Entry  Monday, March 10, 2025, 09:56, Darwin Ortiz Rosales, Empty, 45447-3, HP-FEBIAD, Done, TaC coating sintering 

Monday, March 10, 2025, 09:50

The coated container was wrapped in 4 Ta foil heatshield and left in evap2  over weekend to decrease pressure.

Target temperature on OMEGA= 1850-1900 C

OMEGA slope:= 0.990

Target time at max temperature = 4 hours

Final Current TBHT= 230 A

Final TGHT current= ~650A (adjustable)

Heating autoramp starged at 2A/min on  TGHT  and TBHT to 120A

Then at 2 A/min  to =400 A TGHT and 230A TBHT

Good vacuum = 5.0 e-04 Torr

Bad vacuum = 5.0E-02 Torr

Initial IGP1=


 Monday, March 10, 2025, 10:36

Initial IGP1= 8.5 e-06 torr

Starting ramp to 120A for both TGHT and TBHT


Monday, March 10, 2025, 16:57

RD TGHT =686A set to 700A, 10.8V

TBHT = 230A, 3.1V

OMEGA= 1710

Will leave for 4 hours


 Monday, March 10, 2025, 20:42

IGP1=7.9e-06 Torr

OMEGA= 1750 C

TGHT = 686 A, 10.8V

TBHT= 230A, 3.1 V

starting rampdown at -2A/min TGHT and -1A/min TBHT

 

Entry  Friday, April 26, 2024, 06:19, Darwin Ortiz Rosales, TaC, 45447-29, HP-SIS, Done, TaC coating sintering 

 Monday, April 29, 2024, 19:50

Started coating with coating stand.

The coated container was wrapped in 3 Ta foil heatshields.

Vacuum IGP1 initial =9.1 e-07 Torr

Target temperature on OMEGA= 1850-1900 C

OMEGA slope:= 0.990

Target time at max temperature = 4 hours

Final Current TBHT= 230 A

Final TGHT current= ~700A (adjustable)

Heating autoramp starged at 2A/min(1A/30s) on  TGHT  100A

Then at 2A/min  to =700 A TGHT and 230A TBHT

Good vacuum = 5.0 e-04 Torr

Bad vacuum = 5.0E-02 Torr


Monday, April 29, 2024, 20:25

Reached 1810 @700A

Will leave until 1230am

Entry  Saturday, February 01, 2025, 09:24, Darwin Ortiz Rosales, Empty, 45447-28, HP-SIS, Done, TaC coating sintering 

Saturday, February 01, 2025, 09:23

The coated container was wrapped in 4 Ta foil heatshield and left in evap2 over night to attain vacuum.

Target temperature on OMEGA= 1850-1900 C

OMEGA slope:= 0.990

Target time at max temperature = 4 hours

Final Current TBHT= 230 A

Final TGHT current= ~650A (adjustable)

Heating autoramp starged at 1A/min on  TGHT  and TBHT to 120A

Then at 2 A/min  to =400 A TGHT and 230A TBHT

Good vacuum = 5.0 e-04 Torr

Bad vacuum = 5.0E-02 Torr

Initial IGP1=5.6e-07Torr


Saturday, February 01, 2025, 11:05

@ 194A, 2.5V on TGHT, the pressure is dropping (has been dropping since 150A).  starting ramp at 4a/min


Thursday, February 13, 2025, 11:40

Log entries lost as computer rebooted.  Max temperature on OMEGA was 1850 C and held for 4 hours.  Cooled @ -2A/min TGHT and -1A/min TBHT.

Entry  Monday, March 03, 2025, 17:58, Darwin Ortiz Rosales, Empty, 45447-21, LP-FEBIAD, Done, TaC coating sintering 

Monday, March 03, 2025, 17:56

LP FEBIAD WO# 45447-21 initial wt=471.0 g (without T bar)

wrapped in 4 Ta heatshields.

