:39
The coated container was wrapped in 4 Ta foil heatshields.
Target temperature on OMEGA= 1850-1900 C
OMEGA slope:= 0.990
Target time at max temperature = 4 hours
Final Current TBHT= 230 A
Final TGHT current= ~400A (adjustable)
Heating autoramp starged at 2A/min(1A/30s) on TGHT 100A
Then at 4A/min to =400 A TGHT and 230A TBHT
Good vacuum = 5.0 e-04 Torr
Bad vacuum = 5.0E-02 Torr
Initial IGP1= 8.7e-07 Torr
Saturday, August 26, 2023, 10:54

IGP1= 1.2e-06 Torr
Start ramp up at 4A/min on both heaters (2A/30s) until TGHT = 400A and TBHT=230A
Saturday, August 26, 2023, 11:32
Paused ramp to allow temperature to stabilize and record data
OMEGA= 1396 C
IGP1= 2.47e-06 Torr

Saturday, August 26, 2023, 11:52
Paused ramp to record data
OMEGA = 1544 C
IGP1=3.4e-06 Torr

Saturday, August 26, 2023, 12:09
Paused ramp to record data
OMEGA = 1653
IGP1 = 4.5e-06 Torr

Saturday, August 26, 2023, 12:33
Omega went up to 1878C. Lowered the current on TGHT to reach OMEGA = 1857 C
Will keep until 430 pm
IGP1- 3.4e-06 Torr

Saturday, August 26, 2023, 16:10

ramping down at -2A/min tght 1A/min tbht
1837 C OMEGA
|
643
|
Tuesday, August 29, 2023, 12:47 |
Darwin Ortiz Rosales | TaC | 45220-10 | LP-SIS | Done | TaC coating sintering | Tuesday, August 29, 2023, 12:46
The coated container was wrapped in 4 Ta foil heatshields.
Target temperature on OMEGA= 1850-1900 C
OMEGA slope:= 0.990
Target time at max temperature = 4 hours
Final Current TBHT= 230 A
Final TGHT current= ~400A (adjustable)
Heating autoramp starged at 2A/min(1A/30s) on TGHT 100A
Then at 4A/min to =400 A TGHT and 230A TBHT
Good vacuum = 5.0 e-04 Torr
Bad vacuum = 5.0E-02 Torr
Tuesday, August 29, 2023, 12:49
Initial heating start
IGP1= 6.0 e-06 Torr
Tuesday, August 29, 2023, 14:31
Paused ramping to take reading

IGP1= 5.98e-06 Torr
OMEGA = 1500 C
Tuesday, August 29, 2023, 15:24
OMEGA 1866 C
IGP1= 6.6e-6 Torr

|
644
|
Thursday, August 31, 2023, 07:09 |
Darwin Ortiz Rosales | TaC | 45447-4 | HP-FEBIAD | Done | TaC coating sintering | Thursday, August 31, 2023, 07:07
The coated container was wrapped in 3 Ta foil heatshields.
Target temperature on OMEGA= 1850-1900 C
OMEGA slope:= 0.990
Target time at max temperature = 4 hours
Final Current TBHT= 230 A
Final TGHT current= ~500A (adjustable)
Heating autoramp starged at 1A/min on TGHT and TBHT to 120A
Then at 2 A/min to =400 A TGHT and 230A TBHT
Good vacuum = 5.0 e-04 Torr
Bad vacuum = 5.0E-02 Torr
Initial IGP1= 7.7e-07 Torr
Thursday, August 31, 2023, 12:29

OMEGA=1238 C
IGP1=1.4e-06 Torr
Continue ramp
ramp @ 4A/min (2A/30s)
Thursday, August 31, 2023, 12:50

