  669   Thursday, August 08, 2024, 11:17 Marla CervantesC44139-5 SKLP TUBEDoneGraphite foils conditioning

Aaron Schmidt wrote:

Wednesday, August 07, 2024, 15:36: Roughing. Had initially been roughed & TP started w/ Marla CS, however it timed out. Restarting.

Wednesday, August 07, 2024, 15:37: TP on.

Wednesday, August 07, 2024, 15:46: Tripped at 4 KRPM. Restarted. Up to 5 KRPM.

Failed to start.


Thursday, August 08, 2024, 10:00: TP started. 

Thursday, August 08, 2024, 10:12: TP Tripped but nearly spun up. Reset & Restarted. TP Green / on.


Thursday, August 08, 2024, 10:43

A cartridge was filled with graphite foils and loaded in an uncoated tantalum tube. The tube was wrapped with four Ta-sheets. A Ta-foil was placed in the tube's right end for measuring the temperature.

Green graphite target characteristics
Number of discs 822
Mass of discs 11.74 g
Mass of loaded cartridge with normal cap and hole-cap 31.1290 g
Mass of tube loaded, w/shields and tantalum cap 250 g

 

Note: A cartridge loaded with graphite foils has not been conditioned before. Thus, there is no reference on what current to use to reach 2000 °C.

The conditioning of a graphite composite target will be used as a reference, but note that the graphite foils are not expected to outgas as the composites since the foils do not contain binders and plasticizers. 

 

Reference: Elog 636  Graphite inside insert Experiment 2 (regular formulation discs)  

 

Initial ramps used in elog 636: 

  • 1A/min to 200A 

  • 0.5A/min while taking temperature readings periodically until 250A 

  • At 250 A will let pressure stabilize and then ramp at 1A/min to 2000C or 480A

  •  

Currently waiting for vacuum to reduce to IGP1= 8.2e-07


Thursday, August 08, 2024, 11:23

 

Slope: 0.98 (same as slope used for tantalum targets since temperature is measured on Ta foil) 


 Friday, August 09, 2024, 08:50

Good vacuum 3e-5 Torr

Bad vacuum 5e-5 Torr

Initial IGP1 = 5.06E-7 Torr

Starting ramp at 1A/min to 200 A


Friday, August 09, 2024, 09:40 Pressure started to rise, but temperature is not within pyrometer range yet. Current 42 A, Voltage 0.5 V

Friday, August 09, 2024, 10:46 Pressure started to reduce (peak 1.4e-5 Torr). Temperature is not within pyrometer range yet Current 100 A, Voltage 1.3 V

Friday, August 09, 2024, 11:28 Temperature started to be detected, but not stable enough. Current 135 A, Voltage 1.9 V

Friday, August 09, 2024, 12:54 Temperature 1129 °C, current 196 A, voltage 3 V.


Friday, August 09, 2024, 12:56

Next ramp 0.5A/min while taking temperature readings periodically until 250A


Friday, August 09, 2024, 14:45

IGP1 = 1.0e-6 Torr

Next ramp 1A/min to 480 A aiming at 2000 °C


Friday, August 09, 2024, 17:13

IGP1 = 1.9e-6 Torr, Current 327A, Voltage 5.3V

Ramp changed to 2A/min to 480 A aiming at 2000 °C


Coolded down after 4 hours at ~2000°C

at -2A/min

Attachment 1: GraphiteFoil-Conditioning-EVAP2.JPG
GraphiteFoil-Conditioning-EVAP2.JPG
  674   Friday, August 30, 2024, 11:33 Darwin Ortiz RosalesTaC45447-8LP-IG-LISDoneTaC coating sintering

Friday, August 30, 2024, 11:31

The coated container was wrapped in 4 Ta foil heatshields.