Will heat at 2A/min to 95A on TGHT and TBHT

Then will heat at 2A/min to 1800 C ~400A on TGHT and 230A on TBHT


 Monday, March 03, 2025, 18:01

IGP1=3.3e-06 Torr

started initial ramp to 95A


Monday, March 03, 2025, 21:52

Start 4 hour count at 940 pm 

OMEGA reading 1750 C

TGHT= 435 A set and RD = 426 A, 7.0V

TGHT = 230A


Tuesday, March 04, 2025, 01:42

Start rampdown

Entry  Friday, March 28, 2025, 10:34, Darwin Ortiz Rosales, Empty, 45447-20, LP-SIS, Done, TaC coating sintering 

Friday, March 28, 2025, 06:49

The coated container was wrapped in 4 Ta foil heatshields.

Vacuum IGP1 initial =8.0e-07 Torr

Target temperature on OMEGA= 1800-1850 C

OMEGA slope:= 0.990

Target time at max temperature = 4 hours

Final Current TBHT= 230 A

Final TGHT current= ~400A (adjustable)

Good vacuum = 5.0 e-04 Torr

Bad vacuum = 5.0E-02 Torr

Starting ramp at 2A/min


Friday, March 28, 2025, 09:41

At 412A readback on TGHT OMEGA reads 1702 C.  Maybe re-use of Ta heatshields resulted in loss of efficiency.  Will ramp to 420 A and leave for 4 hours.


Friday, March 28, 2025, 14:25

Started rampdown at -2A/min TGHT and -1A/min TBHT

Entry  Thursday, March 20, 2025, 06:10, Darwin Ortiz Rosales, Empty, 45447-19, LP-SIS, Done, TaC coating sintering 

Wednesday, March 19, 2025, 13:08

The coated container was wrapped in 4 Ta foil heatshields.

Vacuum IGP1 initial =

Target temperature on OMEGA= 1800-1850 C

OMEGA slope:= 0.990

Target time at max temperature = 4 hours

Final Current TBHT= 230 A

Final TGHT current= ~400A (adjustable)

Good vacuum = 5.0 e-04 Torr

Bad vacuum = 5.0E-02 Torr


Thursday, March 20, 2025, 06:10 

IGP1 initial = 6.1e-7 Torr

 start ramp at 2A/min


Thursday, March 20, 2025, 07:04

paused ramp to prevent pressure spike


Thursday, March 20, 2025, 10:16

OMEGA 1800 C @ TGHT = 402A, 6.8V

Will leave for 4 hours.


Thursday, March 20, 2025, 13:53

Starting rampdown at 2A/min TGHT and 1A/min TBHT

Entry  Tuesday, March 25, 2025, 15:26, Darwin Ortiz Rosales, Empty, 45447-16, LP-SIS, Done, TaC coating sintering 

Tuesday, March 25, 2025, 15:25

The coated container as wrapped in 4 Ta foil heatshields.

Vacuum IGP1 initial =e-07 Torr

Target temperature on OMEGA= 1800-1850 C

OMEGA slope:= 0.990

Target time at max temperature = 4 hours

Final Current TBHT= 230 A

Final TGHT current= ~400A (adjustable)

Good vacuum = 5.0 e-04 Torr

Bad vacuum = 5.0E-02 Torr

Will be left overnight to pump down


Wednesday, March 26, 2025, 09:07

starting ramp up at 2A/min to 230A for both TGHT and TBHT


Wednesday, March 26, 2025, 12:48

1800 C at 400A TGHT, 6.9V TGHT

Leaving for 4 hours

Entry  Monday, July 22, 2024, 14:59, Aaron Schmidt, Ta, 45447-14, LP-SIS, In progress, Conditioning Ta#67 Thin foil  

 Ta#67 Thin foil LP-SIS target description: 

Total Ta foils = 470 loaded into 2 packs of 235 foils each.

Foil Thickness = 0.010mm (0.0004") avg Measured. 

