669
|
Thursday, August 08, 2024, 11:17 |
Marla Cervantes | C | 44139-5 SK | LP TUBE | Done | Graphite foils conditioning |
Aaron Schmidt wrote: |
Wednesday, August 07, 2024, 15:36: Roughing. Had initially been roughed & TP started w/ Marla CS, however it timed out. Restarting.
Wednesday, August 07, 2024, 15:37: TP on.
Wednesday, August 07, 2024, 15:46: Tripped at 4 KRPM. Restarted. Up to 5 KRPM.
Failed to start.
Thursday, August 08, 2024, 10:00: TP started.
Thursday, August 08, 2024, 10:12: TP Tripped but nearly spun up. Reset & Restarted. TP Green / on.
|
Thursday, August 08, 2024, 10:43
A cartridge was filled with graphite foils and loaded in an uncoated tantalum tube. The tube was wrapped with four Ta-sheets. A Ta-foil was placed in the tube's right end for measuring the temperature.
Green graphite target characteristics
Number of discs |
822 |
Mass of discs |
11.74 g |
Mass of loaded cartridge with normal cap and hole-cap |
31.1290 g |
Mass of tube loaded, w/shields and tantalum cap |
250 g |
Note: A cartridge loaded with graphite foils has not been conditioned before. Thus, there is no reference on what current to use to reach 2000 °C.
The conditioning of a graphite composite target will be used as a reference, but note that the graphite foils are not expected to outgas as the composites since the foils do not contain binders and plasticizers.
Reference: Elog 636 Graphite inside insert Experiment 2 (regular formulation discs)
Initial ramps used in elog 636:
Currently waiting for vacuum to reduce to IGP1= 8.2e-07
Thursday, August 08, 2024, 11:23
Slope: 0.98 (same as slope used for tantalum targets since temperature is measured on Ta foil)
Friday, August 09, 2024, 08:50
Good vacuum 3e-5 Torr
Bad vacuum 5e-5 Torr
Initial IGP1 = 5.06E-7 Torr
Starting ramp at 1A/min to 200 A
Friday, August 09, 2024, 09:40 Pressure started to rise, but temperature is not within pyrometer range yet. Current 42 A, Voltage 0.5 V
Friday, August 09, 2024, 10:46 Pressure started to reduce (peak 1.4e-5 Torr). Temperature is not within pyrometer range yet Current 100 A, Voltage 1.3 V
Friday, August 09, 2024, 11:28 Temperature started to be detected, but not stable enough. Current 135 A, Voltage 1.9 V
Friday, August 09, 2024, 12:54 Temperature 1129 °C, current 196 A, voltage 3 V.
Friday, August 09, 2024, 12:56
Next ramp 0.5A/min while taking temperature readings periodically until 250A
Friday, August 09, 2024, 14:45
IGP1 = 1.0e-6 Torr
Next ramp 1A/min to 480 A aiming at 2000 °C
Friday, August 09, 2024, 17:13
IGP1 = 1.9e-6 Torr, Current 327A, Voltage 5.3V
Ramp changed to 2A/min to 480 A aiming at 2000 °C
Coolded down after 4 hours at ~2000°C
at -2A/min |
Attachment 1: GraphiteFoil-Conditioning-EVAP2.JPG
|
|
674
|
Friday, August 30, 2024, 11:33 |
Darwin Ortiz Rosales | Ta | 45447-8 | LP-IG-LIS | Done | TaC coating sintering | Friday, August 30, 2024, 11:31
The coated container was wrapped in 4 Ta foil heatshields.
Vacuum IGP1 initial =3.1 e-07 Torr
Target temperature on OMEGA= 1850-1900 C
OMEGA slope:= 0.990
Target time at max temperature = 4 hours
Final Current TBHT= 230 A
Final TGHT current= ~400A (adjustable)
Heating autoramp starged at 1A/min on TGHT 100A and TBHT
Then at 1A/min to =400 A TGHT and 230A TBHT
Good vacuum = 5.0 e-04 Torr
Bad vacuum = 5.0E-02 Torr
note: Left TBHT hole is off from center by a good margin
Sunday, September 01, 2024, 07:32
Starting initial ramp at 1A/min to 50A
Sunday, September 01, 2024, 15:20
have ramped ;up at 1A/min on both TGHT and TBHT but had two issues.
