Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  Evaporator_2, Page 32 of 34  Not logged in ELOG logo
New entries since:Wed Dec 31 16:00:00 1969
ID Date Author Target Materialdown Target Oven W.O# Source Status Subject Text Attachments
  424   Thursday, November 22, 2018, 10:19 Marla Cervantes 43630-7  DoneGraphite insert test #2 Thursday, November 22, 2018, 10:12
A previously sintered tantalum tube
with 3 layers of shielding was loaded with
  
  425   Thursday, December 20, 2018, 10:27 Marla Cervantes 43630-6 DoneTantalum tube heatingThursday, December 20, 2018, 10:24
A tantalum tube was
  
  428   Wednesday, January 23, 2019, 13:06 Marla Cervantes 43630-2 DoneGraphite insert test #3 Wednesday, January 23, 2019, 13:01
A previously coated tantalum
  
  430   Wednesday, February 13, 2019, 10:08 Darwin Ortiz Rosales 43630-1  DoneGraphite insert test 3b Wednesday, February 13, 2019, 10:04
A previously coated tantalum
  
  433   Wednesday, March 13, 2019, 15:43 Marla Cervantes 43630-6 DoneGraphite insert test #4 Wednesday, March 13, 2019, 15:41
An uncoated tantalum tube was loaded
with a graphite insert (with conical caps).
  
  435   Monday, April 01, 2019, 16:35 Darwin Ortiz Rosales 43630-4 DoneTaC coating/graphite/sinteringMonday, April 01, 2019, 16:35
Container was coated with TaC and
a roll of graphite inserted inside the tube.
  
  437   Sunday, April 07, 2019, 08:13 Marla Cervantes 43630-5 DoneGraphite insert test #5 Sunday, April 07, 2019, 08:10
A graphite insert (with conical caps)
was loaded in tantalum tube previously coated
 190407-GraphiteInsertTest.pdfV1.JPGV2.JPG20190415_170133.jpg 
  438   Tuesday, April 16, 2019, 13:40 Aaron Schmidt    Replace bottom insert on HS  Tuesday, April 16, 2019, 13:38: Replaced
the bottom insert on the heat shield. 
Used small amount of isopropyl alcohol
  
  439   Wednesday, April 17, 2019, 09:06 Marla Cervantes 38295-10LP-FEBIADDoneGraphite insert test Wednesday, April 17, 2019, 09:03
An uncoated target container was
loaded with a graphite insert and wrapped
 190417-TargetContainer-TEMP.pdfIMG_1074.JPG 
  442   Friday, May 10, 2019, 16:58 Marla Cervantes 43943-1 DoneTaC coating/sintering for graphite insert test Friday, May 10, 2019, 16:54
A tantalum tube was coated with TaC,and
wrapped with three tantalum sheets,
  
  443   Tuesday, May 14, 2019, 13:57 Aaron Schmidt  LP-FEBIADDoneTest FEBIAD Tuesday, May 14, 2019, 13:56: Removed
old HS w/ flexible lines & swapped in
the FEBIAD. (HS waterlines are still purged.)
  
  444   Tuesday, May 21, 2019, 14:34 Aaron Schmidt    HS swap to EVAP 2 flex line. Tuesday, May 21, 2019, 14:33: Install
flexible line evap 2 HS.
  
  445   Tuesday, May 21, 2019, 18:01 Marla Cervantes 43943-1 DoneGraphite foil test Tuesday, May 21, 2019, 17:57
A tantalum tube previously coated
with TaC and sintered was loaded with graphite
  
  446   Friday, May 24, 2019, 15:29 Marla Cervantes 43943-2 DoneGraphite insert testFriday, May 24, 2019, 15:26
 A graphite insert with tantalum
wires in its caps
  
  448   Monday, June 17, 2019, 17:03 Marla Cervantes 43943-2 DoneGraphite insert testThursday, June 6, 2019, 16:43
A graphite insert with tantalum
  
  449   Monday, June 17, 2019, 17:09 Marla Cervantes 49044-9LP-SISDoneTarget container calibration/conditioning Monday, June 17, 2019, 17:04
A LP-SIS target container  was
wrapped with 3 heat shielding layers,
  
  454   Wednesday, August 28, 2019, 05:59 Marla Cervantes 44062-2-SK DoneGraphite insert testWednesday, August 28, 2019, 06:00
A graphite insert (with conical
  
  455   Friday, September 06, 2019, 11:58 Darwin Ortiz Rosales 44062-4LP-SISDoneTaC coating/sinteringFriday, September 06, 2019, 11:20
Container was coated with Tac and
wrapped with 2 Ta heat shields.
 190906LPSIS_Sintering.PNG 
  456   Wednesday, September 11, 2019, 15:16 Marla Cervantes 44062-4LP-SISDoneTaC coated target container calibration/conditioning  Wednesday, September 11, 2019, 15:12
A target container coated with TaC elog
 A.JPGB.JPG 
  458   Tuesday, September 17, 2019, 13:25 Aaron Schmidt  LP-SISProblems resolvedTurbo pump / roughing troubleshoot.Swapped out VCRs on HS to tray connection.
(Right one felt slightly off)
Tuesday, September 17, 2019, 13:23:
  
ELOG V2.9.2-2455