Entry  Wednesday, August 10, 2022, 09:31, Ivan Bao, Empty, , TARGET BOAT, In progress, TC tests 
1st test polarity 1
10:12 am Begin pumping down to rough vacuum
12:50 pm begin ramping up towards 2000C. Ta tube only, welded thermocouple mount
Entry  Wednesday, September 14, 2022, 11:48, Darwin Ortiz Rosales, , , TARGET BOAT, Done, Grahite disc conditioning 220907G 
Wednesday, September 14, 2022, 9:30
A Ta container tube was wrapped with 3 Ta heatshields.
322 graphite discs were loaded.
Entry  Thursday, September 22, 2022, 07:15, Darwin Ortiz Rosales, TaC, , TARGET BOAT, Done, TaC coated endcaps and spring sintering 
Thursday, September 22, 2022, 07:13
Each endcap is separated with a disc of graphite foil and rolled into 3 packs of 4 within a foil
envelope in a target boat.
Entry  Tuesday, November 01, 2022, 17:35, John Wong, TiC, , TARGET BOAT, Done, Np-TiC fibres systhesis TiO2_C_fibres_carbonization_elog599.png
Tuesday, November 01, 2022, 17:24
2 samples of np-TiO2/C fibres were produced using the e-spinner.  Each sample was wrapped with a piece of graphite sheet, and then loaded
into a target container. 
Entry  Thursday, November 24, 2022, 11:08, John Wong, TiC, , TARGET BOAT, Done, Synthesis of TiC fibrous disc (TiO2/PAN only) striptool_1600C.jpgstriptool_1887C.jpg
Thursday, November 24, 2022, 11:01
Target container contains one disc of e-spun TiO2/PAN fibrous disc, (Ref sample P-134).
Sample will be heated to 1875C, similar to the previous process, see e-log ID#599.
Entry  Friday, December 16, 2022, 10:03, Darwin Ortiz Rosales, TaC, , TARGET BOAT, Done, TaC coated endcaps and spring sintering 
4 TaC coated springs and 4 Tac coated caps loaded into a target boat.
Target boat wrapped in 4 Ta heatshields
Target boat type was with endcaps at both ends.
Entry  Thursday, February 09, 2023, 09:49, Darwin Ortiz Rosales, Nb, , TARGET BOAT, Done, condition Nb samples (Phillip) 
Thursday, February 09, 2023, 09:47
Target boat with a layer of niobium foil on the bottom is used to heat up Nb samples to 1400 C for 4 hrs.
The niobium samples are wrapped in a Nb foil.
Entry  Thursday, March 09, 2023, 06:58, Darwin Ortiz Rosales, Endcaps, , TARGET BOAT, Done, TaC coated endcaps and spring sintering 
Thursday, March 09, 2023, 06:53
2 TaC coated springs and  12 Tac coated caps loaded into a target boat (in packs of 4 wrapped in graphite foil).
Target boat wrapped in 4 Ta heatshields
Entry  Wednesday, April 12, 2023, 09:53, Darwin Ortiz Rosales, TaC, , TARGET BOAT, Done, TaC coating sintering 

Wednesday, April 12, 2023, 09:53
The coated container was wrapped in 3 Ta foil heatshields.
Target temperature on OMEGA= 1850-1900 C
Entry  Tuesday, May 02, 2023, 14:20, John Wong, np-TiO2, , TARGET BOAT, In progress, Carbonization of np-TiO2 spun fibrous pellets/fibre mats 7x
Tuesday, May 02, 2023, 14:03
Two np-TiO2 spun fibrous pellets and 1 batch of fibre mats were wrapped with graphite foils and loaded into a target boat.
Sample will be heated to 1875C, similar to the previous process, see e-log ID#605 (TGHT: 440A/7.6V).
Entry  Monday, June 05, 2023, 14:52, Aaron Schmidt, , , , , Swapped turbo pumps. 
 Previous TP would only spin up to 4KRPM. New TP installed.
Monday, June 05, 2023, 14:50: Roughing. 
Monday, June 05, 2023, 15:10: Controller reset. TP on. 
Entry  Thursday, June 08, 2023, 09:29, Darwin Ortiz Rosales, TaC, , TARGET BOAT, Done, TaC coated endcaps and spring sintering (new TaC) 
Thursday, June 08, 2023, 09:28
Using smaller particle size TaC no ball mill procedure.
Loaded 2 TaC coated end caps and 1 TaC coated springs.
Entry  Monday, January 29, 2024, 16:45, Darwin Ortiz Rosales, TaC, , LP-FEBIAD, Done, TaC coating sintering 
Monday, January 29, 2024, 16:36
LP FEBIAD
wrapped in 4 Ta heatshields.
Entry  Wednesday, February 21, 2024, 06:23, Darwin Ortiz Rosales, TiC, , LP TUBE, Done, 240220TiC conditioning 
Wednesday, February 21, 2024, 06:22
Ta container tube, wrapped in 4 Ta foil heat-shields, and  loaded with 201 D shaped discs in a 12mm graphite cartridge with usable  11mm
conditioning tube WO = 44692-13
Entry  Thursday, February 29, 2024, 07:40, Darwin Ortiz Rosales, TiC, , LP TUBE, Done, 240228TiC conditioning TiC_240228_Conditioning_Temperature_vs_Current.png
Thursday, February 29, 2024, 07:40
Ta container tube, wrapped in 4 Ta foil heat-shields, and  loaded  with _________ D shaped discs in a 12mm graphite cartridge with usable  11mm
conditioning tube WO = 44692-13
Entry  Wednesday, April 03, 2024, 06:46, Darwin Ortiz Rosales, TiC, , LP TUBE, Done, 240402TiC 
Wednesday, April 03, 2024, 06:46
 
Ta container tube, wrapped in 4 Ta foil heat-shields, and  loaded   with _________ D shaped discs in a 12mm graphite cartridge with usable   11mm
Entry  Thursday, April 04, 2024, 12:07, Darwin Ortiz Rosales, TiC, , LP TUBE, Done, 240404TiC sintering/conditioning 
Thursday, April 04, 2024, 12:06
Ta container tube, wrapped in 4 Ta foil heat-shields, and  loaded    with _________ D shaped discs in a 12mm graphite cartridge with usable   
11mm
Entry  Tuesday, May 07, 2024, 06:20, Darwin Ortiz Rosales, TaC, , TARGET BOAT, Done, Sintering TaC coating on endcaps 
Tuesday, May 07, 2024, 06:16
TP was swapped on previous day (May 6th)
protective screen installed.
Entry  Monday, May 27, 2024, 07:12, Darwin Ortiz Rosales, SiC, , LP TUBE, Done, SiC (PAA dispersant experiment) 
Monday, May 27, 2024, 07:09
Small graphite cartridge was loaded with SiC discs 240523-1 and 240523-2.  Discs produced without milling using PAA as a dispersant.
The coated container tube was wrapped in four Ta foil heatshields.
Entry  Wednesday, May 29, 2024, 22:55, Darwin Ortiz Rosales, SiC, , LP TUBE, Done, Repeat of SiC experiment with mixed only casts 
Wednesday, May 29, 2024, 22:52
Small graphite cartridge was loaded with SiC discs 240523-1 and  240523-2 and 220727-2 (baseline discs).  Test Discs produced without milling
using PAA as a dispersant.