  Evaporator_2, Page 33 of 34  Not logged in ELOG logo
ID Date Author Target Material Target Oven W.O# Source Status Subjectdown Text Attachments
  548   Thursday, April 15, 2021, 18:33 Marla CervantesTa44139-6-SKTARGET BOATDoneCarbon penetration on TaThursday, April 15, 2021, 18:24
Tantalum samples were loaded in a
tantalum testing tube and installed in the
 Ta-samples_heating.JPG 
  65   Thursday, March 14, 2013, 12:27 Anders MjosEmpty38481-4HP-FEBIADDoneCTL thermal test 3 (w/o CTL block)Thursday, March 12, 2013 
The CTL was removed and target heated
to 580A / 300A
 2013-03-13_-_FEBIAD-HP-A_TargetLeg_and_HeatShield_TC.pdf2013-03-13_-_FEBIAD-HP-A_TargetLeg_and_HeatShield_TC.xlsx 
  62   Monday, March 11, 2013, 12:23 Anders MjosEmpty38481-4HP-FEBIADDoneCTL thermal test 2 

    
 2013-03-11_Evap2_Second_Thermal_Test.pdf 
  63   Monday, March 11, 2013, 15:59 John WongEmpty38481-4HP-FEBIADDoneCTL thermal test 2

    

       
            
 autorampingup_110.PNG 
  60   Wednesday, March 06, 2013, 10:41 Anders MjosEmpty38481-4HP-FEBIADDoneCTL thermal testWednesday, March 06, 2013
The Cool Transfer Line (CTL) test
target is installed for thermal tests. Drawing
 CTL_1st_Assebmly_Thermal_Test_Evap2.pdf2013-03-08_Evap2_First_Thermal_Test.pdf 
  61   Wednesday, March 06, 2013, 17:53 John WongEmpty38481-4HP-FEBIADDoneCTL thermal test

    

       
            
 rampingup_1.PNGrampingup_2.PNGautorampingdown_23.PNG 
  71   Tuesday, April 30, 2013, 11:20 Anders MjosEmpty38481-5HP-FEBIADDoneCTL thermal test CTL block on T/C F/T Ch 1
Supply on Ch 3
HS Return on Ch 4
 StripTool_2013-05-02.pngCTL_ITD0431_Evap2.pdf2013-04-30_Evap2_ITD0431_CTL_Thermal_Test.pdf 
  68   Friday, April 19, 2013, 15:27 Anders MjosEmpty38481-4HP-FEBIADDoneCTL testTarget installed with 4 T/C
The target assembly is ITD0300 with
the CTL Cu cooling block slightly modified.
  
  69   Monday, April 22, 2013, 18:49 John WongEmpty38481-4HP-FEBIADDoneCTL test


   
        
            
  
  70   Tuesday, April 23, 2013, 10:11 Anders MjosEmpty38481-4HP-FEBIADDoneCTL test 

    
 2013-04-23_Evap2_ITD0300_CTL_Thermal_Test.xlsxCTL_ITD0300_Evap2.pdfDeformed_Ionizer_Tube.jpg 
  175   Thursday, January 22, 2015, 14:21 Anders MjosEmpty  Problems resolvedCG1A replaced See previous e-log entry
for details
  
  501   Saturday, August 22, 2020, 11:44 Marla Cervantes 44489-11 DoneC-Cartridge test#1Saturday, August 22, 2020, 11:41
A Ta short tube was coated with TaC
and sintered, then it was loaded with a c-cartridge
  
  502   Wednesday, August 26, 2020, 10:27 Marla Cervantes 44489-8 DoneC-Cartridge test #2 Wednesday, August 26, 2020, 10:26
A Ta short tube was loaded with
  
  555   Wednesday, September 08, 2021, 12:43 Darwin Ortiz Rosales 44139-8-SKTARGET BOATDoneC Conditioning Wednesday, September 08, 2021, 12:36
297 C discs were loaded onto
  
  159   Thursday, October 02, 2014, 11:26 John WongEmpty  MaintenanceBroken insulators  Thursday, October 02, 2014, 11:22
It was found that after the last
process, Evap#2 has broken insulators - the
  
  161   Friday, October 03, 2014, 13:02 Anders MjosEmpty  MaintenanceBroken insulators

    

       
            
 NewInsulators.jpgBrokenInsulators.jpg 
  277   Wednesday, February 24, 2016, 17:40 John WongNb LP-SISDoneBob/Tobi Nb samplesThursday, February 25, 2016, 18:04 Wednesday,
February 24, 2016, 17:29
Heat treatment of 2 bullet-shaped
 Screen_Shot_2016-02-25_at_6.04.20_PM.png 
  94   Monday, November 04, 2013, 14:02 Anders Mjos   MaintenanceBacking pump replaced 

    
  
  93   Friday, November 01, 2013, 17:20 Anders Mjos   ProblemsBacking pump needs new filterThe source of the poor vacuum in the backing
line seems to be related to a dirty filter.
We will try to find a replacement filter
  
  271   Thursday, January 14, 2016, 11:48 Laura Lambert   MaintenanceBacking Pump Replaced Thursday, January 14, 2016, 11:47
Backing pump was making very loud
high pitched noises during last couple processes
  