Target material batch:  https://elog.triumf.ca/TIS/Target+Production/143

Target density = 4.498 g/cm3

Target length = 3.7465 cm

Total Mass = 16.8509 g [Incl foils + Ta wire on 2 packs]

Total mass w/ Target oven =  415g (No end caps)

Discs in target are arranged as follows: 2packs

Dimpling direction on foils/ Packs.                                                               --> Center <--

No Ta foil heat shield added


Monday, July 22, 2024, 14:53: Roughing. 

Halt roughing. Install heat plates.

Monday, July 22, 2024, 15:06: Roughing.

Monday, July 22, 2024, 15:26: TP On.

Monday, July 22, 2024, 15:34: TP Timeout. Restart. 

Monday, July 22, 2024, 15:35: TP at speed (Green) 

Monday, July 22, 2024, 15:36: PS On. TGHT / TBHT to 5/5 A manually. OK. Tap down. 


Tuesday, July 23, 2024, 07:03: Auto-ramping TGHT / TBHT to 120 / 60 A @ 2 A per min. Desired temperature 1900 C.

Tuesday, July 23, 2024, 08:02: OMEGA IR2C Laser off. Slope set to 0.98. 

Tuesday, July 23, 2024, 08:06: Auto-ramping TGHT / TBHT to 300 / 150 A @ 2 A per min. 

Tuesday, July 23, 2024, 09:57: Auto-ramping TGHT / TBHT to 500 / 200 A @ 2 A per min. Temperature @ 1022 C. 

Tuesday, July 23, 2024, 11:59: Auto-ramping TGHT / TBHT to 580 / 230 A @ 2 A per min. Temperature @ 1538 C.

Tuesday, July 23, 2024, 12:46: TGHT / TBHT @ 580 / 230 A (569 / 233 A). Temperature @ 1710 C. Vacuum @ 7.44e-06T. 

Tuesday, July 23, 2024, 14:23: TGHT / TBHT @ 580 / 230 A (568 / 233 A). Auto-ramping TGHT to 620 A @ 2 A per min. Temperature @ 1721 C. Vacuum @ 5.06e-06T. 

Tuesday, July 23, 2024, 14:48: TGHT / TBHT @ 620 / 230 A 609 / 233 A). Auto-ramping TGHT to 630 A @ 2 A per min. Temperature @ 1799 C. Vacuum @ 6.76e-06T.  

Tuesday, July 23, 2024, 14:56:  TGHT / TBHT @ 630 / 230 A 618 / 233 A). Temperature @ 1816 C. Vacuum @ 7.14e-06T. Tapping up manually TGHT to get to 1900degC 

Tuesday, July 23, 2024, 15:23:  TGHT / TBHT @ 670 / 230 A 657 / 233 A).  Temperature @ 1890 C. Vacuum @ 9.94e-06T.  Stopping and waiting for 5min.

Tuesday, July 23, 2024, 15:39: Target ramp down 2A/min to 0 both TGHT and TBHT. 


Wednesday, July 24, 2024, 08:50: TP off.

Wednesday, July 24, 2024, 09:18: Venting.

Wednesday, July 24, 2024, 10:28: Target removed. EVAP2 clear. 

Entry  Saturday, September 07, 2024, 09:55, Darwin Ortiz Rosales, TaC, 45447-13, LP-SIS, Done, TaC coating sintering 

Saturday, September 07, 2024, 09:54

The coated container was wrapped in 4 Ta foil heatshields.

Vacuum IGP1 initial =8.1 e-07 Torr

Target temperature on OMEGA= 1850-1900 C

OMEGA slope:= 0.990

Target time at max temperature = 4 hours

Final Current TBHT= 230 A

Final TGHT current= ~400A (adjustable)

Heating ramp manually to 50A on TGHT and TBHT

Then at 1A/min  to =400 A TGHT and 230A TBHT

Good vacuum = 5.0 e-04 Torr

Bad vacuum = 5.0E-02 Torr

 

 


Saturday, September 07, 2024, 17:38

At 400 A set point on TGHT, read back is 392A and OMEGA reads 1840C.   TBHT set to 230A reads 233A.