Vacuum IGP1 initial =3.1 e-07 Torr

Target temperature on OMEGA= 1850-1900 C

OMEGA slope:= 0.990

Target time at max temperature = 4 hours

Final Current TBHT= 230 A

Final TGHT current= ~400A (adjustable)

Heating autoramp starged at 1A/min on  TGHT  100A and TBHT

Then at 1A/min  to =400 A TGHT and 230A TBHT

Good vacuum = 5.0 e-04 Torr

Bad vacuum = 5.0E-02 Torr

note: Left TBHT hole is off from center by a good margin

 



Sunday, September 01, 2024, 07:32

Starting initial ramp at 1A/min to 50A



Sunday, September 01, 2024, 15:20

have ramped ;up at 1A/min on both TGHT and TBHT but had two issues.

1) Set current and readback current have discrepancies but the TBHT discrepancy is significant (TBHT Set at 188 while RD is 231.9 A @ 1.9V)

   TGHT also has odd behavior with set point 405 giving 392A RD and 0.067V.  Will hold until 430pm before starting ramp down


Sunday, September 01, 2024, 16:30

Started rampdown at -2A/min TGHT and -1A/min TBHT

Note: OMEGA not able to give any reasonable readings


Tuesday, September 03, 2024, 13:51

After troubleshooting EVAP2 it was found that a copper line was touching the metal encasement grid most likely resulting in a short.  A short was seeing and it disappeared after moving the copper line away from the grid.  

Upon restarting on epics the PS went to maximum current and it was shut off after 30seconds to a minute.  The system was checked again by Arthur and TGHT was manually increased to 5A and then set to Zero again.  Arthur thinks that the PS probably requires this step after switching from local controls to remote.  Will start the sintering again as the container is coated but not sintered.


Tuesday, September 03, 2024, 14:03

ramping at 1A/min on both TGHT and TBHT to 90A. 


Tuesday, September 03, 2024, 22:25  

Started rampdown at -2A/min TGHT and -1A/min TBHT.  HIgh temperature from OMEGA was 1825 C at 430A readback on TGHT. 

  675   Saturday, September 07, 2024, 09:55 Darwin Ortiz RosalesTaC45447-13LP-SISDoneTaC coating sintering

Saturday, September 07, 2024, 09:54

The coated container was wrapped in 4 Ta foil heatshields.

Vacuum IGP1 initial =8.1 e-07 Torr

Target temperature on OMEGA= 1850-1900 C

OMEGA slope:= 0.990

Target time at max temperature = 4 hours

Final Current TBHT= 230 A

Final TGHT current= ~400A (adjustable)

Heating ramp manually to 50A on TGHT and TBHT

Then at 1A/min  to =400 A TGHT and 230A TBHT

Good vacuum = 5.0 e-04 Torr

Bad vacuum = 5.0E-02 Torr

 

 


Saturday, September 07, 2024, 17:38

At 400 A set point on TGHT, read back is 392A and OMEGA reads 1840C.   TBHT set to 230A reads 233A.

It will be kept at this current for four hours before rampdown.

  676   Monday, September 09, 2024, 19:08 Darwin Ortiz RosalesTaC LP-SISDoneTaC coating sintering LP-SIS with gas line

Monday, September 09, 2024, 19:06

The coated container was wrapped in 4 Ta foil heatshields.

Vacuum IGP1 initial =2.6 e-06 Torr

Target temperature on OMEGA= 1800-1900 C

OMEGA slope:= 0.990

Target time at max temperature = 4 hours

Final Current TBHT= 230 A

Final TGHT current= ~400A (adjustable)

Heating autoramp starged at 1A/min on  TGHT   and TBHT until outgassin peak passed

Then at 1A/min  to =400 A TGHT and 230A TBHT

Good vacuum = 5.0 e-04 Torr

Bad vacuum = 5.0E-02 Torr


Monday, September 09, 2024, 19:08

Peak passed around 70A will continue ramp up at 1A/min to 400A on TGHT and 230A TBHT


Tuesday, September 10, 2024, 13:13

Was ramped down at -2 A/min TGHT and -1 A/min TBHT

 

  677   Tuesday, September 10, 2024, 13:16 Darwin Ortiz RosalesEndcaps TARGET BOATDoneTaC coating sintering

A boat lined up with graphite and wrapped in 3 Ta heatshileds

Vacuum IGP1 initial =6.1 e-06 Torr

Target temperature on OMEGA= 1800-1900 C

OMEGA slope:= 0.990

Target time at max temperature = 4 hours

Final TGHT current= ~400A (adjustable)