1) Set current and readback current have discrepancies but the TBHT discrepancy is significant (TBHT Set at 188 while RD is 231.9 A @ 1.9V)
TGHT also has odd behavior with set point 405 giving 392A RD and 0.067V. Will hold until 430pm before starting ramp down
Sunday, September 01, 2024, 16:30
Started rampdown at -2A/min TGHT and -1A/min TBHT
Note: OMEGA not able to give any reasonable readings
Tuesday, September 03, 2024, 13:51
After troubleshooting EVAP2 it was found that a copper line was touching the metal encasement grid most likely resulting in a short. A short was seeing and it disappeared after moving the copper line away from the grid.
Upon restarting on epics the PS went to maximum current and it was shut off after 30seconds to a minute. The system was checked again by Arthur and TGHT was manually increased to 5A and then set to Zero again. Arthur thinks that the PS probably requires this step after switching from local controls to remote. Will start the sintering again as the container is coated but not sintered.
Tuesday, September 03, 2024, 14:03
ramping at 1A/min on both TGHT and TBHT to 90A.
Tuesday, September 03, 2024, 22:25
Started rampdown at -2A/min TGHT and -1A/min TBHT. HIgh temperature from OMEGA was 1825 C at 430A readback on TGHT. |
675
|
Saturday, September 07, 2024, 09:55 |
Darwin Ortiz Rosales | TaC | 45447-13 | LP-SIS | Done | TaC coating sintering | Saturday, September 07, 2024, 09:54
The coated container was wrapped in 4 Ta foil heatshields.
Vacuum IGP1 initial =8.1 e-07 Torr
Target temperature on OMEGA= 1850-1900 C
OMEGA slope:= 0.990
Target time at max temperature = 4 hours
Final Current TBHT= 230 A
Final TGHT current= ~400A (adjustable)
Heating ramp manually to 50A on TGHT and TBHT
Then at 1A/min to =400 A TGHT and 230A TBHT
Good vacuum = 5.0 e-04 Torr
Bad vacuum = 5.0E-02 Torr
Saturday, September 07, 2024, 17:38
At 400 A set point on TGHT, read back is 392A and OMEGA reads 1840C. TBHT set to 230A reads 233A.
It will be kept at this current for four hours before rampdown. |
676
|
Monday, September 09, 2024, 19:08 |
Darwin Ortiz Rosales | TaC | | LP-SIS | Done | TaC coating sintering LP-SIS with gas line | Monday, September 09, 2024, 19:06
The coated container was wrapped in 4 Ta foil heatshields.
Vacuum IGP1 initial =2.6 e-06 Torr
Target temperature on OMEGA= 1800-1900 C
OMEGA slope:= 0.990
Target time at max temperature = 4 hours
Final Current TBHT= 230 A
Final TGHT current= ~400A (adjustable)
Heating autoramp starged at 1A/min on TGHT and TBHT until outgassin peak passed
Then at 1A/min to =400 A TGHT and 230A TBHT
Good vacuum = 5.0 e-04 Torr
Bad vacuum = 5.0E-02 Torr
Monday, September 09, 2024, 19:08
Peak passed around 70A will continue ramp up at 1A/min to 400A on TGHT and 230A TBHT
Tuesday, September 10, 2024, 13:13
Was ramped down at -2 A/min TGHT and -1 A/min TBHT
|
677
|
Tuesday, September 10, 2024, 13:16 |
Darwin Ortiz Rosales | Endcaps | | TARGET BOAT | Done | TaC coating sintering | A boat lined up with graphite and wrapped in 3 Ta heatshileds
Vacuum IGP1 initial =6.1 e-06 Torr
Target temperature on OMEGA= 1800-1900 C
OMEGA slope:= 0.990
Target time at max temperature = 4 hours
Final TGHT current= ~400A (adjustable)
Heating autoramp started semi-manually on TGHT to 65A and then at continue to 100A
After peak heat at 1A/min to =400 A TGHT
Good vacuum = 5.0 e-04 Torr
Bad vacuum = 5.0E-02 Torr
Tuesday, September 10, 2024, 22:22
1810C OMEGA at 439A TGHT readback |
678
|
Wednesday, October 02, 2024, 19:24 |
Darwin Ortiz Rosales | TiC | | LP TUBE | Done | sintering TiC Experiment | Wednesday, October 02, 2024, 19:21
Ta endcup at front end of container
End-caps on the graphite cartridge have holes for outgassing.
