409
|
Tuesday, May 08, 2018, 15:06 |
John Wong | np-SiC | Tube container | | Done | NanoSiC thermal treatment batch#2 | Tuesday, May 08, 2018, 15:02
22 np-SiC fibrous discs loaded in the tube container (coated and sintered with TaC)
Heat treatment is similar to previous process, see elog #408.
TGHT should be set at 330A/5.2V to reach temp 1575C (+/- 25).
Omega slope set at 1.05 (for carbide)
Chamber is currently being pumped down
Tuesday, May 08, 2018, 22:46
Pressure at 2.2e-6 Torr.
Initiated autoramping at 0.2A/min to reach 330A
Friday, May 11, 2018, 11:11
TGHT reached to 330A/5.1V but temp was measured at 1400A; It was held at that current for about 10 hours.
Increased TGHT to 335A/5.2V - temp is holding at 1420C (Will check the window if there is any coating that might have caused the discrepancy)
Sunday, May 13, 2018, 00:25
In fact, the window is slightly coated. The temperature should already be at optimum, 1600C. Will keep heating for another day.
Sunday, May 13, 2018, 14:10
Temp holding up well.. Pressure at 1.8e-7 torr.
cooling down at 2A/min.
Monday, May 14, 2018, 09:33
Target has been cooled for over 18 hours. Pressure at 1.1e-7 Torr.
Venting chamber.
mass loss = (8.65 - 4.32)g = 4.33 g (50%) [slightly higher than expected, likely due to increase of 5A on TGHT]
|
413
|
Tuesday, July 03, 2018, 17:05 |
John Wong | np-SiC | Tube container | | Done | NanoSiC thermal treatment batch #3 | Tuesday, July 03, 2018, 17:02
49 discs/ 15.42g np-SiC fibrous discs loaded into the tube container
Heat treatment is similar to previous process, see elog#408/409.
TGHt should be set at 330A/5.2V to reach temp 1575C (+/- 25C)
Omega slope set at 1.05 (for carbide)
Chamber is currently being pumped down
Wednesday, July 04, 2018, 10:38
Pressure at 1.5 e-6 Torr.
Initiated auto-ramping at 0.2A/min to reach 330A/5.2V.
Monday, July 09, 2018, 14:44
TGHT has been stabilized at 330A/5.2V for 24 hours. Pressure at 3.7e-7 Torr.
Temp was measured at 1400C - light coating on window likely affected the measurements.
Measured with one-color pyrometer on Ta body inside the target container = 1550 C (with the correction of 250C for Ta).
Adjusted OMEGA slope to 1.18, temp currently at 1580 C.
Monday, July 09, 2018, 16:42
Pressure stabilized at 3.5e-7 Torr.
Initiated auto-cooling at 1A/min.
Tuesday, July 10, 2018, 11:11
Target is at room temperature.
Process completed; see attachment for the data retrieval and dropbox (np-SiC production folder) for screen capture.
mass loss = (15.42 - 8.09) g = 7..33 g (47.5%) [in agreement - good!]
|
Attachment 1: data-retrieval.JPG
|
|
416
|
Monday, August 20, 2018, 18:10 |
John Wong | np-SiC | 43044-1 | LP-SIS | Done | nano-SiC final conditioning | Monday, August 20, 2018, 17:58
14.9 g of np-SiC fibrous target discs are loaded into the container (previously coated with TaC and sintered, see elog ID 414).
Total loaded length 9.5 cm.
A 1.5" width graphite sheet is used as under layer to prevent TaC diffused to the discs; this was observed during the heat treatment, (see dropbox SEM images).
Both end caps are in. With ionizer pointing out, right cap is expended BUT NOT left cap - will need to expend this after the conditioning.
No Ta heat-shield is used.
Final conditioning temperature: 1500 C (As per e-log 414, TGHT = 450A/7.31V, 3.28kW)
Keeping TBHT at 0A for now - will ramp up after TGHT reach to the desired temperature.
OMEGA slope set at 0.99
Good vac = 3.0e-5 Torr,
Bad vac = 5.0e-5 Torr.
Tuesday, August 21, 2018, 10:24
Pressure at 1.2e-6 Torr.
Initiated autoramping at 2A/min for TGHT to reach 400A - monitoring temp and vacuum.
TBHT set at 10A.
Tuesday, August 21, 2018, 15:13
Temp reached to 1350C. TGHT at 400A/6.7V. Pressure at 1.9e-6 Torr after holding at the temp for 100 min.
Tuesday, August 21, 2018, 15:28
Tapped up TGHT to 450A/7.8V (3.5kW). Temp measured at 1465 +/- 5 C. Pressure coming down from 3.5 e-6 Torr.
Tuesday, August 21, 2018, 15:32
Tapping up TBHT to 230A
Tuesday, August 21, 2018, 16:25
TBHT at 230A/4.33V. Pressure started to increase from 150A, and reached to 3.3e-6 Torr after TGHT reached to the setting.
Temperature measured at 1475 C +/- 5C. Holding at this temperature until vacuum comes to stabilization (est.2-3 hours)
Tuesday, August 21, 2018, 16:45
Checked with Mikron (slope set at 0.99); temp on left end-cap measured at 1490 +/- 20C (that's close enough). Temp on ionizer tube about 1900C
Tuesday, August 21, 2018, 22:12
Pressure at 1.7e-6 Torr. Temp holding at 1480C, TGHT at 450/7.7V, TBHT 230A/4.27V.
Cooling down at 2A/min for TGHT and 1A/min for TBHT
|
512
|
Monday, September 28, 2020, 11:53 |
John Wong | np-SiC | | TARGET BOAT | In progress | np-SiC carbonization | Monday, September 28, 2020, 11:49
6 discs of np-SiC were loaded to the target boat wrapped with 3 layers of heat shields.
Desired temperature at 1500 C, (As per e-log 414/416, TGHT = 450A/7.31V, 3.28kW)
Omega slope set at 1.05 (for carbide)
Good vac = 3.0e-5 Torr,
Bad vac = 5.0e-5 Torr.