Heating autoramp started semi-manually on  TGHT  to 65A and then at continue to 100A

After peak heat at 1A/min  to =400 A TGHT

Good vacuum = 5.0 e-04 Torr

Bad vacuum = 5.0E-02 Torr


Tuesday, September 10, 2024, 22:22

1810C OMEGA at 439A TGHT readback

  678   Wednesday, October 02, 2024, 19:24 Darwin Ortiz RosalesTiC LP TUBEDonesintering TiC Experiment

Wednesday, October 02, 2024, 19:21

Ta endcup at front end of container

End-caps on the graphite cartridge have holes for outgassing. 

initial heating @ 2A/min to 85 A then 2A/min to 120A TGHT.  Allow pressure to drop and then ramp to 400 A at 2A/min, leave 4 hours and start ramp down.

OMEGA slope = 0.99

Vacuum limits up to 400A: 5.0e-04 Torr -- 1.0e-02 Torr

Max current~400A (1900 C)

 


Wednesday, October 02, 2024, 19:25

Starting IGP1 = 6.65e-06 Torr


Thursday, October 03, 2024, 05:09

Starting rampdown.  Pressure stable at 4.5 e-06 Torr

Top temperature 1850 C on OMEGA

ramping down at -2A/min

  679   Saturday, November 23, 2024, 11:11 Darwin Ortiz RosalesZrC LP TUBEDoneZrC 24E9T1 + std conditioning and sintering

Saturday, November 23, 2024, 11:08

 No milling ZrC material sintering inside graphite cartridge

baseline standard discs included for comparison. 

4 Ta foils wrapped around  container

one spring at the back end to retain the graphite cartridge

One Ta cap with perforations at the front for T readings

initial heating at 2A/min to 50A, followed by heating at 1A/min to 90 A

Initial IGP1= 1.0e-6 Torr

OMEGA slope =0.990

Good and bad vacuum =5.0e-5 Torr and 5e-4 torr


Saturday, November 23, 2024, 11:20

autoramp start at 2A/min to 50A on tght


Saturday, November 23, 2024, 20:11

allowed pressure to drop to 3.3e-6 Torr after degassing. 

Started ramp to 90A at 1A/min


Saturday, November 23, 2024, 23:46

started ramping at 1.5A/120s or 0.75A/min to 400A


Sunday, November 24, 2024, 07:55

Reached 1900 C at 410 A setpoint and 402 A on RD

Pressure did not increase after bumping up to 410 setpoint so will keep at this current until 11 am (four hours near 1900 C in total)


Sunday, November 24, 2024, 10:58

Final IGP1 at start of rampdown = 2.9e-6 Torr

Ramping down at -2A/min

  680   Thursday, January 30, 2025, 09:21 Darwin Ortiz RosalesEmpty45447-30HP-SISDoneTaC coating sintering

Thursday, January 30, 2025, 09:17

Left to pump down on previous night

The coated container was wrapped in 4 Ta foil heatshields.

Vacuum IGP1 initial =8.1 e-06 Torr

Target temperature on OMEGA= 1850-1900 C

OMEGA slope:= 0.990

Target time at max temperature = 4 hours

Final Current TBHT= 230 A

Final TGHT current= ~500A (adjustable)

Heating autoramp starged at 0.5A/min(1A/120s) to 60A on both TGHT and TBHT

Then at 0.5A/min  to 90 A, both TGHT and 230A TBHT

When pressure stable will ramp at 2A/min to ~500A on TGHT and 230A on TBHT

Good vacuum = 5.0 e-04 Torr

Bad vacuum = 5.0E-02 Torr


Thursday, January 30, 2025, 09:20

currently ramping to 90A


Thursday, January 30, 2025, 12:30

Ramping to 120A @ 0.5 A/min


Thursday, January 30, 2025, 13:59

Ramping to 140 A at 1A/min (to check pressure change.  So far with slower heating, pressure has not spiked very high).