initial heating @ 2A/min to 85 A then 2A/min to 120A TGHT. Allow pressure to drop and then ramp to 400 A at 2A/min, leave 4 hours and start ramp down.
OMEGA slope = 0.99
Vacuum limits up to 400A: 5.0e-04 Torr -- 1.0e-02 Torr
Max current~400A (1900 C)
Wednesday, October 02, 2024, 19:25
Starting IGP1 = 6.65e-06 Torr
Thursday, October 03, 2024, 05:09
Starting rampdown. Pressure stable at 4.5 e-06 Torr
Top temperature 1850 C on OMEGA
ramping down at -2A/min |
679
|
Saturday, November 23, 2024, 11:11 |
Darwin Ortiz Rosales | ZrC | | LP TUBE | Done | ZrC 24E9T1 + std conditioning and sintering | Saturday, November 23, 2024, 11:08
No milling ZrC material sintering inside graphite cartridge
baseline standard discs included for comparison.
4 Ta foils wrapped around container
one spring at the back end to retain the graphite cartridge
One Ta cap with perforations at the front for T readings
initial heating at 2A/min to 50A, followed by heating at 1A/min to 90 A
Initial IGP1= 1.0e-6 Torr
OMEGA slope =0.990
Good and bad vacuum =5.0e-5 Torr and 5e-4 torr
Saturday, November 23, 2024, 11:20
autoramp start at 2A/min to 50A on tght
Saturday, November 23, 2024, 20:11
allowed pressure to drop to 3.3e-6 Torr after degassing.
Started ramp to 90A at 1A/min
Saturday, November 23, 2024, 23:46
started ramping at 1.5A/120s or 0.75A/min to 400A
Sunday, November 24, 2024, 07:55
Reached 1900 C at 410 A setpoint and 402 A on RD
Pressure did not increase after bumping up to 410 setpoint so will keep at this current until 11 am (four hours near 1900 C in total)
Sunday, November 24, 2024, 10:58
Final IGP1 at start of rampdown = 2.9e-6 Torr
Ramping down at -2A/min |
1
|
Monday, March 28, 2011, 12:40 |
John Wong | | | | | Under Construction | Evaporator #2 is still under construction. For further information please contact Jens Lassen. |
5
|
Thursday, March 01, 2012, 14:42 |
John Wong | | | | | IEVAP2:TGHT/TBHT max current setpoint issue | Thursday, March 01, 2012, 14:35
Both the IEVAP2:TBHT and IEVAP2:TGHT maximum current setpoints on the vacuum page (see page: /edl/ievap2_vacuum1.edl) are wrong.
For IEVAP2:TGHT, the maximum current setpoint should be 1500A (see page: /edl/ievap2tghtcp.edl), not 1000A.
For IEVAP2:TBHT, the maximum current setpoint should be 500A (see page: /edl/ievap2tbhtcp.edl), not 300A.
See attachement#1 for grabscreen.
Fault: 5853
|
Attachment 1: TGHT_TBHT_setpoints.JPG
|
|
15
|
Tuesday, April 03, 2012, 09:00 |
John Wong | Empty | Ta-target boat #2 | | | Sintering Ta-target boat with TaC coating | Tuesday, April 03, 2012, 08:54
Yesterday, a new target boat was sprayed with TaC coating and let dried.
