548
|
Thursday, April 15, 2021, 18:33 |
Marla Cervantes | Ta | 44139-6-SK | TARGET BOAT | Done | Carbon penetration on Ta | Thursday, April 15, 2021, 18:24
Tantalum samples were loaded in a tantalum testing tube and installed in the EVAP2 to heat under vacuum for 3 days at 2000 degC (~500A, 4kW).
The temperature is measured with the Omega pyrometer (slope 0.98)
Some of the samples are in contact with graphite and enclosed with Ta caps, the other samples are not in contact with carbon.
The testing tube is wrapped with 3 Ta heat shields and is not TaC coated.
Thursday, April 15, 2021, 18:31
IGP1 = 4.5e-7 Torr
Good vacuum = 3e-2 Torr
Bad vacuum = 5e-2Torr
The TGHT will be ramped to 500A at 5A/min
Thursday, April 15, 2021, 20:00
Finished ramping
TGHT = 502 A, 8.22 V, Omega 2012 degC
Sunday, April 18, 2021, 20:38
After 3 days at ~2000 degC, TGHT was ramped at -2A/min to 0A |
Attachment 1: Ta-samples_heating.JPG
|
|
65
|
Thursday, March 14, 2013, 12:27 |
Anders Mjos | Empty | 38481-4 | HP-FEBIAD | Done | CTL thermal test 3 (w/o CTL block) | Thursday, March 12, 2013
The CTL was removed and target heated to 580A / 300A
T1: Left target leg close to tube
T2: Heat Shield above CTL
T3: Heat Shield cooling water Supply
T4: Heat Shield cooling water Return
Thursday, March 13, 2013
The target was cooled down
Results attached as PDF and Excel |
Attachment 1: 2013-03-13_-_FEBIAD-HP-A_TargetLeg_and_HeatShield_TC.pdf
|
|
Attachment 2: 2013-03-13_-_FEBIAD-HP-A_TargetLeg_and_HeatShield_TC.xlsx
|
62
|
Monday, March 11, 2013, 12:23 |
Anders Mjos | Empty | 38481-4 | HP-FEBIAD | Done | CTL thermal test 2 |
Anders Mjos wrote: |
Wednesday, March 06, 2013
The Cool Transfer Line (CTL) test target is installed for thermal tests. Drawing number is ITD0431 REV A.
Thermocouple channels are as follows:
T1: Cu block on CTL
T2: Heat Shield above CTL
T3: Heat Shield cooling water Supply
T4: Heat Shield cooling water Return
Cooling water is in Evap2 supplied to the cooling line that goes directly to the area on the Heat Shield above the CTL.
|
Monday, March 11, 2013
The CTL test target was installed again for a second thermal test. CTL block fastened to HS with 1 in lbs. A small piece of Ta-foil of 0.001" thickness was used between the CTL Cu-block and the Ta transfer line to reduce the heat transfer..
Thermocouples were re-attached to CTL and Heat Shield (see above for channels #s).
See attached graph (PDF) for details. |
Attachment 1: 2013-03-11_Evap2_Second_Thermal_Test.pdf
|
|
63
|
Monday, March 11, 2013, 15:59 |
John Wong | Empty | 38481-4 | HP-FEBIAD | Done | CTL thermal test 2 |
Anders Mjos wrote: |
Anders Mjos wrote: |
Wednesday, March 06, 2013
The Cool Transfer Line (CTL) test target is installed for thermal tests. Drawing number is ITD0431 REV A.
Thermocouple channels are as follows:
T1: Cu block on CTL
T2: Heat Shield above CTL
T3: Heat Shield cooling water Supply
T4: Heat Shield cooling water Return
Cooling water is in Evap2 supplied to the cooling line that goes directly to the area on the Heat Shield above the CTL.
|
Monday, March 11, 2013
The CTL test target was installed again for a second thermal test. CTL block fastened to HS with 1 in lbs. A small piece of Ta-foil of 0.001" thickness was used between the CTL Cu-block and the Ta transfer line to reduce the heat transfer..
Thermocouples were re-attached to CTL and Heat Shield (see above for channels #s).
|
Monday, March 11, 2013, 15:55
Chamber was pumped down to 2 e-7 Torr. HS water valve opened and no leaks were detected.
TGHT and TBHT are ramping up to 850A and 300A at 2A/min, respectively.
RGA is running...
Tuesday, March 12, 2013, 10:44
TGHT/TBHT reached to max currents.