Thursday, January 30, 2025, 15:59

Started ramping @ 2A/30s to 500 A on TGHT

TBHT is at 230A


Thursday, January 30, 2025, 21:25

Target was sintered when OMEGA reading 1700-1750 C

At 640-660A on TGHT RD

Check target coating and repeat these setting if good.


Thursday, January 30, 2025, 21:43

Cooling started at -2A/min on TGHT and -1A/min TBHT

 

  681   Saturday, February 01, 2025, 09:24 Darwin Ortiz RosalesEmpty45447-28HP-SISDoneTaC coating sintering

Saturday, February 01, 2025, 09:23

The coated container was wrapped in 4 Ta foil heatshield and left in evap2 over night to attain vacuum.

Target temperature on OMEGA= 1850-1900 C

OMEGA slope:= 0.990

Target time at max temperature = 4 hours

Final Current TBHT= 230 A

Final TGHT current= ~650A (adjustable)

Heating autoramp starged at 1A/min on  TGHT  and TBHT to 120A

Then at 2 A/min  to =400 A TGHT and 230A TBHT

Good vacuum = 5.0 e-04 Torr

Bad vacuum = 5.0E-02 Torr

Initial IGP1=5.6e-07Torr


Saturday, February 01, 2025, 11:05

@ 194A, 2.5V on TGHT, the pressure is dropping (has been dropping since 150A).  starting ramp at 4a/min


Thursday, February 13, 2025, 11:40

Log entries lost as computer rebooted.  Max temperature on OMEGA was 1850 C and held for 4 hours.  Cooled @ -2A/min TGHT and -1A/min TBHT.

  682   Monday, March 03, 2025, 17:58 Darwin Ortiz RosalesEmpty45447-21LP-FEBIADDoneTaC coating sintering

Monday, March 03, 2025, 17:56

LP FEBIAD WO# 45447-21 initial wt=471.0 g (without T bar)

wrapped in 4 Ta heatshields.

Will heat at 2A/min to 95A on TGHT and TBHT

Then will heat at 2A/min to 1800 C ~400A on TGHT and 230A on TBHT


 Monday, March 03, 2025, 18:01

IGP1=3.3e-06 Torr

started initial ramp to 95A


Monday, March 03, 2025, 21:52

Start 4 hour count at 940 pm 

OMEGA reading 1750 C

TGHT= 435 A set and RD = 426 A, 7.0V

TGHT = 230A


Tuesday, March 04, 2025, 01:42

Start rampdown

  683   Monday, March 10, 2025, 09:56 Darwin Ortiz RosalesEmpty45447-3HP-FEBIADDoneTaC coating sintering

Monday, March 10, 2025, 09:50

The coated container was wrapped in 4 Ta foil heatshield and left in evap2  over weekend to decrease pressure.

Target temperature on OMEGA= 1850-1900 C

OMEGA slope:= 0.990

Target time at max temperature = 4 hours

Final Current TBHT= 230 A

Final TGHT current= ~650A (adjustable)

Heating autoramp starged at 2A/min on  TGHT  and TBHT to 120A

Then at 2 A/min  to =400 A TGHT and 230A TBHT

Good vacuum = 5.0 e-04 Torr

Bad vacuum = 5.0E-02 Torr

Initial IGP1=


 Monday, March 10, 2025, 10:36

Initial IGP1= 8.5 e-06 torr

Starting ramp to 120A for both TGHT and TBHT


Monday, March 10, 2025, 16:57

RD TGHT =686A set to 700A, 10.8V

TBHT = 230A, 3.1V

OMEGA= 1710

Will leave for 4 hours


 Monday, March 10, 2025, 20:42

IGP1=7.9e-06 Torr

OMEGA= 1750 C

TGHT = 686 A, 10.8V

TBHT= 230A, 3.1 V

starting rampdown at -2A/min TGHT and -1A/min TBHT

 

  684   Wednesday, March 12, 2025, 07:10 Darwin Ortiz RosalesEndcaps TARGET BOATDoneTaC coating sintering

Tuesday, March 11, 2025, 15:44

The coated container was wrapped in 3 Ta foil heatshields.