The boat was then installed in the Evap#2 chamber and pumped down to 10-6 Torr before the target heater was turned on. NOTE: Target boat is not wrapped with Ta-heat shield.
TGHT auto ramping was initiated at 2.0A/min and max setpoint to 700A. The voltage was set at 3V; therefore, the current only ramped up to 250A over night.
--> Increased the TGHT voltage to 15A, and continue ramping the TGHT to 700A. Currently vac at low 2.3e-7 Torr.
Tuesday, April 03, 2012, 09:12
The vac is at low 10e-7 as the TGHT is ramping up. Changing ramping rate from 2A/min to 5A/min.
Tuesday, April 03, 2012, 12:00
TGHT reached to 700A. Measured temp @ 1280C.
Tapped up TGHT to:
800A. Measured temp @ 1400C.
850A (local 843A/15.60V). Measured temp @ 1450C.
900A (local 893A/16.88V). Measured temp @ 1500C
Tuesday, April 03, 2012, 14:35:
Try autoramping TGHT to 1000A but voltage has gone up close to the max limit (20V). TGHT could only go up to ~970A (see attachment 1: TGHT_maxcurrent.jpg). The heater remained at that current for ~1hr but auto cooling was initiated - at 10A/min.
|
Attachment 1: TGHT_maxcurrent.jpg
|
|
59
|
Monday, March 04, 2013, 17:41 |
John Wong | Empty | LP-SIS RFQ ver 2.0 | | | Testing LPSIS RFQ ver 2.0 | Monday, March 04, 2013, 17:39
This is the 2nd modified target container for RFQ LPSIS. The container will be heated up to 650A TGHT and 150A on TBHT. No Ta-heat shield is being used.
Heating rate at 1A/min for both TGHT & TBHT. Once the target is at the currents, TBHT will be further ramped up to 300A.
Temperatures are being measured by two thermocouples (one on RFQ component and the other on the Cu heat-shield).
Gases are being analyzed using the RGA.
|
85
|
Tuesday, September 17, 2013, 11:21 |
John Wong | Nb | target boat #3 (brand new!) | | | Nb thermo treatment (Bob's samples) | Tuesday, September 17, 2013, 11:14
Target boat contains 5 Nb discs. 3 discs are wraps with 0.001" thin of Nb foil (99.8% pure), and 2 are wraps with 0.001" Ta foil (see attachment#1)
Chamber has been pumped down over night. Pressure is currently at 9.8e-7 Torr.
Heating instructions:
Samples will be heated up to 800C. TGHT will be ramped up accordingly. (Two thermocouples are wielded on the target container.)
Once at the desired temperature; the samples will be heat for 4 hours before cooling down.
Tuesday, September 17, 2013, 14:37
Target temperature has reached to 800C at around 13:00 (see attachment#2)
TGHT @ 230A/3.07V (local 233A/3.25V).
IG @ 1.06e-6 Torr.
The heater will be ramped down at ~17:00 at 2A/min.
Tuesday, September 17, 2013, 17:36
Target temp: T1 = 805C, T2=797.6C
IG @ 9.4e-7 Torr.
Cooling down initiated.
Wednesday, September 18, 2013, 11:34
TGHT at 0A. Temp at 22C.
IG @ 5.8e-7 Torr.
Venting chamber.
|
Attachment 1: Nb_sample_setup.PNG
|
|
Attachment 2: Nb_800C.PNG
|
|
86
|
Thursday, September 19, 2013, 11:56 |
Laura Lambert | Nb | target boat #3 (brand new!) | | | Nb thermo treatment (Bob's samples) |
John Wong wrote: |
Tuesday, September 17, 2013, 11:14
Target boat contains 5 Nb discs. 3 discs are wraps with 0.001" thin of Nb foil (99.8% pure), and 2 are wraps with 0.001" Ta foil (see attachment#1)
Chamber has been pumped down over night. Pressure is currently at 9.8e-7 Torr.
Heating instructions:
Samples will be heated up to 800C. TGHT will be ramped up accordingly. (Two thermocouples are wielded on the target container.)