It will be kept at this current for four hours before rampdown.

Entry  Saturday, August 26, 2023, 09:41, Darwin Ortiz Rosales, TaC, 45447-12, LP-SIS, Done, TaC coating sintering 

Saturday, August 26, 2023, 09:39

The coated container was wrapped in 4 Ta foil heatshields.

Target temperature on OMEGA= 1850-1900 C

OMEGA slope:= 0.990

Target time at max temperature = 4 hours

Final Current TBHT= 230 A

Final TGHT current= ~400A (adjustable)

Heating autoramp starged at 2A/min(1A/30s) on  TGHT  100A

Then at 4A/min  to =400 A TGHT and 230A TBHT

Good vacuum = 5.0 e-04 Torr

Bad vacuum = 5.0E-02 Torr

Initial IGP1= 8.7e-07 Torr

 


Saturday, August 26, 2023, 10:54

IGP1= 1.2e-06 Torr

Start ramp up at 4A/min on both heaters (2A/30s) until TGHT = 400A and TBHT=230A


Saturday, August 26, 2023, 11:32

Paused ramp to allow temperature to stabilize and record data

OMEGA= 1396 C

IGP1= 2.47e-06 Torr


Saturday, August 26, 2023, 11:52

Paused ramp to record data

OMEGA = 1544 C

IGP1=3.4e-06 Torr


Saturday, August 26, 2023, 12:09

Paused ramp to record data

OMEGA = 1653

IGP1 = 4.5e-06 Torr


Saturday, August 26, 2023, 12:33

Omega went up to 1878C.  Lowered the current on TGHT to reach OMEGA = 1857 C

Will keep until 430 pm

IGP1- 3.4e-06 Torr

 



Saturday, August 26, 2023, 16:10

ramping down at -2A/min tght 1A/min tbht

1837 C OMEGA

 

Entry  Friday, October 20, 2023, 07:24, Darwin Ortiz Rosales, TaC, 45447-11, LP-SIS, Done, TaC coating sintering 

Friday, October 20, 2023, 07:20

The coated container was wrapped in 4 Ta foil heatshields.

Vacuum IGP1 initial = 9.9 e-07 Torr

Target temperature on OMEGA= 1850-1900 C

OMEGA slope:= 0.990

Target time at max temperature = 4 hours

Final Current TBHT= 230 A

Final TGHT current= ~400A (adjustable)

Heating autoramp starged at 2A/min(1A/30s) on  TGHT  100A

Then at 4A/min  to =400 A TGHT and 230A TBHT

Good vacuum = 5.0 e-04 Torr

Bad vacuum = 5.0E-02 Torr

 


Friday, October 20, 2023, 07:24

Starting initial ramp

Vacuum IGP1 initial = 9.9 e-07 Torr

 


Friday, October 20, 2023, 08:55

After initial pressure bump continued heating at 1A/min to 120A to observe any other possible pressure bump.


Friday, October 20, 2023, 09:05

increased ramp to 4A/min to 400 TGHT and 230 TBHT

 


Friday, October 20, 2023, 09:35

OMEGA=1280 C

TGHT= 221.5 A, 3.24V 

TBHT=228.9, 3.9V

 


Friday, October 20, 2023, 10:22

OMEGA 1852 C at TGHT = 390A, 6.5 V ; TBHT = 232 A, 4.0 V

Will leave for 4 hours

 


Friday, October 20, 2023, 14:16

About to start rampdown

TGHT @ -2A/min

TBHT@ -1A/min

Final OMEGA = 1840 C

IGP1 = 1.83e-06 Torr

Entry  Tuesday, April 04, 2023, 12:50, Darwin Ortiz Rosales, TaC, 45447-1, HP-FEBIAD, Done, TaC coating sintering 

Tuesday, April 04, 2023, 12:48

Ta HP-FEBIAD was coated with TaC and wrapped with Ta heat-shields (3 layers + 1 inner layer around fins including center fins)

Desired temperature = 1850 C , TBHT will be set fixed at 230A (max).