Pumping down in progress
Monday, September 28, 2020, 21:44
Pressure at 1e-6 Torr. Initiated autoramping at 0.2A/min to reach 300 A. Monitor temp.
Wednesday, September 30, 2020, 11:39
TGHT reached to 300 A/ 4.5V, temp at 1130 C. No coating on windows.
Continue to ramp up 330A. Monitor temp.
Wednesday, September 30, 2020, 16:38
TGHT reached 330 A / 5.04 V, temp at 1190 C.
Ramp up to 400 A. Current pressure at 9.8 e-7 Torr.
Thursday, October 01, 2020, 10:28
TGHT reached 400 A/ 6.3V, temp at 1320 C. Continue to ramp up to 450 A.
Thursday, October 01, 2020, 16:44
TGHT reached to 450 A/ 7.4 V. TEmp at 1500 C.
Pressure at 1.35 e-6 Torr and coming down. Continue to hold TGHT at 1500 C for at least 24 hr.
Sunday, October 04, 2020, 16:49
TGHT has been holding at 450 A/ 7.3 V for nearly 3 days; temp has gone up and stabilized at 1554 C; pressure at 2.13 e -7 Torr.
Initiated cooling down at -2A/min.
Monday, October 05, 2020, 10:02
Chamber vented.
|
203
|
Friday, May 29, 2015, 11:29 |
Laura Lambert | ZrC | 41177-1 | LP-SIS | In progress | Conditioning ZrC#7 | Friday, May 29, 2015, 11:21
Total number of foils: 425 discs
Total mass of materials [incl graphite foils]: 44.41g
Total length packed: 12.3cm
Container has no heat shields.
No endcaps inserted to allow outgassing.
Currently being pumped down.
Friday, May 29, 2015, 14:13
HS water valves opened, no leaks detected.
IGP1 = 5.4e-6 Torr.
Tapping up manually.
Friday, May 29, 2015, 16:48
Tapped up manually to 20A.
IGP1 = 5.9e-6 Torr.
Initiating auto-ramp at 0.2A/min for the TGHT and 0.1A/min for the TBHT.
Max setpoints set to 580A and 230A for the TGHT and TBHT respectively.
Good Vacuum = 3.0e-5 Torr. Bad Vacuum = 4.0e-5 Torr.
Monday, June 01, 2015, 09:17
IGP1 = 3.8e-6 Torr.
TGHT = 478A.
TBHT reached max setpoint of 230A.
Increasing ramping rate to 0.5A/min.
Monday, June 01, 2015, 13:15
Checked window for temperature readings, good visibility, no coating on window.
IGP1 = 9.1e-6 Torr.
TGHT reached max setpoint of 580A 30min ago.
Stepping up manually to a target temperature of 2000C...
Monday, June 01, 2015, 16:25
IGP1 = 6.5e-6 Torr.
TGHT = 870A, 17.90V
OMEGA = 1948C
|
204
|
Monday, June 01, 2015, 18:09 |
John Wong | ZrC | 41177-1 | LP-SIS | In progress | Conditioning ZrC#7 |
Laura Lambert wrote: |
Friday, May 29, 2015, 11:21
Total number of foils: 425 discs
Total mass of materials [incl graphite foils]: 44.41g
Total length packed: 12.3cm
Container has no heat shields.
No endcaps inserted to allow outgassing.
Currently being pumped down.
Friday, May 29, 2015, 14:13
HS water valves opened, no leaks detected.
IGP1 = 5.4e-6 Torr.
Tapping up manually.
Friday, May 29, 2015, 16:48
Tapped up manually to 20A.
IGP1 = 5.9e-6 Torr.
Initiating auto-ramp at 0.2A/min for the TGHT and 0.1A/min for the TBHT.
Max setpoints set to 580A and 230A for the TGHT and TBHT respectively.
Good Vacuum = 3.0e-5 Torr. Bad Vacuum = 4.0e-5 Torr.
Monday, June 01, 2015, 09:17
IGP1 = 3.8e-6 Torr.
TGHT = 478A.
TBHT reached max setpoint of 230A.
Increasing ramping rate to 0.5A/min.
Monday, June 01, 2015, 13:15
Checked window for temperature readings, good visibility, no coating on window.
IGP1 = 9.1e-6 Torr.
TGHT reached max setpoint of 580A 30min ago.
Stepping up manually to a target temperature of 2000C...
Monday, June 01, 2015, 16:25
IGP1 = 6.5e-6 Torr.
TGHT = 870A, 17.90V
OMEGA = 1948C
|
Monday, June 01, 2015, 17:59
After almost an hour at 870A, the temperature went up from 1948C to 1980C; however temperature around the target container/legs are >2000C. The voltage on the power supply also went up slightly.
There is a film coated on the window port and that could affect the temp reading.
To be safe, I lowered the TGHT to 830A/17.38V, temp at 1930C.
Will keep at 830A for 4 hours and cool down this evening.
Recommend: Using Ta-heat shields for sintering next time.
Monday, June 01, 2015, 22:55
TGHT at 830A for almost 5 hours.
TEMP has gone up to 1994C. Voltage has also gone up to 19V.
Cooling down at 2A/min for TGHT and 1A/min for TBHT.
|
205
|
Tuesday, June 02, 2015, 13:05 |
John Wong | ZrC | 41177-1 | LP-SIS | Done | Conditioning ZrC#7 |
John Wong wrote: |
Laura Lambert wrote: |
Friday, May 29, 2015, 11:21
Total number of foils: 425 discs
Total mass of materials [incl graphite foils]: 44.41g
Total length packed: 12.3cm
Container has no heat shields.
No endcaps inserted to allow outgassing.
Currently being pumped down.
Friday, May 29, 2015, 14:13
HS water valves opened, no leaks detected.
IGP1 = 5.4e-6 Torr.
Tapping up manually.
Friday, May 29, 2015, 16:48
Tapped up manually to 20A.
IGP1 = 5.9e-6 Torr.
Initiating auto-ramp at 0.2A/min for the TGHT and 0.1A/min for the TBHT.