16 caps and 4 springs

Target temperature on OMEGA= 1750-1800C

OMEGA slope:= 0.990

Target time at max temperature = 4 hours

Final Current TBHT= N/A

Final TGHT current= ~400A (adjustable)


Wednesday, March 12, 2025, 07:07

Heating autoramp started at 1A/min on  TGHT 90A

Then at 4A/min  to 400 A.

Good vacuum = 5.0 e-04 Torr

Bad vacuum = 5.0E-02 Torr

 IGP1 initial =4.8e-07 Torr


Wednesday, March 12, 2025, 09:52

starting ramp at 2A/min to 400A 


Wednesday, March 12, 2025, 10:21

increasing ramp to 4A/min (2A/30s)


Wednesday, March 12, 2025, 11:57

TGHT=441A, 7.2V

Will keep for 4 hours

1750C


Wednesday, March 12, 2025, 15:57

starting rampdown at -2A/min

  685   Tuesday, March 18, 2025, 06:53 Darwin Ortiz RosalesEmpty45447-6LP-IG-LISDoneTaC coating sintering

Tuesday, March 18, 2025, 06:48

The coated container was wrapped in 4 Ta foil heatshields.

Vacuum IGP1 initial =9.1 e-07 Torr

Target temperature on OMEGA= 1850-1900 C

OMEGA slope:= 0.990

Target time at max temperature = 4 hours

Final Current TBHT= 230 A

Final TGHT current= ~400A (adjustable)

Heating autoramp starged a 2A/min on  TGHT   and TBHT

 to =300 A TGHT and 230A TBHT

Good vacuum = 5.0 e-04 Torr

Bad vacuum = 5.0E-02 Torr

 

 


Tuesday, March 18, 2025, 13:47

OMEGA read 1850C at 380A on TGHT.  The temperature dropped and current was raised to 390A, 6.5V on TGHT.

TBHT was kept at 230A, 3.2V

Temperature dropped to 1756 after 4 hours of sintering.  Will start rampdown at -2A/min for TGHT and -1A/min TBHT. 


 

  686   Thursday, March 20, 2025, 06:10 Darwin Ortiz RosalesEmpty45447-19LP-SISDoneTaC coating sintering

Wednesday, March 19, 2025, 13:08

The coated container was wrapped in 4 Ta foil heatshields.

Vacuum IGP1 initial =

Target temperature on OMEGA= 1800-1850 C

OMEGA slope:= 0.990

Target time at max temperature = 4 hours

Final Current TBHT= 230 A

Final TGHT current= ~400A (adjustable)

Good vacuum = 5.0 e-04 Torr

Bad vacuum = 5.0E-02 Torr


Thursday, March 20, 2025, 06:10 

IGP1 initial = 6.1e-7 Torr

 start ramp at 2A/min


Thursday, March 20, 2025, 07:04

paused ramp to prevent pressure spike


Thursday, March 20, 2025, 10:16

OMEGA 1800 C @ TGHT = 402A, 6.8V

Will leave for 4 hours.


Thursday, March 20, 2025, 13:53

Starting rampdown at 2A/min TGHT and 1A/min TBHT

  687   Tuesday, March 25, 2025, 15:26 Darwin Ortiz RosalesEmpty45447-16LP-SISDoneTaC coating sintering

Tuesday, March 25, 2025, 15:25

The coated container as wrapped in 4 Ta foil heatshields.

Vacuum IGP1 initial =e-07 Torr

Target temperature on OMEGA= 1800-1850 C

OMEGA slope:= 0.990

Target time at max temperature = 4 hours

Final Current TBHT= 230 A

Final TGHT current= ~400A (adjustable)

Good vacuum = 5.0 e-04 Torr

Bad vacuum = 5.0E-02 Torr

Will be left overnight to pump down


Wednesday, March 26, 2025, 09:07

starting ramp up at 2A/min to 230A for both TGHT and TBHT


Wednesday, March 26, 2025, 12:48

1800 C at 400A TGHT, 6.9V TGHT

Leaving for 4 hours

  688   Friday, March 28, 2025, 10:34 Darwin Ortiz RosalesEmpty45447-20LP-SISDoneTaC coating sintering

Friday, March 28, 2025, 06:49

The coated container was wrapped in 4 Ta foil heatshields.