Once at the desired temperature; the samples will be heat for 4 hours before cooling down.
Tuesday, September 17, 2013, 14:37
Target temperature has reached to 800C at around 13:00 (see attachment#2)
TGHT @ 230A/3.07V (local 233A/3.25V).
IG @ 1.06e-6 Torr.
The heater will be ramped down at ~17:00 at 2A/min.
Tuesday, September 17, 2013, 17:36
Target temp: T1 = 805C, T2=797.6C
IG @ 9.4e-7 Torr.
Cooling down initiated.
Wednesday, September 18, 2013, 11:34
TGHT at 0A. Temp at 22C.
IG @ 5.8e-7 Torr.
Venting chamber.
|
Thursday, September 19, 2013, 11:41
Target boat contains batch#2 Nb samples (see attachment #1)
Chamber has been pumped down over night.
IG @ 5.5e-07 Torr.
CG1B @ 0.033 T
CG1A @ 0.127 T
There is a leak in the backing line. BV1 was bypassed in order to turn on the turbo pump. (Will investigate the leaks after the processes are done)
*See attached picture to view samples
|
Attachment 1: Capture.PNG
|
|
87
|
Thursday, September 19, 2013, 17:02 |
John Wong | Nb | target boat #3 (brand new!) | | | Nb thermo treatment (Bob's samples) |
Laura Lambert wrote: |
John Wong wrote: |
Tuesday, September 17, 2013, 11:14
Target boat contains 5 Nb discs. 3 discs are wraps with 0.001" thin of Nb foil (99.8% pure), and 2 are wraps with 0.001" Ta foil (see attachment#1)
Chamber has been pumped down over night. Pressure is currently at 9.8e-7 Torr.
Heating instructions:
Samples will be heated up to 800C. TGHT will be ramped up accordingly. (Two thermocouples are wielded on the target container.)
Once at the desired temperature; the samples will be heat for 4 hours before cooling down.
Tuesday, September 17, 2013, 14:37
Target temperature has reached to 800C at around 13:00 (see attachment#2)
TGHT @ 230A/3.07V (local 233A/3.25V).
IG @ 1.06e-6 Torr.
The heater will be ramped down at ~17:00 at 2A/min.
Tuesday, September 17, 2013, 17:36
Target temp: T1 = 805C, T2=797.6C
IG @ 9.4e-7 Torr.
Cooling down initiated.
Wednesday, September 18, 2013, 11:34
TGHT at 0A. Temp at 22C.
IG @ 5.8e-7 Torr.
Venting chamber.
|
Thursday, September 19, 2013, 11:41
Target boat contains batch#2 Nb samples (see attachment #1)
Chamber has been pumped down over night.
IG @ 5.5e-07 Torr.
CG1B @ 0.033 T
CG1A @ 0.127 T
There is a leak in the backing line. BV1 was bypassed in order to turn on the turbo pump. (Will investigate the leaks after the processes are done)
*See attached picture to view samples
|
Thursday, September 19, 2013, 17:01
TGHT reached to 800A. Temp at 795.9C for 4 hours. Vac at 5.8e-7 Torr.
Cooling down initiated. ramping rate at 2A/min.
|
88
|
Friday, September 20, 2013, 14:59 |
John Wong | Nb | target boat #3 (brand new!) | | | Nb thermo treatment (Bob's samples) |
John Wong wrote: |
Tuesday, September 17, 2013, 11:14
Target boat contains 5 Nb discs. 3 discs are wraps with 0.001" thin of Nb foil (99.8% pure), and 2 are wraps with 0.001" Ta foil (see attachment#1)
Chamber has been pumped down over night. Pressure is currently at 9.8e-7 Torr.
Heating instructions:
Samples will be heated up to 800C. TGHT will be ramped up accordingly. (Two thermocouples are wielded on the target container.)
Once at the desired temperature; the samples will be heat for 4 hours before cooling down.
Tuesday, September 17, 2013, 14:37
Target temperature has reached to 800C at around 13:00 (see attachment#2)
TGHT @ 230A/3.07V (local 233A/3.25V).
