  21   Wednesday, May 16, 2012, 14:04 John Wong   Problems resolvedTBHT cooling line leaky

    

       
            
  
  28   Monday, May 28, 2012, 11:15 John Wong   ProblemsChiller is leaking water Monday, May 28, 2012, 11:08
It was discovered this morning that
the Evaporator #2 chiller was leaking water
 Chiller_leaky.jpg 
  35   Tuesday, July 17, 2012, 16:00 John Wong targetboat (TaC coated) DoneSintering TaC coated regular- & D-endcapsTuesday, July 17, 2012, 15:45
Target boat is filled with TaC coated
regular- and D-endcaps. 
  
  38   Monday, July 30, 2012, 15:42 John Wong   ProblemsChiller maybe leakyMonday, July 30, 2012, 15:38
The evaporator was used for the processing
the NiO target for 8 days and it was discovered
 chiller.jpg 
  39   Friday, August 10, 2012, 19:57 Nikita Bernier   DoneSintering Ta foil with TaO coating Friday, August 10, 2012, 19:54
 
  
  40   Saturday, August 11, 2012, 19:21 Nikita Bernier   DoneSintering Ta foil with TaO coating

    

       
            
 TaO1.pngTaO2.png 
  41   Monday, August 13, 2012, 13:50 Nikita Bernier   DoneSintering Ta foil with TaO coating

    

       
            
 TaO3.png 
  42   Tuesday, August 14, 2012, 15:11 John Wong   MaintenanceReplacing Cu-heatshield insulatorsTuesday, August 14, 2012, 15:01
The Cu-heatshield insulators are
broken due to prolong heating time during
 insulators.PNGMM800_insulator.PNG 
  44   Tuesday, August 14, 2012, 17:11 John Wong   FailedSintering Ta2O5 coating on Ta foil failed

    

       
            
 Ta2O5_coating.PNG 
  53   Friday, January 11, 2013, 11:16 John Wong   MaintenanceReplace terminal insulatorFriday, January 11, 2013, 10:59
The insulator that holds the terminals
was broken when a target container was installed. 
 broke_insulator.PNG 
  55   Friday, January 11, 2013, 15:16 Anders Mjos   MaintenanceReplace terminal insulator

    

       
            
 ITD0052C_revB.pdfinstalled_insulators.jpegta_heat_shields.jpeg 
  56   Tuesday, January 22, 2013, 16:14 John Wong  LP-SISDoneHeating RFQ components & measuring temperatures Tuesday, January 22, 2013, 12:38
This is to test the newly developed
RFQ target to be commissioned this year.
 2169.jpgautorampingup_800.PNG 
  76   Tuesday, May 28, 2013, 17:50 John Wong Target Boat #2  DoneSintering TaC coated end capsTuesday, May 28, 2013, 17:36
The target containers endcaps were
coated with TaC solution and let dry. 
  
  83   Tuesday, August 27, 2013, 17:01 John Wong targetboat (TaC coated) DoneSintering TaC coated regular caps Tuesday, August 27, 2013, 16:48
Target boat is filled with TaC coated
endcaps (brown) and some partial sinterred
 Sintering__endcap_.jpg 
  84   Thursday, August 29, 2013, 11:53 Laura Lambert targetboat (TaC coated) DoneSintering TaC coated regular caps

    

       
            
  
  92   Tuesday, October 29, 2013, 15:50 Anders Mjos   In progressCopper bars on TGHT and TBHT Tuesday, October 29, 2013, 15:50:
Pumping down
Wednesday, October 30, 2013, 09:32:
 Current_and_Voltage.pdf 
  93   Friday, November 01, 2013, 17:20 Anders Mjos   ProblemsBacking pump needs new filterThe source of the poor vacuum in the backing
line seems to be related to a dirty filter.
We will try to find a replacement filter
  
  94   Monday, November 04, 2013, 14:02 Anders Mjos   MaintenanceBacking pump replaced 

    
  
  96   Thursday, November 07, 2013, 09:38 Anders Mjos   Problems resolvedHeat Shield cooling line twistedSee attached photo.
The Heat Shield has been taken to
the Machine Shop for repair.
 Twisted_Tube.jpgTwisted_Tube_Repaired.jpg 
  115   Tuesday, January 28, 2014, 15:46 Laura Lambert 40282-4TARGET BOATFailedSintering TaC coated end caps Tuesday, January 28, 2014, 15:43
The target containers end-caps were
coated with TaC spray and let dry.
 end_capsIMG_20140131_101959838.jpgfeb11-2014(3).jpgfeb11-2014(2).jpg 