Max setpoints set to 580A and 230A for the TGHT and TBHT respectively.
Good Vacuum = 3.0e-5 Torr. Bad Vacuum = 4.0e-5 Torr.
Monday, June 01, 2015, 09:17
IGP1 = 3.8e-6 Torr.
TGHT = 478A.
TBHT reached max setpoint of 230A.
Increasing ramping rate to 0.5A/min.
Monday, June 01, 2015, 13:15
Checked window for temperature readings, good visibility, no coating on window.
IGP1 = 9.1e-6 Torr.
TGHT reached max setpoint of 580A 30min ago.
Stepping up manually to a target temperature of 2000C...
Monday, June 01, 2015, 16:25
IGP1 = 6.5e-6 Torr.
TGHT = 870A, 17.90V
OMEGA = 1948C
|
Monday, June 01, 2015, 17:59
After almost an hour at 870A, the temperature went up from 1948C to 1980C; however temperature around the target container/legs are >2000C. The voltage on the power supply also went up slightly.
There is a film coated on the window port and that could affect the temp reading.
To be safe, I lowered the TGHT to 830A/17.38V, temp at 1930C.
Will keep at 830A for 4 hours and cool down this evening.
Recommend: Using Ta-heat shields for sintering next time.
Monday, June 01, 2015, 22:55
TGHT at 830A for almost 5 hours.
TEMP has gone up to 1994C. Voltage has also gone up to 19V.
Cooling down at 2A/min for TGHT and 1A/min for TBHT.
|
Tuesday, June 02, 2015, 12:37
Chamber was vented and the target was inspected.
Some stressed marks on the target container can be observed.
The container is also slightly curved but otherwise it's fine.
The materials packed length has expended outward so 3 discs were removed in order to insert the end caps.
The packed length is now 16cm.
Two extra graphite foils were inserted on both ends, and previously coated/sintered TaC-end caps are inserted and expended.
Rn foil is inserted & Std solutions are added.
Ready for test-stand.
Link to photos for more details:
https://www.dropbox.com/sh/0cra7viqs9ro8q3/AADEGk8goGI4c-uzRQSGwWmxa?dl=0
|
206
|
Wednesday, June 03, 2015, 10:47 |
Laura Lambert | ZrC | 41177-1 | LP-SIS | Done | Conditioning ZrC#7 |
John Wong wrote: |
John Wong wrote: |
Laura Lambert wrote: |
Friday, May 29, 2015, 11:21
Total number of foils: 425 discs
Total mass of materials [incl graphite foils]: 44.41g
Total length packed: 12.3cm
Container has no heat shields.
No endcaps inserted to allow outgassing.
Currently being pumped down.
Friday, May 29, 2015, 14:13
HS water valves opened, no leaks detected.
IGP1 = 5.4e-6 Torr.
Tapping up manually.
Friday, May 29, 2015, 16:48
Tapped up manually to 20A.
IGP1 = 5.9e-6 Torr.
Initiating auto-ramp at 0.2A/min for the TGHT and 0.1A/min for the TBHT.
Max setpoints set to 580A and 230A for the TGHT and TBHT respectively.
Good Vacuum = 3.0e-5 Torr. Bad Vacuum = 4.0e-5 Torr.
Monday, June 01, 2015, 09:17
IGP1 = 3.8e-6 Torr.
TGHT = 478A.
TBHT reached max setpoint of 230A.
Increasing ramping rate to 0.5A/min.
Monday, June 01, 2015, 13:15
Checked window for temperature readings, good visibility, no coating on window.
IGP1 = 9.1e-6 Torr.
TGHT reached max setpoint of 580A 30min ago.
Stepping up manually to a target temperature of 2000C...
Monday, June 01, 2015, 16:25
IGP1 = 6.5e-6 Torr.
TGHT = 870A, 17.90V
OMEGA = 1948C
|
Monday, June 01, 2015, 17:59
After almost an hour at 870A, the temperature went up from 1948C to 1980C; however temperature around the target container/legs are >2000C. The voltage on the power supply also went up slightly.
There is a film coated on the window port and that could affect the temp reading.
To be safe, I lowered the TGHT to 830A/17.38V, temp at 1930C.
Will keep at 830A for 4 hours and cool down this evening.
Recommend: Using Ta-heat shields for sintering next time.
Monday, June 01, 2015, 22:55
TGHT at 830A for almost 5 hours.
TEMP has gone up to 1994C. Voltage has also gone up to 19V.
Cooling down at 2A/min for TGHT and 1A/min for TBHT.
|
Tuesday, June 02, 2015, 12:37
Chamber was vented and the target was inspected.
Some stressed marks on the target container can be observed.
The container is also slightly curved but otherwise it's fine.
The materials packed length has expended outward so 3 discs were removed in order to insert the end caps.
The packed length is now 16cm.
Two extra graphite foils were inserted on both ends, and previously coated/sintered TaC-end caps are inserted and expended.
Rn foil is inserted & Std solutions are added.
Ready for test-stand.
Link to photos for more details:
https://www.dropbox.com/sh/0cra7viqs9ro8q3/AADEGk8goGI4c-uzRQSGwWmxa?dl=0
|
see attachment for data recorded during ZrC conditioning |
Attachment 1: Conditioning_target_-_no_heat_shields-no_endcaps.xlsx
|
223
|
Thursday, June 25, 2015, 16:20 |
Laura Lambert | ZrC | 41177-2 | LP-SIS | In progress | Sintering back-up ZrC | Thursday, June 25, 2015, 16:14
Total number of foils: 422 discs
Total mass of materials [incl graphite foils]:
Total length packed: 12.0cm
Container has one Ta heat shield.
No endcaps inserted to allow outgassing
Two TaC coated Ta wires formed into a spring inserted either end to avoid ZrC expansion of materials.
Currently being pumped down.
Friday, June 26, 2015, 11:44
HS water valves opened.
No leaks detected.
Initiating ramp up.
Friday, June 26, 2015, 14:44
EVAP2 was tapped up manually to 50A.
Vacuum tripped evap off.
Tapping back up manually now...