Vacuum IGP1 initial =8.0e-07 Torr

Target temperature on OMEGA= 1800-1850 C

OMEGA slope:= 0.990

Target time at max temperature = 4 hours

Final Current TBHT= 230 A

Final TGHT current= ~400A (adjustable)

Good vacuum = 5.0 e-04 Torr

Bad vacuum = 5.0E-02 Torr

Starting ramp at 2A/min


Friday, March 28, 2025, 09:41

At 412A readback on TGHT OMEGA reads 1702 C.  Maybe re-use of Ta heatshields resulted in loss of efficiency.  Will ramp to 420 A and leave for 4 hours.


Friday, March 28, 2025, 14:25

Started rampdown at -2A/min TGHT and -1A/min TBHT

  1   Monday, March 28, 2011, 12:40 John Wong    Under Construction

Evaporator #2 is still under construction.  For further information please contact Jens Lassen.

  5   Thursday, March 01, 2012, 14:42 John Wong    IEVAP2:TGHT/TBHT max current setpoint issue

Thursday, March 01, 2012, 14:35

Both the IEVAP2:TBHT and IEVAP2:TGHT maximum current setpoints on the vacuum page (see page: /edl/ievap2_vacuum1.edl) are wrong. 

For IEVAP2:TGHT, the maximum current setpoint should be 1500A (see page: /edl/ievap2tghtcp.edl), not 1000A. 

For IEVAP2:TBHT, the maximum current setpoint should be 500A (see page: /edl/ievap2tbhtcp.edl), not 300A. 

See attachement#1 for grabscreen. 

Fault: 5853


 

 

Attachment 1: TGHT_TBHT_setpoints.JPG
TGHT_TBHT_setpoints.JPG
  15   Tuesday, April 03, 2012, 09:00 John WongEmptyTa-target boat #2  Sintering Ta-target boat with TaC coating

Tuesday, April 03, 2012, 08:54

Yesterday, a new target boat was sprayed with TaC coating and let dried.

The boat was then installed in the Evap#2 chamber and pumped down to 10-6 Torr before the target heater was turned on.  NOTE: Target boat is not wrapped with Ta-heat shield. 

TGHT auto ramping was initiated at 2.0A/min and max setpoint to 700A.  The voltage was set at 3V; therefore, the current only ramped up to 250A over night.

--> Increased the TGHT voltage to 15A, and continue ramping the TGHT to 700A.  Currently vac at low 2.3e-7 Torr. 


 Tuesday, April 03, 2012, 09:12

The vac is at low 10e-7 as the TGHT is ramping up.  Changing ramping rate from 2A/min to 5A/min. 


Tuesday, April 03, 2012, 12:00  

TGHT reached to 700A. Measured temp @ 1280C. 

Tapped up TGHT to:

800A.  Measured temp @ 1400C. 

850A (local 843A/15.60V). Measured temp @ 1450C.  

900A (local 893A/16.88V).  Measured temp @ 1500C


 Tuesday, April 03, 2012, 14:35:

Try autoramping TGHT to 1000A but voltage has gone up close to the max limit (20V).  TGHT could only go up to ~970A (see attachment 1: TGHT_maxcurrent.jpg).  The heater remained at that current for ~1hr but auto cooling was initiated - at 10A/min.


 

Attachment 1: TGHT_maxcurrent.jpg
TGHT_maxcurrent.jpg
  59   Monday, March 04, 2013, 17:41 John WongEmptyLP-SIS RFQ ver 2.0  Testing LPSIS RFQ ver 2.0

 Monday, March 04, 2013, 17:39

This is the 2nd modified target container for RFQ LPSIS.  The container will be heated up to 650A TGHT and 150A on TBHT.  No Ta-heat shield is being used.  

Heating rate at 1A/min for both TGHT & TBHT.  Once the target is at the currents, TBHT will be further ramped up to 300A.  

Temperatures are being measured by two thermocouples (one on RFQ component and the other on the Cu heat-shield).  

Gases are being analyzed using the RGA. 


 