IG @ 1.06e-6 Torr.
The heater will be ramped down at ~17:00 at 2A/min.
Tuesday, September 17, 2013, 17:36
Target temp: T1 = 805C, T2=797.6C
IG @ 9.4e-7 Torr.
Cooling down initiated.
Wednesday, September 18, 2013, 11:34
TGHT at 0A. Temp at 22C.
IG @ 5.8e-7 Torr.
Venting chamber.
|
Friday, September 20, 2013, 14:56
Target contains batch#3 sample wrapped with Nb foil.
Chamber has been pumped down to 1.03e-6 Torr.
Samples will be heated up to 1200C for 4 hours.
Friday, September 20, 2013, 16:54
TGHT at 450A, temp stabilizes at 1238C.
Will cool down at 20:30 tonight.
Friday, September 20, 2013, 20:40
Samples has been heated for 4 hours at 1235C.
Cooling down initiated.
Monday, September 23, 2013, 14:40
Chamber was vented.
Batch#3 process completed.
|
89
|
Monday, September 23, 2013, 16:18 |
John Wong | Nb | target boat #3 (brand new!) | | | Nb thermo treatment (Bob's samples) |
John Wong wrote: |
John Wong wrote: |
Tuesday, September 17, 2013, 11:14
Target boat contains 5 Nb discs. 3 discs are wraps with 0.001" thin of Nb foil (99.8% pure), and 2 are wraps with 0.001" Ta foil (see attachment#1)
Chamber has been pumped down over night. Pressure is currently at 9.8e-7 Torr.
Heating instructions:
Samples will be heated up to 800C. TGHT will be ramped up accordingly. (Two thermocouples are wielded on the target container.)
Once at the desired temperature; the samples will be heat for 4 hours before cooling down.
Tuesday, September 17, 2013, 14:37
Target temperature has reached to 800C at around 13:00 (see attachment#2)
TGHT @ 230A/3.07V (local 233A/3.25V).
IG @ 1.06e-6 Torr.
The heater will be ramped down at ~17:00 at 2A/min.
Tuesday, September 17, 2013, 17:36
Target temp: T1 = 805C, T2=797.6C
IG @ 9.4e-7 Torr.
Cooling down initiated.
Wednesday, September 18, 2013, 11:34
TGHT at 0A. Temp at 22C.
IG @ 5.8e-7 Torr.
Venting chamber.
|
Friday, September 20, 2013, 14:56
Target contains batch#3 sample wrapped with Nb foil.
Chamber has been pumped down to 1.03e-6 Torr.
Samples will be heated up to 1200C for 4 hours.
Friday, September 20, 2013, 16:54
TGHT at 450A, temp stabilizes at 1238C.
Will cool down at 20:30 tonight.
Friday, September 20, 2013, 20:40
Samples has been heated for 4 hours at 1235C.
Cooling down initiated.
Monday, September 23, 2013, 14:40
Chamber was vented.
Batch#3 process completed.
|
Monday, September 23, 2013, 16:14
Batch#4. Target container contains 2 Nb stables (a bullet type and a disc).
Samples are wrapped with "dimpled" Nb foil to prevent diffusion bonding.
Chamber has been pumped down to 8.3e-7 Torr, CG1B @ 30mT, CG1A @ 118mT.
Samples will be heated up to 1400C for 4 hours.
Monday, September 23, 2013, 17:46
TGHT at 620A. Temp at 1400C. Current pressure @ 2.5e-6 Torr.
Tuesday, September 24, 2013, 16:45
Sample#4 was heated up to 1400C and after about 3hrs, the target container started to break.
See the link below for more details:
https://www.dropbox.com/s/9mhpkz66u6yqldm/Nb_1400C.mp4
|
103
|
Monday, January 20, 2014, 16:35 |
Laura Lambert | Empty | Ta-Target boat | | | Sintering Ta target boat with TaC coating | Monday, January 20, 2014, 16:32
A new target boat was sprayed with TaC coating and let dry this morning.