IGP1= 2.23e-06 Torr
OMEGA=1392 C
Thursday, August 31, 2023, 13:04

IGP1=2.7e-06 Torr
OMEGA=1443 C
Thursday, August 31, 2023, 13:18

IGP1= 3.8e-06 Torr
OMEGA=1537 C
Thursday, August 31, 2023, 14:38

OMEGA=1852C |
645
|
Tuesday, September 12, 2023, 09:54 |
Darwin Ortiz Rosales | TaC | 41369-2 | HP-SIS | Done | TaC coating sintering | Tuesday, September 12, 2023, 09:51
The coated container was wrapped in 3 Ta foil heatshield and left in evap2 over night to attain vacuum.
Target temperature on OMEGA= 1850-1900 C
OMEGA slope:= 0.990
Target time at max temperature = 4 hours
Final Current TBHT= 230 A
Final TGHT current= ~700A (adjustable)
Heating autoramp starged at 1A/min on TGHT and TBHT to 120A
Then at 2 A/min to =400 A TGHT and 230A TBHT
Good vacuum = 5.0 e-04 Torr
Bad vacuum = 5.0E-02 Torr
Initial IGP1= 2.7e-06 Torr
Tuesday, September 12, 2023, 7:00
Started autoramp @1A/min to 120A on both TGHT and TBHT
Tuesday, September 12, 2023, 09:53
Heating ramp set to 230A for both TGHT and TBHT. Rate at 2A/min for both heaters.
Tuesday, September 12, 2023, 11:21
Continued ramp on TGHT at 2A/min to 335A and now setting to 3A/min (1.5A/30s)
Tuesday, September 12, 2023, 11:47
|
TGHT |
|
Temperature ( C ) |
Voltage (V) |
Current (A) |
1205 |
5.5 |
392.0 |
Continue ramping @3A/min on TGHT
Tuesday, September 12, 2023, 13:33
Reached 1840 C at TGHT =677A and 10.5V
Will keep for 4 hours |
648
|
Friday, October 20, 2023, 07:24 |
Darwin Ortiz Rosales | TaC | 45447-11 | LP-SIS | Done | TaC coating sintering | Friday, October 20, 2023, 07:20
The coated container was wrapped in 4 Ta foil heatshields.
Vacuum IGP1 initial = 9.9 e-07 Torr
Target temperature on OMEGA= 1850-1900 C
OMEGA slope:= 0.990
Target time at max temperature = 4 hours
Final Current TBHT= 230 A
Final TGHT current= ~400A (adjustable)
Heating autoramp starged at 2A/min(1A/30s) on TGHT 100A
Then at 4A/min to =400 A TGHT and 230A TBHT
Good vacuum = 5.0 e-04 Torr
Bad vacuum = 5.0E-02 Torr
Friday, October 20, 2023, 07:24
Starting initial ramp
Vacuum IGP1 initial = 9.9 e-07 Torr
Friday, October 20, 2023, 08:55
After initial pressure bump continued heating at 1A/min to 120A to observe any other possible pressure bump.
Friday, October 20, 2023, 09:05
increased ramp to 4A/min to 400 TGHT and 230 TBHT
Friday, October 20, 2023, 09:35
OMEGA=1280 C
TGHT= 221.5 A, 3.24V
TBHT=228.9, 3.9V
Friday, October 20, 2023, 10:22
OMEGA 1852 C at TGHT = 390A, 6.5 V ; TBHT = 232 A, 4.0 V
Will leave for 4 hours
Friday, October 20, 2023, 14:16
About to start rampdown
TGHT @ -2A/min
TBHT@ -1A/min
Final OMEGA = 1840 C
IGP1 = 1.83e-06 Torr |
652
|
Friday, January 26, 2024, 07:06 |
Darwin Ortiz Rosales | TaC | 45447-1 | HP-FEBIAD | Done | TaC coating sintering | Friday, January 26, 2024, 07:05
The coated container was wrapped in 4 Ta foil heatshield and left in evap2 over night to attain vacuum.
Target temperature on OMEGA= 1850-1900 C
OMEGA slope:= 0.990
Target time at max temperature = 4 hours
Final Current TBHT= 230 A
Final TGHT current= ~700A (adjustable)
Heating autoramp starged at 1A/min on TGHT and TBHT to 120A
Then at 2 A/min to =400 A TGHT and 230A TBHT
Good vacuum = 5.0 e-04 Torr
Bad vacuum = 5.0E-02 Torr
Initial IGP1= 5.7e-05 Torr
Friday, January 26, 2024, 09:20
Pressure starts increasing at 125 A on TGHT and TBHT. Leaving it to equilibrate then will start ramping at 3A/min (1.5A/30s) to 700A on TGHT and 230A on TBHT
Friday, January 26, 2024, 13:18
leave sintering at 1838C . Will start rampdown at 5 pm.
IGP1= 6.10e-06 Torr
TGHT=680A, 10.14V
TBHT = 230A, 3.13V
Friday, January 26, 2024, 16:52
IGP1 = 3.0e10-6 Torr
OMEGA=1821 C
start rampdown @-2A/min TGHT and -1A/min TBHT |
653
|
Monday, January 29, 2024, 16:45 |
Darwin Ortiz Rosales | TaC | | LP-FEBIAD | Done | TaC coating sintering | Monday, January 29, 2024, 16:36
LP FEBIAD
wrapped in 4 Ta heatshields.
Will heat at 2A/min to 95A on TGHT and TBHT
Then will heat at 3A/min to 1800 C ~400A on TGHT and 230A on TBHT
Monday, January 29, 2024, 16:45