See attachment #1 for temperature and RGA measurements.
Cooling down in process... 5A/min.
|
Attachment 1: autorampingup_110.PNG
|
|
60
|
Wednesday, March 06, 2013, 10:41 |
Anders Mjos | Empty | 38481-4 | HP-FEBIAD | Done | CTL thermal test | Wednesday, March 06, 2013
The Cool Transfer Line (CTL) test target is installed for thermal tests. Drawing number is ITD0431 REV A.
Thermocouple channels are as follows:
T1: Cu block on CTL
T2: Heat Shield above CTL
T3: Heat Shield cooling water Supply
T4: Heat Shield cooling water Return
Cooling water is in Evap2 supplied to the cooling line that goes directly to the area on the Heat Shield above the CTL.
Test results attached.
|
Attachment 1: CTL_1st_Assebmly_Thermal_Test_Evap2.pdf
|
|
Attachment 2: 2013-03-08_Evap2_First_Thermal_Test.pdf
|
|
61
|
Wednesday, March 06, 2013, 17:53 |
John Wong | Empty | 38481-4 | HP-FEBIAD | Done | CTL thermal test |
Anders Mjos wrote: |
Wednesday, March 06, 2013
The Cool Transfer Line (CTL) test target is installed for thermal tests. Drawing number is ITD0431 REV A.
Thermocouple channels are as follows:
T1: Cu block on CTL
T2: Heat Shield above CTL
T3: Heat Shield cooling water Supply
T4: Heat Shield cooling water Return
Cooling water is in Evap2 supplied to the cooling line that goes directly to the area on the Heat Shield above the CTL.
|
Wednesday, March 06, 2013, 17:23
The target has been pumping down to 5.3 e-7 Torr. On the RGA mass scan, mainly H2O (mass 18 + constituents) was detected at ~2.7pA (see attachment #1).
The target will be heated up: TGHT = 850A (rate @ 1A/min); TBHT = 300A (rate @ 1A/min).
Thursday, March 07, 2013, 11:51
TGHT and TBHT reached to 850A (local, 845A\13.80V) and 300A, respectively. The out gassing of CO (mass 28) reached to ~5pA at the max currents. (see attachment #2)
TBHT will be ramped down to 0A to compare the temperatures.
Thursday, March 07, 2013, 15:55
TBHT at 0A. See attachment#3 for the temperatures and RGA data before further ramping down the TGHT.
|
Attachment 1: rampingup_1.PNG
|
|
Attachment 2: rampingup_2.PNG
|
|
Attachment 3: autorampingdown_23.PNG
|
|
71
|
Tuesday, April 30, 2013, 11:20 |
Anders Mjos | Empty | 38481-5 | HP-FEBIAD | Done | CTL thermal test | CTL block on T/C F/T Ch 1
Supply on Ch 3
HS Return on Ch 4
Tuesday, April 30, 2013, 11:20: Roughing
Tuesday, April 30, 2013, 11:45: Turbo started
Wednesday, May 01, 2013, 08:43: Cooling water opened. Vacuum stable at 5.1E-7 T (IGP1)
Wednesday, May 01, 2013, 08:48: Ramping TGHT and TBHT to 850A and 300A at 1A/60s
Thursday, May 02, 2013, 09:10: TGHT reached voltage limit (12V) at ~780A yesterday at ~10pm. Increased limit to 12.5V and continued auto ramping. CTL block temp ~80C
Thursday, May 02, 2013, 10:08: TGHT voltage limit changed to 13V. TGHT:RDCUR goes to ~810A with TGHT:RDVOL at 12.5V. CTL block temp ~80C
Thursday, May 02, 2013, 11:33: TGHT manually stepped to 850A RDCUR at 846A, RDVOL at 13.1V. CTL block temp ~84C
Thursday, May 02, 2013, 15:13: Ramping down TGHT and TBHT to 580A and 280A at 2A/min and 1A/min
Friday, May 03, 2013, 08:30: TGHT and TBHT at 580A and 280A. CTL block temp ~60C
Friday, May 03, 2013, 08:37: Ramping down TGHT and TBHT to 0 at 2/min and 1A/min
Friday, May 03, 2013, 11:04: T/C logger removed
Monday, May 06, 2013, 09:37: Turbo stopped.
