Entry  Monday, June 05, 2023, 14:52, Aaron Schmidt, , , , , Swapped turbo pumps. 
 Previous TP would only spin up to 4KRPM. New TP installed.
Monday, June 05, 2023, 14:50: Roughing. 
Monday, June 05, 2023, 15:10: Controller reset. TP on. 
Entry  Wednesday, May 24, 2023, 15:23, Darwin Ortiz Rosales, , 44139-4, LP TUBE, Done, Graphite inside insert Experiment 1 Screenshot_Graphite_insert_Exp1.png
 
Wednesday, May 24, 2023, 15:22
A Ta container tube was wrapped with 4 Ta heatshields.  Note final container is 45220-11
Entry  Tuesday, May 02, 2023, 14:20, John Wong, np-TiO2, , TARGET BOAT, In progress, Carbonization of np-TiO2 spun fibrous pellets/fibre mats 7x
Tuesday, May 02, 2023, 14:03
Two np-TiO2 spun fibrous pellets and 1 batch of fibre mats were wrapped with graphite foils and loaded into a target boat.
Sample will be heated to 1875C, similar to the previous process, see e-log ID#605 (TGHT: 440A/7.6V).
Entry  Friday, April 28, 2023, 11:31, Darwin Ortiz Rosales, TaC, Boat, TARGET BOAT, Done, TaC coated endcaps and spring sintering 
Friday, April 28, 2023, 11:29
loaded 14 TaC coated end caps and 2 TaC coated springs.
OMEGA Slope 0.99
Entry  Wednesday, April 26, 2023, 09:48, Darwin Ortiz Rosales, TiC, 44692-5, LP-FEBIAD, Done, TiC230425 
Wednesday, April 26, 2023, 09:32
LP FEBIAD loaded with 367 TiC discs and 4 TiC removable discs for analyses
50 packs of 5 and the rest are singles
    Reply  Wednesday, April 26, 2023, 18:20, Carla Babcock, TiC, 44692-5, LP-FEBIAD, In progress, TiC230425 


    
        
            Darwin Ortiz Rosales wrote:
        
        
            
            Wednesday, April 26, 2023, 09:32
       Reply  Wednesday, April 26, 2023, 22:26, John Wong, TiC, 44692-5, LP-FEBIAD, In progress, TiC230425 Screenshot_2023-04-26_221720.jpg


    
        
            Carla Babcock wrote:
        
        
            
            
            
          Reply  Thursday, April 27, 2023, 06:30, Darwin Ortiz Rosales, TiC, 44692-5, LP-FEBIAD, Done, TiC230425 


    
        
            John Wong wrote:
        
        
            
            
            
             Reply  Thursday, April 27, 2023, 21:48, Carla Babcock, TiC, 44692-5, LP-FEBIAD, In progress, TiC230425 MicrosoftTeams-image_(36).png


    
        
            Darwin Ortiz Rosales wrote:
        
        
            
            
            
             Reply  Thursday, April 27, 2023, 22:18, John Wong, TiC, 44692-5, LP-FEBIAD, In progress, TiC230425 Screenshot_2023-04-27_204948.jpgScreenshot_2023-04-27_205012.jpgScreenshot_2023-04-27_220239.jpgScreenshot_2023-04-27_220323.jpgScreenshot_2023-04-28_010640.jpg


    
        
            Darwin Ortiz Rosales wrote:
        
        
            
            
            
                Reply  Friday, April 28, 2023, 09:39, Darwin Ortiz Rosales, TiC, 44692-5, LP-FEBIAD, Done, TiC230425 MicrosoftTeams-image_(20).png


    
        
            John Wong wrote:
        
        
            
            
            
Entry  Monday, April 24, 2023, 09:12, Darwin Ortiz Rosales, TaC, 44692-5, LP-FEBIAD, Done, TaC coating sintering 
Sunday, April 23, 2023, 07:23
The coated container was wrapped in 3 Ta foil heatshields.
Target temperature on OMEGA= 1850-1900 C
Entry  Thursday, April 20, 2023, 07:00, Darwin Ortiz Rosales, TaC, 41790-7, LP-FEBIAD, Done, TaC coating sintering 
Thursday, April 20, 2023, 06:59
The coated container was wrapped in 3 Ta foil heatshields.
Target temperature on OMEGA= 1830-1900 C
Entry  Tuesday, April 18, 2023, 06:48, Darwin Ortiz Rosales, TaC, 45220-11, LP-SIS, Done, TaC coating sintering 
Tuesday, April 18, 2023, 06:46
The coated container was wrapped in four Ta foil heatshields.
Target temperature on OMEGA= 1830-1900 C
Entry  Sunday, April 16, 2023, 14:08, Darwin Ortiz Rosales, TaC, 45220-14, LP-SIS, Done, TaC coating sintering 
Sunday, April 16, 2023, 14:08
The coated container was wrapped in four Ta foil heatshields.
Target temperature on OMEGA= 1860-1900 C
Entry  Wednesday, April 12, 2023, 09:53, Darwin Ortiz Rosales, TaC, , TARGET BOAT, Done, TaC coating sintering 

