433
|
Wednesday, March 13, 2019, 15:43 |
Marla Cervantes | | 43630-6 | | Done | Graphite insert test #4 | Wednesday, March 13, 2019, 15:41
An uncoated tantalum tube was loaded
with a graphite insert (with conical caps). |
|
435
|
Monday, April 01, 2019, 16:35 |
Darwin Ortiz Rosales | | 43630-4 | | Done | TaC coating/graphite/sintering | Monday, April 01, 2019, 16:35
Container was coated with TaC and
a roll of graphite inserted inside the tube. |
|
436
|
Wednesday, April 03, 2019, 16:59 |
Marla Cervantes | TaC | 43630-5 | | Done | TaC coating/sintering for graphite insert test | Wednesday, April 03, 2019, 16:57
Tantalum tube was coated with |
|
437
|
Sunday, April 07, 2019, 08:13 |
Marla Cervantes | | 43630-5 | | Done | Graphite insert test #5 | Sunday, April 07, 2019, 08:10
A graphite insert (with conical caps)
was loaded in tantalum tube previously coated |
   |
438
|
Tuesday, April 16, 2019, 13:40 |
Aaron Schmidt | | | | | Replace bottom insert on HS | Tuesday, April 16, 2019, 13:38: Replaced
the bottom insert on the heat shield.
Used small amount of isopropyl alcohol |
|
442
|
Friday, May 10, 2019, 16:58 |
Marla Cervantes | | 43943-1 | | Done | TaC coating/sintering for graphite insert test | Friday, May 10, 2019, 16:54
A tantalum tube was coated with TaC,and
wrapped with three tantalum sheets, |
|
444
|
Tuesday, May 21, 2019, 14:34 |
Aaron Schmidt | | | | | HS swap to EVAP 2 flex line. | Tuesday, May 21, 2019, 14:33: Install
flexible line evap 2 HS. |
|
445
|
Tuesday, May 21, 2019, 18:01 |
Marla Cervantes | | 43943-1 | | Done | Graphite foil test | Tuesday, May 21, 2019, 17:57
A tantalum tube previously coated
with TaC and sintered was loaded with graphite |
|
446
|
Friday, May 24, 2019, 15:29 |
Marla Cervantes | | 43943-2 | | Done | Graphite insert test | Friday, May 24, 2019, 15:26
A graphite insert with tantalum
wires in its caps |
|
448
|
Monday, June 17, 2019, 17:03 |
Marla Cervantes | | 43943-2 | | Done | Graphite insert test | Thursday, June 6, 2019, 16:43
A graphite insert with tantalum |
|
454
|
Wednesday, August 28, 2019, 05:59 |
Marla Cervantes | | 44062-2-SK | | Done | Graphite insert test | Wednesday, August 28, 2019, 06:00
A graphite insert (with conical |
|
470
|
Monday, November 25, 2019, 11:35 |
Aaron Schmidt | | | | In progress | Flex - line HS installed | Leak noted on previous TaC sintering
on HP FEBIAD # 42464-3.
Swapped out gaskets on HS flex line |
|
475
|
Wednesday, March 04, 2020, 14:33 |
Aaron Schmidt | | | | Maintenance | PS swap out | The TGHT PS was found to be defective.
It was uninstalled w/ Joel S: |
|
481
|
Wednesday, May 20, 2020, 07:18 |
Aaron Schmidt | | | | | Check Evap 2 | Gradually open waterlines under vacuum
after period of no use.
Wednesday, May 20, 2020, 07:17: Vacuum |
|
484
|
Wednesday, May 27, 2020, 13:04 |
Marla Cervantes | | 44139-7-SK | | Done | Conditioning graphite target #2 | Wednesday, May 27, 2020, 10:22
IGP1 = 3.2e-7 Torr |
 |
489
|
Monday, July 13, 2020, 11:03 |
Aaron Schmidt | | | | | Pump down / leak / vacuum check. | Darwin reported that he was unable
to achieve vacuum of 150mTorr. The flex-line
HS had been removed last week for modifications. |
|
492
|
Saturday, July 25, 2020, 08:58 |
Darwin Ortiz Rosales | ZrC | 44139-7-SK | | In progress | ZrC for Luca's experiments | Friday, July 24, 2020, 15:00
Ta tube cotaining 497 ZrC discs |
|
494
|
Wednesday, August 05, 2020, 13:38 |
Aaron Schmidt | | | | | RP Swap on EVAP 2 | BP1 swapped with RP2 (TS beamline)
U-line installed.
Wednesday, August 05, 2020, 13:37: |
|
497
|
Wednesday, August 12, 2020, 08:58 |
Aaron Schmidt | | | | In progress | Install Flex line HS | Flex line HS installed. New SS gaskets.
Wednesday, August 12, 2020, 08:56:
Roughing (Check). |
|
500
|
Tuesday, August 18, 2020, 10:41 |
Marla Cervantes | TaC | 44489-11 | | Done | TaC coating/sintering | Thursday, August 19, 2020, 17:28
A short tantalum tube |
|
|