Monday, May 06, 2013, 10:26: Venting |
Attachment 1: StripTool_2013-05-02.png
|
|
Attachment 2: CTL_ITD0431_Evap2.pdf
|
|
Attachment 3: 2013-04-30_Evap2_ITD0431_CTL_Thermal_Test.pdf
|
|
68
|
Friday, April 19, 2013, 15:27 |
Anders Mjos | Empty | 38481-4 | HP-FEBIAD | Done | CTL test | Target installed with 4 T/C
The target assembly is ITD0300 with the CTL Cu cooling block slightly modified.
Ch1 - CTL cooling block T/C feedtrough
Ch2 - Heat shield below left gripper arm - T/C feedthrough
Ch3 - Heat shield below left gripper arm - 9 pin connector
Ch4 - Target left side leg on tube - 9 pin connector
Friday, April 19, 2013, 15:23: Roughing
Friday, April 19, 2013, 15:41: Started turbo
Monday, April 22, 2013, 09:43: Opened water supply. Vacuum stable at 2.8E-7 T (IGP1) |
69
|
Monday, April 22, 2013, 18:49 |
John Wong | Empty | 38481-4 | HP-FEBIAD | Done | CTL test |
Anders Mjos wrote: |
Target installed with 4 T/C
The target assembly is ITD0300 with the CTL Cu cooling block slightly modified.
Ch1 - CTL cooling block T/C feedtrough
Ch2 - Heat shield below left gripper arm - T/C feedthrough
Ch3 - Heat shield below left gripper arm - 9 pin connector
Ch4 - Target left side leg on tube - 9 pin connector
Friday, April 19, 2013, 15:23: Roughing
Friday, April 19, 2013, 15:41: Started turbo
Monday, April 22, 2013, 09:43: Opened water supply. Vacuum stable at 2.8E-7 T (IGP1)
|
Monday, April 22, 2013, 18:48
Ramping TGHT/TBHT to 850A/300A at 1A/min.
|
70
|
Tuesday, April 23, 2013, 10:11 |
Anders Mjos | Empty | 38481-4 | HP-FEBIAD | Done | CTL test |
John Wong wrote: |
Anders Mjos wrote: |
Target installed with 4 T/C
The target assembly is ITD0300 with the CTL Cu cooling block slightly modified.
Ch1 - CTL cooling block T/C feedtrough
Ch2 - Heat shield below left gripper arm - T/C feedthrough
Ch3 - Heat shield below left gripper arm - 9 pin connector
Ch4 - Target left side leg on tube - 9 pin connector
Friday, April 19, 2013, 15:23: Roughing
Friday, April 19, 2013, 15:41: Started turbo
Monday, April 22, 2013, 09:43: Opened water supply. Vacuum stable at 2.8E-7 T (IGP1)
|
Monday, April 22, 2013, 18:48
Ramping TGHT/TBHT to 850A/300A at 1A/min.
|
Tuesd ay, April 23, 2013, 10:07
TBHT / TGHT: 820A / 300A
TGHT:RDCUR: 816.6A
TBHT:RDCRU: 303.5A
Local P/S displays
TGHT: 821A / 11.05V
TBHT: 307A / 4.37V
Tuesday, April 23, 2013, 10:45: Ramping down TBHT to 0A @ 5A/min
Tuesday, April 23, 2013, 12:49: Ramping down TGHT to 0A @ 5A/min
Tuesday, April 23, 2013, 15:52: Swithced off TGHT and TBHT P/S. TGHT P/S showed 30A read back value, while local value was 0A
Wednesday, April 24, 2013, 09:53: Turbo stopped
Wednesday, April 24, 2013, 12:00: Target removed
The ionizer tube was found to have deformed as seen in the attached photo. |
Attachment 1: 2013-04-23_Evap2_ITD0300_CTL_Thermal_Test.xlsx
|
Attachment 2: CTL_ITD0300_Evap2.pdf
|
|
Attachment 3: Deformed_Ionizer_Tube.jpg
|
|
175
|
Thursday, January 22, 2015, 14:21 |
Anders Mjos | Empty | | | Problems resolved | CG1A replaced | See previous e-log entry for details |
501
|
Saturday, August 22, 2020, 11:44 |
Marla Cervantes | | 44489-11 | | Done | C-Cartridge test#1 | Saturday, August 22, 2020, 11:41
A Ta short tube was coated with TaC and sintered, then it was loaded with a c-cartridge
Now is currently under vacuum and it will be heated to 2000 °C during 3 days
Saturday, August 22, 2020, 11:43
Good vacuum = 3e-2 Torr
Bad vacuum = 5e-2Torr
IGP1 = 3.08e-7 Torr
Autoram set to 10A/30 s to 200 A
Saturday, August 22, 2020, 11:59
