544
|
Tuesday, March 30, 2021, 19:49 |
Ferran Boix Pamies | Empty | 44139-7-SK | | Done | Parasitic target thermal tests | 2021-03-30 7:48 Target loaded with
parasitic target only. No container. Leaving
under vacuum over night. |
|
|
545
|
Sunday, April 04, 2021, 16:09 |
Ferran Boix Pamies | Empty | 41882-2 | TARGET BOAT | Done | parasitic target commissioning | 2021-04-04 16:07 New container is
in with heatshields, vacuum 8.6E-6 torr.
leak check done. ramping up current, checking |
|
|
547
|
Tuesday, April 13, 2021, 10:44 |
Marla Cervantes | Empty | NA (Ta- tube Eagle Alloys) | | Done | Re-coat 4 | Tuesday, April 13, 2021, 09:51
IGP1 = 2.5e-7 Torr
|
|
|
548
|
Thursday, April 15, 2021, 18:33 |
Marla Cervantes | Ta | 44139-6-SK | TARGET BOAT | Done | Carbon penetration on Ta | Thursday, April 15, 2021, 18:24
Tantalum samples were loaded in a
tantalum testing tube and installed in the |
|
|
549
|
Wednesday, April 28, 2021, 11:57 |
Darwin Ortiz Rosales | SiC | 42218-7 | HP-SIS | Done | sintering discs for SiC#41 (or back-up for #40) | Wednesday, April 28, 2021, 11:54
Total number of foils: 449 (not including
analysis discs) |
|
|
550
|
Friday, June 11, 2021, 08:41 |
Darwin Ortiz Rosales | Nb | | TARGET BOAT | Done | Nb treatment for Norman | Friday, June 11, 2021, 08:05
Target boat with a layer of |
|
|
552
|
Wednesday, July 21, 2021, 16:45 |
Ferran Boix Pamies | Empty | | TARGET BOAT | Done | parasitic target thermal tests v2, foil measurement. | 2021-07-21 4:44pm Vacumm at 1e-5Torr.
Water cooling leak check ok.
|
|
|
553
|
Thursday, August 05, 2021, 11:18 |
Darwin Ortiz Rosales | SiC | 44691-2 | LP-SIS | Done | Dr blade and non-Dr blade Material Experiment (sintering) | Thursday, August 05, 2021, 11:10
Total number of foils: 380
Total length packed 13.5 cm |
|
|
554
|
Thursday, September 02, 2021, 07:14 |
Darwin Ortiz Rosales | TaC | 44691-7 | LP-SIS | Done | TaC coating/sintering | Thursday, September 02, 2021, 06:36
Ta tube was coated with TaC |
|
|
555
|
Wednesday, September 08, 2021, 12:43 |
Darwin Ortiz Rosales | | 44139-8-SK | TARGET BOAT | Done | C Conditioning | Wednesday, September 08, 2021, 12:36
297 C discs were loaded onto |
|
|
556
|
Tuesday, September 14, 2021, 09:33 |
Darwin Ortiz Rosales | | 42218-5 | LP-IG-LIS | Done | TaC coating/sintering | Tuesday, September 14, 2021, 09:32
Ta IGLIS tube was coated with |
|
|
558
|
Thursday, October 21, 2021, 09:58 |
Darwin Ortiz Rosales | TaC | | TARGET BOAT | Done | Coating of Ta caps and Ta springs (10 caps and 2 springs) |
Thursday, October 21, 2021, 10:02
10 TaC coated Ta caps, wrapped in |
|
|
559
|
Monday, October 25, 2021, 11:53 |
Darwin Ortiz Rosales | TaC | 42218-4 | HP-IG-LIS | Done | TaC coating/sintering | Monday, October 25, 2021, 11:52
Ta IGLIS tube was coated with |
|
|
560
|
Wednesday, October 27, 2021, 11:09 |
Darwin Ortiz Rosales | Ta | 44691-3 | LP-SIS | Done | TaC coating/sintering | Wednesday, October 27, 2021, 11:07
Monday, October 25, 2021, 11:52 |
|
|
561
|
Monday, November 01, 2021, 07:39 |
Darwin Ortiz Rosales | Empty | 44508-3 | LP-SIS | Done | TaC coating/sintering | Monday, November 01, 2021, 07:37
Ta tube was coated with TaC |
|
|
562
|
Wednesday, November 03, 2021, 09:24 |
Darwin Ortiz Rosales | Empty | 44691-10 | LP-SIS | Done | TaC coating/sintering | Ta tube was coated with
TaC and wrapped with Ta heat-shields (3 layers) |
|
|
563
|
Monday, November 08, 2021, 09:36 |
Darwin Ortiz Rosales | Endcaps | | TARGET BOAT | Done | Coating of Ta caps and Ta springs (8 caps and 2 springs) | Monday, November 08, 2021, 09:35
Two groups of 4 caps wrapped in graphite
with graphite discs in between. |
|
|
566
|
Wednesday, February 09, 2022, 08:08 |
Darwin Ortiz Rosales | Nb | | TARGET BOAT | Done | Nb annealing for Phillip | Wednesday, February 09, 2022, 06:55
Target boat with a layer of |
|
|
567
|
Thursday, February 10, 2022, 08:58 |
Darwin Ortiz Rosales | SiC | | HP-FEBIAD | Done | | Thursday, February 10, 2022, 08:52
Total number of foils: 528 ( |
|
|
568
|
Tuesday, February 15, 2022, 12:37 |
Darwin Ortiz Rosales | Nb | | TARGET BOAT | Done | Nb annealing for Phillip | Wednesday, February 09, 2022, 06:55
Target boat with a layer of |
|
|