548
|
Thursday, April 15, 2021, 18:33 |
Marla Cervantes | Ta | 44139-6-SK | TARGET BOAT | Done | Carbon penetration on Ta | Thursday, April 15, 2021, 18:24
Tantalum samples were loaded in a
tantalum testing tube and installed in the |
|
|
65
|
Thursday, March 14, 2013, 12:27 |
Anders Mjos | Empty | 38481-4 | HP-FEBIAD | Done | CTL thermal test 3 (w/o CTL block) | Thursday, March 12, 2013
The CTL was removed and target heated
to 580A / 300A |
|
|
62
|
Monday, March 11, 2013, 12:23 |
Anders Mjos | Empty | 38481-4 | HP-FEBIAD | Done | CTL thermal test 2 |
|
|
|
63
|
Monday, March 11, 2013, 15:59 |
John Wong | Empty | 38481-4 | HP-FEBIAD | Done | CTL thermal test 2 |
|
|
|
60
|
Wednesday, March 06, 2013, 10:41 |
Anders Mjos | Empty | 38481-4 | HP-FEBIAD | Done | CTL thermal test | Wednesday, March 06, 2013
The Cool Transfer Line (CTL) test
target is installed for thermal tests. Drawing |
|
|
61
|
Wednesday, March 06, 2013, 17:53 |
John Wong | Empty | 38481-4 | HP-FEBIAD | Done | CTL thermal test |
|
|
|
71
|
Tuesday, April 30, 2013, 11:20 |
Anders Mjos | Empty | 38481-5 | HP-FEBIAD | Done | CTL thermal test | CTL block on T/C F/T Ch 1
Supply on Ch 3
HS Return on Ch 4 |
|
|
68
|
Friday, April 19, 2013, 15:27 |
Anders Mjos | Empty | 38481-4 | HP-FEBIAD | Done | CTL test | Target installed with 4 T/C
The target assembly is ITD0300 with
the CTL Cu cooling block slightly modified. |
|
|
69
|
Monday, April 22, 2013, 18:49 |
John Wong | Empty | 38481-4 | HP-FEBIAD | Done | CTL test |
|
|
|
70
|
Tuesday, April 23, 2013, 10:11 |
Anders Mjos | Empty | 38481-4 | HP-FEBIAD | Done | CTL test |
|
|
|
175
|
Thursday, January 22, 2015, 14:21 |
Anders Mjos | Empty | | | Problems resolved | CG1A replaced | See previous e-log entry
for details |
|
|
501
|
Saturday, August 22, 2020, 11:44 |
Marla Cervantes | | 44489-11 | | Done | C-Cartridge test#1 | Saturday, August 22, 2020, 11:41
A Ta short tube was coated with TaC
and sintered, then it was loaded with a c-cartridge |
|
|
502
|
Wednesday, August 26, 2020, 10:27 |
Marla Cervantes | | 44489-8 | | Done | C-Cartridge test #2 | Wednesday, August 26, 2020, 10:26
A Ta short tube was loaded with |
|
|
555
|
Wednesday, September 08, 2021, 12:43 |
Darwin Ortiz Rosales | | 44139-8-SK | TARGET BOAT | Done | C Conditioning | Wednesday, September 08, 2021, 12:36
297 C discs were loaded onto |
|
|
159
|
Thursday, October 02, 2014, 11:26 |
John Wong | Empty | | | Maintenance | Broken insulators | Thursday, October 02, 2014, 11:22
It was found that after the last
process, Evap#2 has broken insulators - the |
|
|
161
|
Friday, October 03, 2014, 13:02 |
Anders Mjos | Empty | | | Maintenance | Broken insulators |
|
|
|
277
|
Wednesday, February 24, 2016, 17:40 |
John Wong | Nb | | LP-SIS | Done | Bob/Tobi Nb samples | Thursday, February 25, 2016, 18:04 Wednesday,
February 24, 2016, 17:29
Heat treatment of 2 bullet-shaped |
|
|
94
|
Monday, November 04, 2013, 14:02 |
Anders Mjos | | | | Maintenance | Backing pump replaced |
|
|
|
93
|
Friday, November 01, 2013, 17:20 |
Anders Mjos | | | | Problems | Backing pump needs new filter | The source of the poor vacuum in the backing
line seems to be related to a dirty filter.
We will try to find a replacement filter |
|
|
271
|
Thursday, January 14, 2016, 11:48 |
Laura Lambert | | | | Maintenance | Backing Pump Replaced | Thursday, January 14, 2016, 11:47
Backing pump was making very loud
high pitched noises during last couple processes |
|
|