Evap 2 will be pumped down over previous night

OMEGA slope= 0.990

Good vacuum = 5.00 e-4 Torr

Bad vacuum = 5.00 e-2 Torr

OMEGA target temp = 1850 C


Wednesday, April 05, 2023, 07:37

IGP1= 4.3e-07 Torr

starting autoramp @ 1A/min to 230A on both TGHT and TBHT


Wednesday, April 05, 2023, 10:56

Starting Autoramp at 4A/min to 400 A on TGHT


Wednesday, April 05, 2023, 14:14

OMEGA Reached 1877C  @ 743A, 11.3V TGHT

rampdown  @ 6:00 pm


Wednesday, April 05, 2023, 14:38

Decreased TGHT current to 736A because temperature was creeping up

rampdown was started at 6:05 pm

Final pressure at 0 V - 1.7e-07 Torr


Entry  Friday, January 26, 2024, 07:06, Darwin Ortiz Rosales, TaC, 45447-1, HP-FEBIAD, Done, TaC coating sintering 

Friday, January 26, 2024, 07:05

The coated container was wrapped in 4 Ta foil heatshield and left in evap2 over night to attain vacuum.

Target temperature on OMEGA= 1850-1900 C

OMEGA slope:= 0.990

Target time at max temperature = 4 hours

Final Current TBHT= 230 A

Final TGHT current= ~700A (adjustable)

Heating autoramp starged at 1A/min on  TGHT  and TBHT to 120A

Then at 2 A/min  to =400 A TGHT and 230A TBHT

Good vacuum = 5.0 e-04 Torr

Bad vacuum = 5.0E-02 Torr

Initial IGP1= 5.7e-05 Torr


Friday, January 26, 2024, 09:20

Pressure starts increasing at 125 A on TGHT and TBHT.  Leaving it to equilibrate then will start ramping at 3A/min (1.5A/30s) to 700A on TGHT and 230A on TBHT

 


Friday, January 26, 2024, 13:18

leave sintering at 1838C .  Will start rampdown at 5 pm.

IGP1= 6.10e-06 Torr

TGHT=680A, 10.14V

TBHT = 230A, 3.13V


Friday, January 26, 2024, 16:52

IGP1 = 3.0e10-6 Torr

OMEGA=1821 C

start rampdown @-2A/min TGHT and -1A/min TBHT

Entry  Friday, April 04, 2025, 06:55, Darwin Ortiz Rosales, SiC, 45447-1, HP-FEBIAD, Done, SiC-250402 conditioning 

Friday, April 04, 2025, 06:41

Total number of foils:328

Total length packed 15.2 cm

container has 4 Ta heat shields (one inner only around fins)

No endcaps inserted to facilitate out-gassing

Ta coated spring at back, coated cap at front with perforations

ramp to 500A @ 1A/min TGHT and to 230A on TBHT

max approx 700A on TGHT and 230A on TBHT (Omega slope set = 0.990)

Then temperature = 1800C

TBHT will be set fixed at 230 A (max).  TBHT heated manually and automatically to max.

Good vac at 5.00 e -4 Torr

Bad vac at 5.00 e-2 Torr

 IGP1= 1e-06 Torr at start of initial ramp.

initiating ramp up


 Friday, April 04, 2025, 10:54

Paused ramp at 128.5A TGHT and 130.2 A TBHT.  Will hold and let pressure drop.

IGP1 = 5.43e-04 Torr currently


Friday, April 04, 2025, 14:04

restarting ramp

IGP1=2.6e-05 Torr


Friday, April 04, 2025, 16:35

increasing ramp to 3A/min

@18:15 ramp was slowed down to 2A/min and left to reach 730~A


Friday, April 04, 2025, 22:54

Current was stopped at 733A on readback and left for 3.5 hours, then manually ramped to 738A for 0.5 hours. 