Good vacuum = 3e-2 Torr
Bad vacuum = 5e-2Torr
TGHT = 2.36 V, 200.1 A
IGP1 =2.46e-6 Torr
Autoramp set to to 300 A at 5A/30s
Saturday, August 22, 2020, 13:03
TGHT = 7.32 V, 495.3 A
IGP1 = 2.7e-6 Torr
Omega = 2016 °C
AP = 1970.1 °C
Autoramp set to 550 A at 5A/30s
Saturday, August 22, 2020, 13:11
TGHT =7.6 V, 523.2 A
IGP1 = 3.2e-6 Torr
Omega = 2077 °C
Monday, August 24, 2020, 07:59
Voltage increased ~0.2 V while current remained the same indicating an increment in resistance, temperature increment increased accordingly
TGHT = 7.815 V, 520.87 A
Omega = 2126 °C
Monday, August 24, 2020, 08:04
The current was reduced 0.1 A to 519.9
Monday, August 24, 2020, 08:55 Omega = 2112 °C
Monday, August 24, 2020, 09:12
The temperature returned to Omega = 2130 °C
The current was reduced 0.1 A to 519.8
Monday, August 24, 2020, 09:56
TGHT = 7.7 V, 518.3 A
Omega = 2132 °C
Monday, August 24, 2020, 09:59
The current was reduced 0.2 A to 519.6 A
TGHT = 7.7 V, 517.3 A
Monday, August 24, 2020, 10:07 Omega = 2130°C
Monday, August 24, 2020, 10:08
The current was reduced 0.4 A to 519.2 A
TGHT = 7.7 V, 513.5 A
Monday, August 24, 2020, 10:13 Omega = 2129°C
Monday, August 24, 2020, 10:21
Voltage dropped to 7.6 V and temperature reduced to 2105 °C
Monday, August 24, 2020, 10:30
Voltage increased to 7.8 V and temperature increased to 2128 °C
Monday, August 24, 2020, 10:33
The current was reduced 0.4 A to 518.6 A
TGHT = 7.7 V, 513.06 A
Monday, August 24, 2020, 10:38 Omega = 2130 °C
Monday, August 24, 2020, 10:41
The current was reduced 0.4 A to 518.2 A
Monday, August 24, 2020, 10:52 Omega = 2134 °C
Monday, August 24, 2020, 11:13
The current was reduced 0.4 A to 517.8 A
Monday, August 24, 2020, 11:19 Omega = 2128 °C
Monday, August 24, 2020, 11:19
The current was reduced 0.4 A to 517.4 A
Monday, August 24, 2020, 11:22 Omega = 2126
Monday, August 24, 2020, 11:22
The current was reduced 0.4 A to 517.0 A
Monday, August 24, 2020, 11:25 Omega = 2123 °C
Monday, August 24, 2020, 11:26
The current was reduced 0.4 A to 516.6 A
Monday, August 24, 2020, 11:30 Omega = 2109 °C
Monday, August 24, 2020, 11:30
The current was reduced 0.4 A to 516.2 A
Monday, August 24, 2020, 11:36 Omega = 2100 °C
Monday, August 24, 2020, 11:37
The current was reduced 0.4 A to 516.0 A
TGTH = 7.5 V, 512.9 A
Omega = 2095 °C
Monday, August 24, 2020, 14:17
Voltage dropped and later on increased
TGHT = 7.7 V, 517.5 A
Omega = 2120 °C
Monday, August 24, 2020, 14:18
The current was reduced 0.4 A to 515.6 A
TGHT = 7.6 V, 509.4 A
Monday, August 24, 2020, 14:20 Omega = 2125 °C
Monday, August 24, 2020, 14:20
The current was reduced 0.4 A to 515.2 A
Monday, August 24, 2020, 14:22 Omega = 2122 °C
Monday, August 24, 2020, 14:22
The current was reduced 0.4 A to 514.8 A
Monday, August 24, 2020, 14:29 Omega = 2116 °C
Monday, August 24, 2020, 15:27
The voltage dropped as well as the temperature
TGHT = 7.5 V, 512.5 A
Monday, August 24, 2020, 15:28 Omega = 2095 °C
Monday, August 24, 2020, 22:06
TGHT = 7.6 V, 515.9 A
Omega = 2105 °C
Tuesday, August 25, 2020, 09:07
TGHT = 7.6 V, 519.13 A
Omega = 2102 °C
Tuesday, August 25, 2020, 13:02
TGHT = 7.6 V, 518.0 A
Omega = 2116 °C
IGP1 = 3e-7 Torr
Tuesday, August 25, 2020, 13:04
Starting ramp down to 0 A at 5 A/min |
502
|
Wednesday, August 26, 2020, 10:27 |
Marla Cervantes | | 44489-8 | | Done | C-Cartridge test #2 | Wednesday, August 26, 2020, 10:26
A Ta short tube was loaded with a C-cartridge
Currently, the tube is under vacuum and it will be heated to 2000 °C during 3 days.