Friday, June 26, 2015, 15:53
Tapped up manually to 45A for both TGHT and TBHT
IGP1 = 4.8e-5 Torr
Will initiate auto-ramp at 0.2A/min and 0.1A/min for the TGHT and TBHT respectively once vacuum settled down and stable.
Max setpoints set to 520A and 230A for the TGHT and TBHT respectively.
Good Vacuum = 3.0e-5 Torr. Bad Vacuum = 4.0e-5 Torr.
|
224
|
Monday, June 29, 2015, 07:05 |
John Wong | ZrC | 41177-2 | LP-SIS | Done | Sintering back-up ZrC |
Laura Lambert wrote: |
Thursday, June 25, 2015, 16:14
Total number of foils: 422 discs
Total mass of materials [incl graphite foils]:
Total length packed: 13.2cm
Container has one Ta heat shield.
No endcaps inserted to allow outgassing
Two TaC coated Ta wires formed into a spring inserted either end to avoid ZrC expansion of materials.
Currently being pumped down.
Friday, June 26, 2015, 11:44
HS water valves opened.
No leaks detected.
Initiating ramp up.
Friday, June 26, 2015, 14:44
EVAP2 was tapped up manually to 50A.
Vacuum tripped evap off.
Tapping back up manually now...
Friday, June 26, 2015, 15:53
Tapped up manually to 45A for both TGHT and TBHT
IGP1 = 4.8e-5 Torr
Will initiate auto-ramp at 0.2A/min and 0.1A/min for the TGHT and TBHT respectively once vacuum settled down and stable.
Max setpoints set to 520A and 230A for the TGHT and TBHT respectively.
Good Vacuum = 3.0e-5 Torr. Bad Vacuum = 4.0e-5 Torr.
|
Monday, June 29, 2015, 06:57
TGHT has been at 520A/9.80V, DV 5.80V for 7 hours, temperature measured at 1800C. Vac is coming down to 9.18e-6 Torr. However, TGHT voltage is slightly going up over the 7 hours of heating, See screenshot attachment. (Can't make further comments until target is inspected.)
Initiated cooling down at 2A/min for TGHT and 1A/min for TBHT.
Chamber can be vented later today.
Monday, June 29, 2015, 14:58
Target has been inspected.
Slightly crystallization on the outer tube of the container can be observed.
Overall, the container looks a lot better than before.
Rn foiled inserted. Salt added - Ready for test-stand
|
Attachment 1: Screen_Shot_2015-06-29_at_7.14.12_AM.png
|
|
434
|
Monday, March 18, 2019, 15:58 |
Darwin Ortiz Rosales | ZrC | 43044-5 | LP-SIS | Done | Sintering ZrC | Monday, March 18, 2019, 15:51
Total number of foils: 555
Total mass of material including graphite foils: 478 grams
Total length packed 14.2 cm
container has 3 Ta heat shields.
No endcaps inserted to facilitate outgassing
Two TaC coated Ta wire springs inserted at either end to allow for ZrC expansion.
5 extra foils tucked beneath each spring for QC; total mass (10 discs) =1.0160 g
Desired temp = 1900 C, Auto ramping TGHT at 0.1 A/min to reach 280A A (Omega slope set = 0.990, approx 1400 C, Elog#427), TGHT will be tapped up accordingly to reach desired temperature.
TBHT will be set fixed at 230A (max). TBHT at 0.1 A/min to reach 230A.
Good vac at 3.00-5 Torr
Bad vac at 5.0e-5 Torr.
Currently being pumped down.
Tuesday, March 19, 2019, 08:57
Current pressure IGP1 = 5.24e-07 Torr
Manually tapping to 40A on TBHT and TGHT
At 20 A IGP1 pressure trending up. Will leave at 20A until trending down.
Pressure @ 20 A set, peaked ~1.8e-06 Torr after 1 hour
Tuesday, March 19, 2019, 10:32
Tapping manually to 50 A on TBHT and TGHT while monitoring IGP1 pressure
Tapped to 25 A and IGP1 pressure trending up. Will allow to stabilize.
Tuesday, March 19, 2019, 11:34
Pressure stabilized at ~3.25e-06 Torr
Tapped up to 30 A on both TGHT and TBHT
Pressure stabilized at ~6.6e-06
Tapped up to 34A on both TGHT and TBHT
Pressure stabilized at ~1.2e-05 Will allow to drop before proceeding
Tuesday, March 19, 2019, 13:43
Tapped up to 40A waiting for pressure to stabilize
Pressure shot up ~8.5e-05, therefore tapped down TGHT to 35A (At 35A TGHT current value fluctuates, probably better to ramp up to 36A)
Will let pressure drop before proceeding with TGHT heating
Ramped TGHT to 36A, IGP1 pressure still trending down and current measurements stable.
Starting autoramp at 0.3A/min for both TGHT and TBHT until 280A and 230A respectively
Initial TGHT Current: 33.6A, 0.05V
Initial TBHT Current: 38.6A, 0.48V
IGP1 = 4.9e-05 Torr
Wednesday, March 20, 2019, 09:41
TGHT has only ramped to 45.7 A, 0.085V
TBHT has only ramped to 50.2A, 0.62V
IGPI pressure ~4.0 e-5 Torr
Stopping ramp and monitoring pressure to see if it drops appropriate levels.
Wednesday, March 20, 2019, 14:10
IGP1 pressure = 7.6e-06 Torr
TGHT 47.7Z, 0.16V
TBHT 50.1A, 0.63V
Autoramp at 0.1A/min both TGHT and TBHT to 280A and 230A respectively.