This is in accordance with the initial oven (Elog 619)


Friday, April 04, 2025, 23:45

starting ramp down at -1A/min TBHT and -2A/min TGHT

Entry  Thursday, February 23, 2023, 18:24, Darwin Ortiz Rosales, TaC, 45441-2, HP-FEBIAD, Done, TaC coating sintering WO_45441-2.png

Thursday, February 23, 2023, 18:20

Ta HP-FEBIAD was coated with TaC and wrapped with Ta heat-shields (3 layers) and 1 under layer that doesn't cover the middle section.

Desired temperature = 1800 C , TBHT will be set fixed at 230A (max).

Evap 2 will be pumped down to 5e-06 Torr range

OMEGA slope= 0.990

Good vacuum = 5.00 e-4 Torr

Bad vacuum = 5.00 e-2 Torr

IGP1=2.5 e-06 Torr

Start autoramp @1A/min to 80 A then autoramp heat @1A/min to 150 A.  Then autoramp TGHT to approx 675A and TBHT to 230A.1

 


Friday, February 24, 2023, 09:10

heated overnight @0.5 A/min to 400 A.  Then started heating at 1A/min to 600 A while taking readings for current/Temp regression.

regression so far points to 682A to get to 1800C.  Will continue taking readings and possible heat to 1850 C. 


Friday, February 24, 2023, 09:43

autoramping to 690A at 1A/min


Friday, February 24, 2023, 11:24

ramping manually to 690A from 650A


Friday, February 24, 2023, 11:32

4 hours at 330pm

TGHT 492A, 10.6V

TBHT = 230A, 3.2V

IGP1=5.11e-06 Torr

OMEGA =1840 C


Friday, February 24, 2023, 15:36

TGHT = 692A, 10.6V

TBHT = 230 A, 3.2V

OMEGA = 1835 C

IGP1= 2.4e-06 Torr

Starting rampdown at -2A/min TGHT and -1A/min TBHT

Entry  Thursday, March 16, 2023, 14:47, Darwin Ortiz Rosales, TaC, 45220-9, LP-SIS, Done, TaC coating sintering 

Thursday, March 16, 2023, 13:38

The coated container was wrapped in four Ta foil heatshields.

Target temperature on OMEGA= 1860-1900 C

OMEGA slope:= 0.990

Target time at max temperature = 4 hours

Final Current TBHT= 230A

Final TGHT current= ~400A (adjustable)

Good vacuum = 5.0 e-02 Torr

Bad vacuum = 5.0E-04 Torr


 Thursday, March 16, 2023, 22:21

Started ramping TGHT and TBHT @ 1.5A/min to 387 A and 230A respectively.

IGP1 initial = 9.6 e-07 Torr

Cooling projected at 6:48 am tomorrow. 


Friday, March 17, 2023, 06:59

Final IGP1= 1.6e-o6 Torr

Started rampdown @-2A/min TGHT and -1A/min TBHT

Coating looks good uniformely.

OMEGA 1850 C (was 1868 initially)

TGHT was 387A, 6.6 V and TBHT was 230A, 4.1 V

Coating very nice

Entry  Thursday, March 30, 2023, 12:45, Aaron Schmidt, Ta, 45220-7, LP-SIS, In progress, Conditioning Ta#65 

Thursday, March 30, 2023, 12:27: 

Ta#65 LP-SIS target description: 

Total Ta foils = 470 [6x20 packs + 350 single discs]

Foil Thickness = 0.033mm (0.0013") avg Measured. 

Target material batch: Ta 2023-1  Mt'l PO# TR-2022-03028

Target density = 18.2685 g/cm3

Target length = 3.40 cm

Total Mass = 62.113 g [Incl foils + Ta wire on 6 packs]

Total mass w/ Target oven= 460.8 g (w/ end caps)

Discs in target are arranged as follows: 1pack / 75 singles / 1pack / 100 singles / 2packs / 100 singles / 1pack / 75 singles / 1pack

Dimpling direction on foils/ Packs.                                                               --> Center <--

End caps installed (Not expanded). No Ta foil heat shield added

 

Tuesday, May 16, 2023, 10:44: End cap removed post conditioning to remove the rhenium foil. End cap replaced, & weight updated. Length remains the same.