Initial IGP1= 5e-05 Torr
Monday, January 29, 2024, 20:35
1800C was at TGHT 410A, 6.9V RD and set current 418A
TBHT= 233 RD A, 3.2V
|
659
|
Friday, April 26, 2024, 06:19 |
Darwin Ortiz Rosales | TaC | 45447-29 | HP-SIS | Done | TaC coating sintering |
Monday, April 29, 2024, 19:50
Started coating with coating stand.
The coated container was wrapped in 3 Ta foil heatshields.
Vacuum IGP1 initial =9.1 e-07 Torr
Target temperature on OMEGA= 1850-1900 C
OMEGA slope:= 0.990
Target time at max temperature = 4 hours
Final Current TBHT= 230 A
Final TGHT current= ~700A (adjustable)
Heating autoramp starged at 2A/min(1A/30s) on TGHT 100A
Then at 2A/min to =700 A TGHT and 230A TBHT
Good vacuum = 5.0 e-04 Torr
Bad vacuum = 5.0E-02 Torr
Monday, April 29, 2024, 20:25
Reached 1810 @700A
Will leave until 1230am |
660
|
Wednesday, May 01, 2024, 11:54 |
Darwin Ortiz Rosales | TaC | 25447-27 | HP-SIS | Done | TaC coating sintering | Wednesday, May 01, 2024, 11:53
The coated container was wrapped in 4 Ta foil heatshields.
Vacuum IGP1 initial =8.1 e-06 Torr
Target temperature on OMEGA= 1850-1900 C
OMEGA slope:= 0.990
Target time at max temperature = 4 hours
Final Current TBHT= 230 A
Final TGHT current= ~500A (adjustable)
Heating autoramp starged at 3A/min(1A/30s) on TGHT 100A
Then at 2A/min to =400 A TGHT and 230A TBHT
Good vacuum = 5.0 e-04 Torr
Bad vacuum = 5.0E-02 Torr
Wednesday, May 01, 2024, 22:19
1830C reached at 670A. 10.0V TGHT
Start cooling after 4 hours. |
661
|
Tuesday, May 07, 2024, 06:20 |
Darwin Ortiz Rosales | TaC | | TARGET BOAT | Done | Sintering TaC coating on endcaps | Tuesday, May 07, 2024, 06:16
TP was swapped on previous day (May 6th)
protective screen installed.
Loaded 9 TaC coated end caps (groups of 4 and 5) and 2 TaC coated springs.
OMEGA Slope 0.99
Will heat to 1850-1900 C and hold for 4 hours
Good Vac = 5.0e-4 Torr
Bad Vac= 5.0 e-02 Torr
Initial IGP1=6.7E-07 Torr
|
674
|
Friday, August 30, 2024, 11:33 |
Darwin Ortiz Rosales | TaC | 45447-8 | LP-IG-LIS | Done | TaC coating sintering | Friday, August 30, 2024, 11:31
The coated container was wrapped in 4 Ta foil heatshields.
Vacuum IGP1 initial =3.1 e-07 Torr
Target temperature on OMEGA= 1850-1900 C
OMEGA slope:= 0.990
Target time at max temperature = 4 hours
Final Current TBHT= 230 A
Final TGHT current= ~400A (adjustable)
Heating autoramp starged at 1A/min on TGHT 100A and TBHT
Then at 1A/min to =400 A TGHT and 230A TBHT
Good vacuum = 5.0 e-04 Torr
Bad vacuum = 5.0E-02 Torr
note: Left TBHT hole is off from center by a good margin
Sunday, September 01, 2024, 07:32
Starting initial ramp at 1A/min to 50A
Sunday, September 01, 2024, 15:20
have ramped ;up at 1A/min on both TGHT and TBHT but had two issues.
1) Set current and readback current have discrepancies but the TBHT discrepancy is significant (TBHT Set at 188 while RD is 231.9 A @ 1.9V)
TGHT also has odd behavior with set point 405 giving 392A RD and 0.067V. Will hold until 430pm before starting ramp down
Sunday, September 01, 2024, 16:30
Started rampdown at -2A/min TGHT and -1A/min TBHT
Note: OMEGA not able to give any reasonable readings
Tuesday, September 03, 2024, 13:51
After troubleshooting EVAP2 it was found that a copper line was touching the metal encasement grid most likely resulting in a short. A short was seeing and it disappeared after moving the copper line away from the grid.
Upon restarting on epics the PS went to maximum current and it was shut off after 30seconds to a minute. The system was checked again by Arthur and TGHT was manually increased to 5A and then set to Zero again. Arthur thinks that the PS probably requires this step after switching from local controls to remote. Will start the sintering again as the container is coated but not sintered.
Tuesday, September 03, 2024, 14:03
ramping at 1A/min on both TGHT and TBHT to 90A.
Tuesday, September 03, 2024, 22:25
Started rampdown at -2A/min TGHT and -1A/min TBHT. HIgh temperature from OMEGA was 1825 C at 430A readback on TGHT. |
|