Thursday, March 21, 2019, 08:12
IGP1 = 3.1e-05 Torr
TGHT = 51.4 A, 0.18V
TBHT=61.9A, 0.87V
Stopped autoramp
Manually ramping TGHT and TBHT while monitoring pressure
Rampted up TGHT to 54A (reading 65 A), 0.5V and TBHT to 68A, 0.9V
Allowing pressure to stabilize
Manually tapped TGHT to 80A, .81V
Manually tapped TBHT to 90A, 1.3V
IGP1 = .0002 Torr
Will leave over night to allow pressure to drop
Friday, March 22, 2019, 08:17
IGP1 = 6.6e-06
TGHT = 88.8A, 0.81V
TBHT = 90.1A, 1.3V
Will manually tap ~100A on both TBHT and TGHT
Friday, March 22, 2019, 12:18
IGP1 = 1.28e-05 Torr
TGHT = 100.9A, 1.0V
TBHT = 101.2A, 1.5V
will allow pressure to drop slightly the autoramp at 0.1A/min for both TGHT and TBHT until 280A and 230A respectively
Friday, March 22, 2019, 14:51
IGP1= 7.4 e-06 Torr
TGHT = 100.8A, 1.0V
TBHT= 101.5A, 1.5V
Started autoramp at 0.1A/min for both TGHT and TBHT until 280A and 230A respectively
Tuesday, March 26, 2019, 08:18
IGP1 oscillated around ramping trip point 3.0e-05 while current slowly ramped to 280A (reached sometime during the night).
IGP1= 7.8e-06 Torr
TGHT= 283.4A, 4.2V
TBHT= 233.1A, 4.1V
Will continue ramp TGHT @0.2A/min up to 400A (Omega slope set = 0.990, approx 1800 C, Elog#427)
Wednesday, March 27, 2019, 09:39
Target has been at 400A, OMEGA ~1400C since ~7pm of previous evening
TGHT = 400.2A, 6.45V
TBHT= 233.1A, 4.16V
IGP1= 3.1e-07 Torr
Autoramp TGHT to440A @0.2A/min
Stopped autoramp at TGHT = 427.4 A and 7.00V, OMEGA= 1492 C
Wednesday, March 27, 2019, 14:14
Restarted TGHT autoramp @.2A/min up to 440A
Friday, March 29, 2019, 12:06
Changed OMEGA slope to 1.09 after checking with the analog pyrometer
IGP1 = 1.65e-07 Torr
TGHT = 441.3A, 7.5V
TBHT= 233.0A, 4.2V
Tapping TGHT to 450A @ ~1A/min while monitoring pressure
TGHT remained at 451A, 7.8 V and TBHT at 233.2A, 4.2 V, for 10.5 hours while OMEGA Temperature ~1810 C.
Ramp-down was initiated with IGP1 = 1.7e-07 Torr
Ramp rate = 2A/min for TGHT and 1/min for TBHT
Monday, April 01, 2019, 08:53
TGHT = 0A, 0.05V
TBHT= 0.01A, 0V
IGP1= 4.05e-08 Torr
Unloading Target
Target Final weight = 473 g
% Mass of ZrC+C+organics lost = 14.20 % compared to 13.95% theoretical organics content.
Final weight of 10 discs = 0.9250 g
% mass lost on this discs = 13.66%
The tube was slightly bent along the short axis
The discs expanded but more towards one side (possibly due to discrepancy in spring strength).
One protective graphite disc added to each end
One end cap on each end |
Attachment 1: IMG_3070.JPG
|
|
Attachment 2: IMG_3066.JPG
|
|
452
|
Tuesday, July 30, 2019, 15:42 |
Darwin Ortiz Rosales | ZrC | 43044-6 | LP-SIS | Done | Sintering ZrC Discs |
Tuesday, July 30, 2019, 15:33
ZrC backup Target 12.6 cm disc length, 465 g total weight (no springs and no analysis discs).
Total weight= 470 g.
20 Analysis discs weighing 2.368 g (10 at each end).
Two springs (one at each end).
OMEGA slope initially = 0.990 (was changed to 1.09 at higher Temperature as per eLog #434
Target is being pumped down.
Wednesday, July 31, 2019, 09:31
Desired temp = 1900 C, Auto ramping TGHT at 0.1 A/min to reach 400A then TGHT will be tapped up accordingly to reach desired temperature. (eLog 434)
TBHT will be set fixed at 230A (max). TBHT at 0.1 A/min to reach 230A.
Note: Initially both TGHT and TBHT will be ramped up at 0.3A/min up to 30A each.
IGP1= 1.35e-06 Torr
Good vac at 3.00-5 Torr
Bad vac at 5.0e-5 Torr.
Wednesday, July 31, 2019, 12:02
At 30A pressure was increasing a bit fast, therefore, the ramp was changed to increments of .1A every 120s (.05A/min).