Final desired temperature = 1900C.

Thursday, March 30, 2023, 12:41: RP on. 

Thursday, March 30, 2023, 12:42: Roughing 

Thursday, March 30, 2023, 12:44: OMEGA slope = 0.98. 

Thursday, March 30, 2023, 12:59: TP1 on. 

Thursday, March 30, 2023, 13:00: TP1 off.

Thursday, March 30, 2023, 13:03: Venting. (Steel pair of shields req'd - Install)

Thursday, March 30, 2023, 13:05: Roughing.

Thursday, March 30, 2023, 13:20: TP1 on. 

Thursday, March 30, 2023, 13:29: TP1 trip @ 38 krpm. Quick Reset. Fully "green". OK.

Thursday, March 30, 2023, 13:31: Vacuum @ 5.84e-05T. TGHT / TBHT PS on.

Thursday, March 30, 2023, 13:32: Operation Check. TGHT / TBHT tapped up to 5 / 5 A. Ok. Back to 0A. 


Friday, March 31, 2023, 06:32: Auto-ramping TGHT / TBHT to 500 / 200 A @ 2 A per minute. Vacuum @ 6.52e-07T.

Friday, March 31, 2023, 12:08: TGHT / TBHT @ 500 / 200 A. Vacuum @ 2.24e-06T. Temperature @ 1575 C. Auto-ramping TGHT / TBHT to 580 / 230 A @ 2 A per min

Friday, March 31, 2023, 13:05: TGHT / TBHT @ 580 / 230 A. Vacuum @ 3.69e-06T. Temperature @ 1748 C. Auto-ramping TGHT to 600 @ 2 A per min

Friday, March 31, 2023, 13:27: TGHT / TBHT @ 600 / 230 A. Vacuum @ 3.83e-06T. Temperature @ 1790 C. Auto-ramping TGHT to 620 @ 2 A per min

Friday, March 31, 2023, 13:42: TGHT / TBHT @ 620 / 230 A. Vacuum @ 4.34e-06T. Temperature @ 1820 C. Auto-ramping TGHT to 640 @ 2 A per min    

Friday, March 31, 2023, 13:51: TGHT / TBHT @ 640 / 230 A. Vacuum @ 5.51e-06T. Temperature @ 1858 C. Tap up TGHT to 650 A

Friday, March 31, 2023, 13:54: Vacuum @ 6.03e-06T. Temp @ 1902 C. Tapped up TGHT to 660 manually. Desired temperature reached. 

Friday, March 31, 2023, 13:57: Auto-cooling @ 2 A per minute.

Friday, March 31, 2023, 17:31:

 


Monday, April 03, 2023, 07:35: PS off. TP off. 

Entry  Friday, October 28, 2022, 07:59, Darwin Ortiz Rosales, TaC, 45220-6, LP-SIS, Done, TaC coating sintering 

Friday, October 28, 2022, 07:58

The coated container was wrapped in four Ta foil heatshields.

Target temperature on OMEGA= 1850-1900 C

OMEGA slope:= 0.990

Target time at max temperature = 4 hours

Final Current TBHT= 230A

Final TGHT current= ~420A (adjustable)

Heating autoramp starged at 4A/min on both TGHT and TBHT to 40A

Then at 1A/min on both heaters to 120A.

Good vacuum = 5.0 e-02 Torr

Bad vacuum = 5.0E-04 Torr

 IGP1 initial = 4.5e-07 Torr


Friday, October 28, 2022, 10:50

after reaching 120A and leaving until pressure drop, autoramp at 2.5A/30s (5A/min) towards 400A TGHT and 230A TBHT.