IGP1 = 3.2e-7 Torr
Wednesday, August 26, 2020, 16:15
IGP1 = 2.5e-7 Torr
Good vacuum = 3e-2 Torr
Bad vacuum = 5e-2Torr
Autoram set to 200A at 10A/30 s
Wednesday, August 26, 2020, 17:05
TGHT = 3.9 V, 301.3 A
IGP1 = 5.4e-7 torr
Omega = 1378 °C
AP (slope 0.9) = 1441.8 °C
Wednesday, August 26, 2020, 17:20
Autoramp set to 550 A at 5A/30s
Wednesday, August 26, 2020, 23:43
TGHT = 7.561 V, 504.9 A
Omega = 2124 °C
AP = 2010.5 °C
Thursday, August 27, 2020, 07:15
TGHT = 7.461 V, 510.2 A
Omega = 2103 °C
Thursday, August 27, 2020, 13:41
TGHT = 7.5 V, 510.8 A
Omega = 2099 °C
Friday, August 28, 2020, 09:24
TGHT = 7.4 V, 513.9 A
Omega = 2103 °C
Friday, August 28, 2020, 13:12
TGHT = 7.46 V, 505.6 A
IGP1 = 2.7e-7 Torr
Omega = 2103 °C
Saturday, August 29, 2020, 14:18
IGP1 = 2.5e-7 Torr
TGHT = 7.5 V, 510.8 A
Omega = 2109 °C
Saturday, August 29, 2020, 17:44
IGP1 = 2.4e-7 Torr
TGHT = 7.5 V, 505.2 A
Omega = 2119 °C
Saturday, August 29, 2020, 17:51
Starting ramp down to 0 A at 5 A/min |
555
|
Wednesday, September 08, 2021, 12:43 |
Darwin Ortiz Rosales | | 44139-8-SK | TARGET BOAT | Done | C Conditioning | Wednesday, September 08, 2021, 12:36
297 C discs were loaded onto a Ta tube wrapped in 3 Ta heatshields. (10 of which are analysis discs). They should be the first to be pushed out as they were loaded last.
The discs were loaded upside down to facilitate transfer to final container post conditioning.
a Ta foil disc was placed at the front end and a Ta spring at the back end of the tube.
The weight of the whole system is 254.4 g
Evap 2 was left to reduce pressure overnight.
Target temperature is 2000 C for five hours @ approx 450A
Good vacuum = 3e-2 Torr
Bad vacumm= 5e-2 Torr
Thursday, September 09, 2021, 08:46IGP1= 7.5 e-07 Torr
Will manually ramp up TGHT to 80 A
Thursday, September 09, 2021, 09:09
pressure began to rise at 50A so will leave at 50 A waiting for stabilization.
Current began to shoot up to rapidly, lowered current to 40A.
Thursday, September 09, 2021, 10:34
At IGP1= 1.3e-4 Torr manually increasing current again
Thursday, September 09, 2021, 12:52
IGP1= 8.6e-5 and dropping
TGHT = 60A, 0.87 V
Will begin autoramp to 120A at 1A/min
Thursday, September 09, 2021, 14:06
IGP1= 3.2e-05Torr
TGH T= 120A, 1.9V
Set autoramp to 1A/10s to 200A
Thursday, September 09, 2021, 14:57
IGP1= 1.5e-05 Torr
TGHT = 200A, 3.4V
Set Autoram to 2A/10s to 450A
OMEGA = 1249 C
At 258A OMEGA = 1420 C
continue ramp up at 2A/10s to 450
projected 2000 C is 454 A
Thursday, September 09, 2021, 16:10
Tapped up to 470 A and OMEGA 1993C. Will leave at this current because T may rise.