Thursday, August 01, 2019, 08:42
TGHT = 54.7
TBHT = 54.3
IGP1 = 3.86e-5 Torr
Will changer heat ramp to .1A/min by changing wait interval to 60s
Tuesday, August 06, 2019, 07:14
OMEGA = 1212 C
TGHT = 344.7 A, 5.79 V
TBHT = 233 A, 4.17 V
IGP1 = 1.05 e-06 Torr
Autoramping to 400A at increments of 0.1A/min
Tuesday, August 06, 2019, 09:50
OMEGA = 1233 C
TGHT = 360 A, 6.05 V
TBHT = 233 A, 4.18 V
IGP1 = 1.21 e-06 Torr
increasing autoramp increments to .5A/min
Tuesday, August 06, 2019, 12:27
OMEGA = 1356 C
TGHT = 400.6 A, 6.92 V
TBHT = 233.8 A, 4.20 V
IGP1 = 1.95 e-06 Torr
Autoramping to 430 A on TGHT at 0.5 A/min
Tuesday, August 06, 2019, 14:02
OMEGA = 1447 C
TGHT= 430.9 A, 7.66V
TBHT = 233.2A, 4.2 V
IGP1= 2.01e-06 Torr
Autoramping to 440 A on TGHT at 0.5 A/min
Wednesday, August 07, 2019, 09:10
OMEGA = 1548
TGHT = 441.56 A, 8.2 V
TBHT = 233.3 A, 4.2 V
IGP1 = 6.21e-07 Torr
Manually ramping up to 1900C @ 1A/min
Wednesday, August 07, 2019, 09:43
Changed OMEGA slope to 1.09 as per eLog #434
OMEGA reads 1773 C @ TGHT 451A, 8.4V
IGP1 = 7.02 e-07
Wednesday, August 07, 2019, 10:56
OMEGA = 1903 C
TGHT = 483.5 A, 9.2V
TBHT = 233.3 A, 4.3V
IGP1 = 1.7 e-06 Torr trending down
Wednesday, August 07, 2019, 11:40
OMEGA = 1914 C
TGHT = 483.5 A, 9.3V
TBHT = 233.3 A, 4.3V
IGP1 = 1.5 e-06 Torr trending down
Decrease TGHT current to 480.4 A
Wednesday, August 07, 2019, 13:04
OMEGA = 1918 C
TGHT = 480.3 A, 9.4V
TBHT = 233.3 A, 4.3V
IGP1 = 1.28e-06 Torr
Decrease TGHT current to 474.5 A
Wednesday, August 07, 2019, 13:26
OMEGA = 1904 C
TGHT = 474.8 A, 9.3V
TBHT = 233.3 A, 4.3V
IGP1 = 1.11e-06 Torr
Wednesday, August 07, 2019, 13:47
OMEGA = 1912 C
TGHT = 474.8 A, 9.3V
TBHT = 233.3 A, 4.3V
IGP1 = 1.10e-06 Torr
Decrease TGHT to 471.8 A
OMEGA temperature went down to 1904 C
Wednesday, August 07, 2019, 14:26
OMEGA = 1911 C
TGHT = 471.8 A, 9.3V
TBHT = 233.3 A, 4.3V
IGP1 = 1.00e-06 Torr
Decrease TGHT to 469.0 A
OMEGA temperature down to 1904C
Wednesday, August 07, 2019, 15:45
OMEGA = 1912 C
TGHT = 468.8.8 A, 9.2V
TBHT = 233.3 A, 4.3V
IGP1 = 9.2e-07 Torr
Decrease TGHT to 466.0 A
OMEGA temperature down to 1903C
Wednesday, August 07, 2019, 22:09
OMEGA = 1924 C
TGHT = 466.8. A, 9.3V
TBHT = 233.3 A, 4.3V
IGP1 = 7.6e-07 Torr
Cooling at 2A/min TGHT to 456.0 A, 9.0 V and 1A/min TBHT to 230.1 A, 4.2 V
OMEGA = 1900 C
Will allow Pressure to stabilize
Thursday, August 08, 2019, 06:54
OMEGA = 1919 C
TGHT = 456.9 A, 9.1V
TBHT = 230.3 A, 4.2 V
IGP1 =5.7e-07 Torr
Cooling at 2A/min TGHT and 1A/min TBHT
Thursday, August 08, 2019, 13:30
Target removed from Evap2. Awaiting inspection by John.
|
453
|
Monday, August 12, 2019, 15:55 |
John Wong | ZrC | 43044-6 | LP-SIS | Done | Sintering ZrC Discs |
Darwin Ortiz Rosales wrote:
|
Tuesday, July 30, 2019, 15:33
ZrC backup Target 12.6 cm disc length, 465 g total weight (no springs and no analysis discs).
Total weight= 470 g.
20 Analysis discs weighing 2.368 g (10 at each end).
Two springs (one at each end).
OMEGA slope initially = 0.990 (was changed to 1.09 at higher Temperature as per eLog #434
Target is being pumped down.
Wednesday, July 31, 2019, 09:31
Desired temp = 1900 C, Auto ramping TGHT at 0.1 A/min to reach 400A then TGHT will be tapped up accordingly to reach desired temperature. (eLog 434)
TBHT will be set fixed at 230A (max). TBHT at 0.1 A/min to reach 230A.
Note: Initially both TGHT and TBHT will be ramped up at 0.3A/min up to 30A each.
IGP1= 1.35e-06 Torr
Good vac at 3.00-5 Torr
Bad vac at 5.0e-5 Torr.
Wednesday, July 31, 2019, 12:02
At 30A pressure was increasing a bit fast, therefore, the ramp was changed to increments of .1A every 120s (.05A/min).
Thursday, August 01, 2019, 08:42
TGHT = 54.7
TBHT = 54.3
IGP1 = 3.86e-5 Torr
Will changer heat ramp to .1A/min by changing wait interval to 60s
Tuesday, August 06, 2019, 07:14
OMEGA = 1212 C
TGHT = 344.7 A, 5.79 V
TBHT = 233 A, 4.17 V
IGP1 = 1.05 e-06 Torr
Autoramping to 400A at increments of 0.1A/min
Tuesday, August 06, 2019, 09:50
OMEGA = 1233 C
TGHT = 360 A, 6.05 V
TBHT = 233 A, 4.18 V
IGP1 = 1.21 e-06 Torr
increasing autoramp increments to .5A/min
Tuesday, August 06, 2019, 12:27
OMEGA = 1356 C
TGHT = 400.6 A, 6.92 V
TBHT = 233.8 A, 4.20 V
IGP1 = 1.95 e-06 Torr
Autoramping to 430 A on TGHT at 0.5 A/min
Tuesday, August 06, 2019, 14:02
OMEGA = 1447 C
TGHT= 430.9 A, 7.66V
TBHT = 233.2A, 4.2 V
IGP1= 2.01e-06 Torr
Autoramping to 440 A on TGHT at 0.5 A/min
Wednesday, August 07, 2019, 09:10
OMEGA = 1548
TGHT = 441.56 A, 8.2 V
TBHT = 233.3 A, 4.2 V
IGP1 = 6.21e-07 Torr
Manually ramping up to 1900C @ 1A/min
Wednesday, August 07, 2019, 09:43
Changed OMEGA slope to 1.09 as per eLog #434
OMEGA reads 1773 C @ TGHT 451A, 8.4V
IGP1 = 7.02 e-07
Wednesday, August 07, 2019, 10:56