Friday, October 28, 2022, 11:22

OMEGA= 1890 @ 412A, 7.1 V on TGHT

Leaving for 4 hours

 

Entry  Wednesday, September 20, 2023, 14:26, Aaron Schmidt, Ta, 45220-5, LP-SIS, In progress, Conditioning Ta#66 

 Ta#66 LP-SIS target description: 

Total Ta foils = 470 [6x20 packs + 350 single discs]

Foil Thickness = 0.033mm (0.0013") avg Measured. 

Target material batch: Ta 2023-1  Mt'l PO# TR-2022-03028

Target density = 12.446 g/cm3

Target length = 5.0 cm

Total Mass = 62.230 g [Incl foils + Ta wire on 6 packs]

Total mass w/ Target oven=  g (w/ end caps)

Discs in target are arranged as follows: 1pack / 75 singles / 1pack / 100 singles / 2packs / 100 singles / 1pack / 75 singles / 1pack

Dimpling direction on foils/ Packs.                                                               --> Center <--

End caps installed (Not expanded). No Ta foil heat shield added


Desired temperature 1900C

Wednesday, September 20, 2023, 14:18: Roughing. 

Wednesday, September 20, 2023, 14:35: TP Started. 

Wednesday, September 20, 2023, 14:43: TP on. 

Wednesday, September 20, 2023, 14:45: TGHT / TBHT raised to 5 / 5 A & lowered. Quick check ok. 


Thursday, September 21, 2023, 07:47: Auto-ramping TGHT / TBHT to 580 / 230 A @ 2 A per min. Vacuum @ 8.30e-07T.

Thursday, September 21, 2023, 09:54: Slope set to 0.98 

Thursday, September 21, 2023, 13:42: TGHT / TBHT @ 580 / 230 A (568 / 233 A). Auto-ramping TGHT to 630 A @ 2 A per min (640 A w/ offset). Temperature @ 1748 C. Vacuum @ 2.47e-06T.

Thursday, September 21, 2023, 14:10: TGHT / TBHT @ 630 / 230 A (618 / 233 A). Auto-ramping TGHT to 650 A @ 2 A per min (640 A w/ offset). Temperature @ 1843 C. Vacuum @ 3.30e-06T.

Thursday, September 21, 2023, 14:23: TGHT / TBHT @ 650 / 230 A (638 / 233 A). Auto-ramping TGHT to 660 A @ 2 A per min (648 A w/ offset). Temperature @ 1879 C. Vacuum @ 3.77e-06T.

Thursday, September 21, 2023, 14:29: Tapped TGHT to 662.  TGHT / TBHT @ 662 / 230 A (649 / 233 A). Temperature @ 1903 C. Vacuum @ 4.08e-06T. Desired Temperature reached.

Thursday, September 21, 2023, 14:33: Auto-cooling started @ 1 A per min.



Monday, September 25, 2023, 08:09: Turbo pump off. 

Entry  Monday, November 06, 2023, 14:07, Darwin Ortiz Rosales, Empty, 45220-4, LP-SIS, Done, TaC coating sintering 

Monday, November 06, 2023, 09:59

The coated container was wrapped in 4 Ta foil heatshields.

Vacuum IGP1 initial =3.1 e-07 Torr

Target temperature on OMEGA= 1850-1900 C

OMEGA slope:= 0.990

Target time at max temperature = 4 hours

Final Current TBHT= 230 A

Final TGHT current= ~400A (adjustable)

Heating autoramp starged at 2A/min(1A/30s) on  TGHT  100A

Then at 2A/min  to =400 A TGHT and 230A TBHT

Good vacuum = 5.0 e-04 Torr

Bad vacuum = 5.0E-02 Torr

 


 Monday, November 06, 2023, 14:07

OMEGA =1852 C

IGP1= 3.14e-06 Torr

TGHT= 399A, 6.6V

TBHT= 233A, 4.1V

 


Tuesday, November 07, 2023, 12:28

Cooled down previous evening and took out today.

rampdown was @-2A/min for TGHT and -1A/min TBHT