Thursday, September 09, 2021, 21:21
OMEGA 2011 C
IGP1 = 6.9e-06 Torr
Ramping down @ -1 A/min
Thursday, September 09, 2021, 17:27
Temperature kept around 2000 C by reducing current. It was reduced to 455A and Temperature stabilized . Time of ramp down will be 21:10 |
159
|
Thursday, October 02, 2014, 11:26 |
John Wong | Empty | | | Maintenance | Broken insulators | Thursday, October 02, 2014, 11:22
It was found that after the last process, Evap#2 has broken insulators - the cylinder insulator that supports the target centre legs and the block insulator that supports the terminals.
Informed Anders/Rick.
|
161
|
Friday, October 03, 2014, 13:02 |
Anders Mjos | Empty | | | Maintenance | Broken insulators |
John Wong wrote: |
Thursday, October 02, 2014, 11:22
It was found that after the last process, Evap#2 has broken insulators - the cylinder insulator that supports the target centre legs and the block insulator that supports the terminals.
Informed Anders/Rick.
|
Friday, October 03, 2014
- Insulators replaced. Torque 55 in lbs on all fasteners.
- Cleaned TGHT terminals with scotch-brite and methanol.
- New (clean) heat shield prepared WO-39230-2.
- Re-installed right side heat shield alignment pin (previously removed to allow line of sight to the target).
|
Attachment 1: NewInsulators.jpg
|
|
Attachment 2: BrokenInsulators.jpg
|
|
277
|
Wednesday, February 24, 2016, 17:40 |
John Wong | Nb | | LP-SIS | Done | Bob/Tobi Nb samples | Thursday, February 25, 2016, 18:04 Wednesday, February 24, 2016, 17:29
Heat treatment of 2 bullet-shaped Nb samples in a LP-SIS container; it is just that we don't have a target boat.
Container is wrapped with 12" in total length. A strip of Nb foil is used as an underlayer for the samples to sit on top.
Chamber has been pumped down and current vacuum at 1e-6 Torr.
HS water check - good.
Target temperature 1400C
Ramping up to 250A; this should get to ~1300C. Will let it heat for over night and step up to 1400C tomorrow.
Wednesday, February 24, 2016, 17:59
I'm stopping the heating process because the camera is not working. I can't monitor the temperature. Tried to fit the camera; don't now why it fails to connect to the server.
Will look in to it tomorrow...
Thursday, February 25, 2016, 08:17
Initiated auto ramping TGHT at 2A/min.
Thursday, February 25, 2016, 17:33
Finally the camera is fixed.
Current temperature is at 1126C, TGHT at 250A. Will step up to reach 1400C.
Thursday, February 25, 2016, 18:04
TGHT stepped up to 335A to reach 1400C. (see attachment)
Will heat this for few hours and cool it at around 11pm tonight.
Thursday, February 25, 2016, 22:19
Samples have been heated over 4.5 hours.
Initiated cool down at 1A/min.
Friday, February 26, 2016, 15:43
done! all good.
|
Attachment 1: Screen_Shot_2016-02-25_at_6.04.20_PM.png
|
|
94
|
Monday, November 04, 2013, 14:02 |
Anders Mjos | | | | Maintenance | Backing pump replaced |
Anders Mjos wrote: |
The source of the poor vacuum in the backing line seems to be related to a dirty filter. We will try to find a replacement filter next week.
The problem seem to have started September 17th, when backing preassure CG1A went from 40 mTorr to 130 mTorr. CG1B remained around 30 mTorr.
|
With the help of Anthony Ip from vacuum group, the problem was diagnosed to be the roughing pump itself. The pump was replaced and pumping improved. The chamber can now be evacuated and turbo ready to start in less than 10 minutes.
The filter is not stocked by vacuum group and could not be replaced.
Last week parts of the roughing line was cleaned by Rick. The PVC roughing line has been replaced with a SST bellows. The SST bellows is KF25 and should be replaced by a KF40 bellows in the long run. |
93
|
Friday, November 01, 2013, 17:20 |
Anders Mjos | | | | Problems | Backing pump needs new filter | The source of the poor vacuum in the backing line seems to be related to a dirty filter. We will try to find a replacement filter next week.
The problem seem to have started September 17th, when backing preassure CG1A went from 40 mTorr to 130 mTorr. CG1B remained around 30 mTorr. |
271
|
Thursday, January 14, 2016, 11:48 |
Laura Lambert | | | | Maintenance | Backing Pump Replaced | Thursday, January 14, 2016, 11:47
Backing pump was making very loud high pitched noises during last couple processes in the evaporator.
Replaced with a new one this morning.
|
|