OMEGA = 1903 C
TGHT = 483.5 A, 9.2V
TBHT = 233.3 A, 4.3V
IGP1 = 1.7 e-06 Torr trending down
Wednesday, August 07, 2019, 11:40
OMEGA = 1914 C
TGHT = 483.5 A, 9.3V
TBHT = 233.3 A, 4.3V
IGP1 = 1.5 e-06 Torr trending down
Decrease TGHT current to 480.4 A
Wednesday, August 07, 2019, 13:04
OMEGA = 1918 C
TGHT = 480.3 A, 9.4V
TBHT = 233.3 A, 4.3V
IGP1 = 1.28e-06 Torr
Decrease TGHT current to 474.5 A
Wednesday, August 07, 2019, 13:26
OMEGA = 1904 C
TGHT = 474.8 A, 9.3V
TBHT = 233.3 A, 4.3V
IGP1 = 1.11e-06 Torr
Wednesday, August 07, 2019, 13:47
OMEGA = 1912 C
TGHT = 474.8 A, 9.3V
TBHT = 233.3 A, 4.3V
IGP1 = 1.10e-06 Torr
Decrease TGHT to 471.8 A
OMEGA temperature went down to 1904 C
Wednesday, August 07, 2019, 14:26
OMEGA = 1911 C
TGHT = 471.8 A, 9.3V
TBHT = 233.3 A, 4.3V
IGP1 = 1.00e-06 Torr
Decrease TGHT to 469.0 A
OMEGA temperature down to 1904C
Wednesday, August 07, 2019, 15:45
OMEGA = 1912 C
TGHT = 468.8.8 A, 9.2V
TBHT = 233.3 A, 4.3V
IGP1 = 9.2e-07 Torr
Decrease TGHT to 466.0 A
OMEGA temperature down to 1903C
Wednesday, August 07, 2019, 22:09
OMEGA = 1924 C
TGHT = 466.8. A, 9.3V
TBHT = 233.3 A, 4.3V
IGP1 = 7.6e-07 Torr
Cooling at 2A/min TGHT to 456.0 A, 9.0 V and 1A/min TBHT to 230.1 A, 4.2 V
OMEGA = 1900 C
Will allow Pressure to stabilize
Thursday, August 08, 2019, 06:54
OMEGA = 1919 C
TGHT = 456.9 A, 9.1V
TBHT = 230.3 A, 4.2 V
IGP1 =5.7e-07 Torr
Cooling at 2A/min TGHT and 1A/min TBHT
Thursday, August 08, 2019, 13:30
Target removed from Evap2. Awaiting inspection by John.
|
Monday, August 12, 2019, 15:45
Visual inspection on the target was performed today. See attachment for details.
Target container is slightly bent, and some visible crystallization on the container surface.
The discs are nicely packed with only a slight expansion in length was measured.
No clogging inside the container nor the ionizer tube.
Some sintered discs samples were collected and SEM will be perform later.
|
Attachment 1: ZrC_43044-6_inspection.pdf
|
|
492
|
Saturday, July 25, 2020, 08:58 |
Darwin Ortiz Rosales | ZrC | 44139-7-SK | | In progress | ZrC for Luca's experiments | Friday, July 24, 2020, 15:00
Ta tube cotaining 497 ZrC discs wrapped with Ta heat-shields (3 layers)
Desired temperature= 1800C (expected TGHT 410 A), TBHT will be set fixed at 230A (max).
good vacuum = 3.00 e-05 Torr
bad vacuum = 5.00 e-05 Torr
Evap 2 was left to pump down over night.
Saturday, July 25, 2020, 08:57
IGP1= 8.7 e-07 Torr
Start ramp at 0.25 A/min to 20 A on TGHT
Saturday, July 25, 2020, 10:07
IGP1= 2.7e -06 Torr
Set ramp target to 30 A
Wednesday, July 29, 2020, 13:11
OMEGA reading 1700 C at 430 A during the night. It was kept at this temperature for 3.5 hours. The OMEGA slope was not changed from 0.990
when IGP1 = 1.2 e-06 Torr and stable, cooling was started at -3A/min at 9 am on this day.
IGP1= 2.2 e-07 Torr now at time of dismounting
|
679
|
Saturday, November 23, 2024, 11:11 |
Darwin Ortiz Rosales | ZrC | | LP TUBE | Done | ZrC 24E9T1 + std conditioning and sintering | Saturday, November 23, 2024, 11:08
No milling ZrC material sintering inside graphite cartridge
baseline standard discs included for comparison.
4 Ta foils wrapped around container
one spring at the back end to retain the graphite cartridge
One Ta cap with perforations at the front for T readings
initial heating at 2A/min to 50A, followed by heating at 1A/min to 90 A
Initial IGP1= 1.0e-6 Torr
OMEGA slope =0.990
Good and bad vacuum =5.0e-5 Torr and 5e-4 torr
Saturday, November 23, 2024, 11:20
autoramp start at 2A/min to 50A on tght
Saturday, November 23, 2024, 20:11
allowed pressure to drop to 3.3e-6 Torr after degassing.
Started ramp to 90A at 1A/min
Saturday, November 23, 2024, 23:46
started ramping at 1.5A/120s or 0.75A/min to 400A
Sunday, November 24, 2024, 07:55
Reached 1900 C at 410 A setpoint and 402 A on RD
Pressure did not increase after bumping up to 410 setpoint so will keep at this current until 11 am (four hours near 1900 C in total)
Sunday, November 24, 2024, 10:58
Final IGP1 at start of rampdown = 2.9e-6 Torr
Ramping down at -2A/min |
52
|
Tuesday, October 16, 2012, 14:18 |
John Wong | TiC | 39165-4 | LP-SIS | Done | Sintering TiC#3 | Tuesday, October 16, 2012, 14:12
Target is filled with 360 discs of TiC (with 1 mole of graphite) backed on C-grv foil.
No Ta heat-shields wrapped around the container.
One regular end-cap is inserted and expanded. The other end is inserted with a D-cap for out-gassing.
Re ionizer foil is inserted.
TGHT will be ramped up to 580A, TBHT to 230A; ramping rate at 0.2A/min.
Chamber is currently being pumped down...
Tuesday, October 16, 2012, 16:11
HS water valve is opened. No leaks is detected.
Vacuum is coming down steadily. IGP1 currently at 1.7e-5 Torr.