Wednesday, April 12, 2023, 09:53
The coated container was wrapped in 3 Ta foil heatshields.
Target temperature on OMEGA= 1850-1900 C
Entry  Tuesday, April 04, 2023, 12:50, Darwin Ortiz Rosales, TaC, 45447-1, HP-FEBIAD, Done, TaC coating sintering 
Tuesday, April 04, 2023, 12:48
Ta HP-FEBIAD was coated with TaC and wrapped with Ta heat-shields (3 layers + 1 inner layer
around fins including center fins)
Entry  Thursday, March 30, 2023, 12:45, Aaron Schmidt, Ta, 45220-7, LP-SIS, In progress, Conditioning Ta#65 
Thursday, March 30, 2023, 12:27: 
Ta#65 LP-SIS target description: 
Total Ta foils = 470 [6x20 packs + 350 single discs]
Entry  Thursday, March 16, 2023, 14:47, Darwin Ortiz Rosales, TaC, 45220-9, LP-SIS, Done, TaC coating sintering 
Thursday, March 16, 2023, 13:38
The coated container was wrapped in four Ta foil heatshields.
Target temperature on OMEGA= 1860-1900 C
Entry  Monday, March 13, 2023, 22:31, Darwin Ortiz Rosales, SiC, 44692-2, HP-SIS, Done, SiC-230313 
Monday, March 13, 2023, 22:28
Total number of foils:380 ( including 5 analysis discs on the front side of the container)
Total length packed 17 cm (excluding 5 analysis discs that will be removed)
Entry  Sunday, March 12, 2023, 08:06, Darwin Ortiz Rosales, Ta, 44692-2, HP-SIS, Done, TaC coating sintering 
Sunday, March 12, 2023, 08:04
Ta HP-SIS was coated with TaC and wrapped with Ta heat-shields (3 layers + 1 inner layer
around fins)
Entry  Thursday, March 09, 2023, 06:58, Darwin Ortiz Rosales, Endcaps, , TARGET BOAT, Done, TaC coated endcaps and spring sintering 
Thursday, March 09, 2023, 06:53
2 TaC coated springs and  12 Tac coated caps loaded into a target boat (in packs of 4 wrapped in graphite foil).
Target boat wrapped in 4 Ta heatshields
Entry  Monday, March 06, 2023, 21:34, Darwin Ortiz Rosales, SiC, 44692-3, HP-SIS, Done, 230306SiC conditioning 
Monday, March 06, 2023, 21:29
Total number of foils:382 ( including 5 analysis discs on the right side of the container)
Total length packed 17 cm (excluding 5 analysis discs that will be removed)
Entry  Saturday, March 04, 2023, 08:34, Darwin Ortiz Rosales, TiC, 44692-7, LP-FEBIAD, Done, TiC230301 conditioning 
Saturday, March 04, 2023, 08:29
 Ta LP-FEBIAD with 369 discs plus 5 removable discs wrapped with 3 Ta heat-shields (in
layers)
Entry  Wednesday, March 01, 2023, 21:49, Darwin Ortiz Rosales, Ta, 44692-3, HP-SIS, Done, TaC coating sintering 
Wednesday, March 01, 2023, 21:46
Ta HP-SIS was coated with TaC and wrapped with Ta heat-shields (3 layers + 1 inner layer
around fins)
Entry  Tuesday, February 28, 2023, 07:21, Darwin Ortiz Rosales, Ta, 44692-7, LP-FEBIAD, Done, TaC coating sintering 
Tuesday, February 28, 2023, 07:19
Ta LP-FEBIAD was coated with TaC and wrapped with Ta heat-shields (4 layers)
Desired temperature = 1850 C , TBHT will be set fixed at 230A (max).