The target boat is NOT wrapped with Ta-heat shield.
The boat was installed in Evap#2, chamber is currently being pumped down overnight.
|
104
|
Tuesday, January 21, 2014, 11:33 |
Laura Lambert | Empty | 40282-4 | TARGET BOAT | | Sintering Ta target boat with TaC coating |
Laura Lambert wrote: |
Monday, January 20, 2014, 16:32
A new target boat was sprayed with TaC coating and let dry this morning.
The target boat is NOT wrapped with Ta-heat shield.
The boat was installed in Evap#2, chamber is currently being pumped down overnight.
|
Tuesday, January 21, 2014, 11:10
Chamber was pumped down to ~2e-7 Torr. HS cooling water valves were opened, no leaks detected.
TGHT was stepped up to 35A, voltage max set at 13V. TBHT currently @ 0A.
Waited ~20min, current stabilized, vacuum started to drop, auto-ramp initiated at 2.0A/min and max setpoint to 700A.
Good vacuum: 3.00e-5 Torr, Bad vacuum 4.00e-5 Torr.
|
105
|
Tuesday, January 21, 2014, 11:56 |
Laura Lambert | Empty | 40282-4 | TARGET BOAT | | Sintering Ta target boat with TaC coating |
Laura Lambert wrote: |
Laura Lambert wrote: |
Monday, January 20, 2014, 16:32
A new target boat was sprayed with TaC coating and let dry this morning.
The target boat is NOT wrapped with Ta-heat shield.
The boat was installed in Evap#2, chamber is currently being pumped down overnight.
|
Tuesday, January 21, 2014, 11:10
Chamber was pumped down to ~2e-7 Torr. HS cooling water valves were opened, no leaks detected.
TGHT was stepped up to 35A, voltage max set at 13V. TBHT currently @ 0A.
Waited ~20min, current stabilized, vacuum started to drop, auto-ramp initiated at 2.0A/min and max setpoint to 700A.
Good vacuum: 3.00e-5 Torr, Bad vacuum 4.00e-5 Torr.
|
Tuesday, January 21, 2014, 11:51
Vacuum was grumpy and was well on it's way to tripping off [reached 5e-5 Torr], auto ramping was stopped at ~95A and quickly stepped down to 90A to avoid tripping it off.
Allowed vacuum to settle back down to 2.3e-6 Torr. Auto ramping changed to 0.2A/min and re-started.
close-call!
|
106
|
Wednesday, January 22, 2014, 09:49 |
Laura Lambert | Empty | 40282-4 | TARGET BOAT | | Sintering Ta target boat with TaC coating |
Laura Lambert wrote: |
Laura Lambert wrote: |
Laura Lambert wrote: |
Monday, January 20, 2014, 16:32
A new target boat was sprayed with TaC coating and let dry this morning.
The target boat is NOT wrapped with Ta-heat shield.
The boat was installed in Evap#2, chamber is currently being pumped down overnight.
|
Tuesday, January 21, 2014, 11:10
Chamber was pumped down to ~2e-7 Torr. HS cooling water valves were opened, no leaks detected.
TGHT was stepped up to 35A, voltage max set at 13V. TBHT currently @ 0A.
Waited ~20min, current stabilized, vacuum started to drop, auto-ramp initiated at 2.0A/min and max setpoint to 700A.
Good vacuum: 3.00e-5 Torr, Bad vacuum 4.00e-5 Torr.
|
Tuesday, January 21, 2014, 11:51
Vacuum was grumpy and was well on it's way to tripping off [reached 5e-5 Torr], auto ramping was stopped at ~95A and quickly stepped down to 90A to avoid tripping it off.
Allowed vacuum to settle back down to 2.3e-6 Torr. Auto ramping changed to 0.2A/min and re-started.
close-call!
|
Wednesday, January 22, 2014, 09:46
TGHT has been slowly ramping up overnight at a rate of 0.2A/min.
IGP1 = 2.9e-7 Torr, TGHT = 342A; stepping ramping rate up to 2.0A/min.
|
|