Wednesday, October 17, 2012, 11:41
The chamber was pumped down overnight. IGP1 reads at 5.8e-7 Torr.
Both TGHT & TBHT were stepped up to 30A. P/S OK!
Initiated auto-ramping...
Monday, October 22, 2012, 10:58
TGHT and TBHT have reached to 580A & 230A, respectively (see attachment#1).
IGP1 currently at 6.27e-6 Torr. BP@20mTorr.
Currents will remain at max for another 3 hours.
Local temperature measured at 1500C (container surface), 1300C (center block)
Monday, October 22, 2012, 17:27
Auto cooling initiated.
Tuesday, October 23, 2012, 17:54
TGHT & TBHT are at 0A. P/S & pumps off.
The chamber will be vented, and the target will be taken out for inspections.
|
Attachment 1: TiC#3_maxcurrent.PNG
|
|
125
|
Friday, March 21, 2014, 16:18 |
John Wong | TiC | 38817-8 | HP-SIS | In progress | Sintering TiC | Friday, March 21, 2014, 16:09
Target container is loaded with 360 Discs of TiC.
Target length = 11.7cm.
Total green mass = 40.945g
Container is wrapped with 3 Ta-heat shields, and have been pumped down in the chamber.
For the sintering process:
TGHT ramp up to 820A, and TGHT to 300A at 0.1A/min.
Friday, March 21, 2014, 16:15
TGHT/TBHT were manually stepped up to 40A.
Vac stabilizes at 1.7e-6 Torr.
Initiate auto-ramping...
|
126
|
Wednesday, March 26, 2014, 11:07 |
Laura Lambert | TiC | 38817-8 | HP-SIS | In progress | Sintering TiC |
John Wong wrote: |
Friday, March 21, 2014, 16:09
Target container is loaded with 360 Discs of TiC.
Target length = 11.7cm.
Total green mass = 40.945g
Container is wrapped with 3 Ta-heat shields, and have been pumped down in the chamber.
For the sintering process:
TGHT ramp up to 820A, and TGHT to 300A at 0.1A/min.
Friday, March 21, 2014, 16:15
TGHT/TBHT were manually stepped up to 40A.
Vac stabilizes at 1.7e-6 Torr.
Initiate auto-ramping...
|
Wednesday, March 26, 2014, 11:05
TBHT reached max desired current of 300A
IGP1 = 1.4e-6 Torr
TGHT = 543A
Increasing TGHT auto-ramp to 2.0A/min
|
127
|
Wednesday, March 26, 2014, 18:23 |
John Wong | TiC | 38817-8 | HP-SIS | Done | Sintering TiC#4 |
Laura Lambert wrote: |
John Wong wrote: |
Friday, March 21, 2014, 16:09
Target container is loaded with 360 Discs of TiC.
Target length = 11.7cm.
Total green mass = 40.945g
Container is wrapped with 3 Ta-heat shields, and have been pumped down in the chamber.
For the sintering process:
TGHT ramp up to 820A, and TGHT to 300A at 0.1A/min.
Friday, March 21, 2014, 16:15
TGHT/TBHT were manually stepped up to 40A.
Vac stabilizes at 1.7e-6 Torr.
Initiate auto-ramping...
|
Wednesday, March 26, 2014, 11:05
TBHT reached max desired current of 300A
IGP1 = 1.4e-6 Torr
TGHT = 543A
Increasing TGHT auto-ramp to 2.0A/min
|
Wednesday, March 26, 2014, 18:18
TGHT has reached to 820A\13.4V and target has been heated at that current for 4.5 hours.
Vac is coming down to 1.1e-6 Torr.
See link for RGA results: https://www.dropbox.com/sh/08dcxskux21aqap/1SF_dTJB4l
Cooling down in process at 2A/min for TGHT and 1A/min for TBHT.
Thursday, March 27, 2014, 11:14
Target is cooled down. TGHT/TBHT have reached to 0A.
All pumps off; chamber will be vented soon.
Friday, March 28, 2014, 15:00
Target has been assembled. Heat shield WO#39956-10
|
589
|
Thursday, August 25, 2022, 10:16 |
Darwin Ortiz Rosales | TiC | 44692-10 | HP-FEBIAD | Done | TiC 220818 Sintering (TiC #6) | Thursday, August 25, 2022, 10:06
Target container is loaded with 379 Discs of TiC for Target and 5 extra discs for analysis on left end
Target length = 12.5
3 Ta foil heatshields and on TaC coated Ta spring on right side
Total weight including heatshields and spring = 1551.4 g Final total weight = 1545.5 g
Final power should be ~10988 Watt
TGHT ramp up to 820A, and TGHT to 300A at 0.1A/min.
IGP1= 7.7e-7 Torr
Good vacuum =3.0e-05 Torr
Bad vacuum = 5e-04 Torr
Initial TGHT and TBHT autoramped @1A/min to 50A
TBHT mas 230A
TGHT max depends on final power
Thursday, August 25, 2022, 11:17
Start autoramp at 1A/min to 80A on both TGHT and TBHT
Thursday, August 25, 2022, 11:54
leaving at 80A until pressure stops rising
Thursday, August 25, 2022, 22:29
left to autoramp to 230A TBHT and 750 A TGHT since approximately 2:00 pm
Will leave ramping @1A/min to 750 A on TGHT
TBHT currently at 230A
Friday, August 26, 2022, 07:27
TGHT = 850A, 9.3V
Started autoramp to 850A at 1A/min for TGHT
TBHT held at 230A
OMEGA = 1584C
Friday, August 26, 2022, 09:34
Target running at ~820A, 13.1 V since 9
Cooling to start between 1:15 to 1:30 pm
OMEGA reads 1668 C at top current
current reading oscillates between 812A and 828A and 13.1V to 13.2V.
Monday, August 29, 2022, 12:21
Cooling at -2A/min for TGHT and -1A/min TBHT started on time on Friday August 26th.
Target remained under vacuum after cooling, over the weekend.
Target removed this morning and looks good. 5 discs removed for analysis
|
|