  56   Tuesday, January 22, 2013, 16:14 John Wong  LP-SISDoneHeating RFQ components & measuring temperatures Tuesday, January 22, 2013, 12:38
This is to test the newly developed
RFQ target to be commissioned this year.
 2169.jpgautorampingup_800.PNG 
  57   Monday, February 18, 2013, 16:43 John WongEmpty LP-SISDoneSintering TaC coating on the RFQ target container Monday, February 18, 2013, 16:28
The RFQ target container is coated
with TaC and ready to be sintered.  No
 SiC#28_-_LPSIS-RFQ.pngSintering_of_TaC.PNGautorampingdown_10.PNG 
  58   Friday, February 22, 2013, 15:55 John WongSiC LP-SISDoneSintering SiC#28-RFQFriday, February 22, 2013, 15:49
The LP-SIS RFQ target container was
previously coated with TaC and sintered up
 RFQ_SiC#28_-production_process.mp4 
  67   Friday, April 19, 2013, 09:39 Rick MaharajEmpty  Donethermocouple Feedthru A thermocouple feedthru was installed
via 9 pin sub-D connector. It runs from the
the conflat cross on the top of the evaporator
  
  72   Tuesday, May 07, 2013, 16:53 Nikita BernierBeO  DoneSintering BeO pellets #6 Tuesday, May 07, 2013, 16:48
 
  
  73   Monday, May 13, 2013, 12:53 Nikita BernierBeO  DoneSintering BeO pellets #6

    

       
            
 600Down.png 
  74   Monday, May 13, 2013, 17:17 Nikita BernierBeO  DoneSintering BeO pellets #6

    

       
            
  
  91   Friday, October 04, 2013, 16:21 John WongEmpty LP-SISDoneSintering TaC coating on a LP target container to be used for C-grv tube test Friday, October 04, 2013, 15:37
A LP target container is coated with
TaC.  The container is wrapped with
 LP_C_grv_tempcurve.PNGLP_C_grv_TGHT632_1960C.PNG 
  92   Tuesday, October 29, 2013, 15:50 Anders Mjos   In progressCopper bars on TGHT and TBHT Tuesday, October 29, 2013, 15:50:
Pumping down
Wednesday, October 30, 2013, 09:32:
 Current_and_Voltage.pdf 
  93   Friday, November 01, 2013, 17:20 Anders Mjos   ProblemsBacking pump needs new filterThe source of the poor vacuum in the backing
line seems to be related to a dirty filter.
We will try to find a replacement filter
  
  94   Monday, November 04, 2013, 14:02 Anders Mjos   MaintenanceBacking pump replaced 

    
  
  96   Thursday, November 07, 2013, 09:38 Anders Mjos   Problems resolvedHeat Shield cooling line twistedSee attached photo.
The Heat Shield has been taken to
the Machine Shop for repair.
 Twisted_Tube.jpgTwisted_Tube_Repaired.jpg 
  120   Friday, March 07, 2014, 10:34 Anders Mjos   Problems resolvedTGHT2 water flow signalThere was no signal going from the coils
to the PLC. After manipulating the connection
points on the coil a signal could again be
  
  123   Monday, March 10, 2014, 11:45 John Wong   MaintenanceReplaced Backing Pump hoseMonday, March 10, 2014, 11:44
Rick replaced the backing pump hose
from 1.5" to 2.0" for better flow. 
  
  124   Monday, March 10, 2014, 11:52 John Wong   Problems resolvedThe Chiller is downMonday, March 10, 2014, 11:45
The chiller tripped off on March
7, 2014.
  
  128   Thursday, March 27, 2014, 18:04 John Wong  TARGET BOATIn progressStudying WC sintering on Ta surfaceThursday, March 27, 2014, 17:38
TEST #1
WC slurry was prepared in non-aqueous
  
  129   Thursday, April 24, 2014, 18:13 John Wong  TARGET BOATDoneTests: Sintering carbon Mesh coated with WC Thursday, April 24, 2014, 17:25
The purpose of this experiment is
to see if the carbon mesh is suitable for
  
  130   Thursday, May 29, 2014, 18:16 Cameron Hodgins  TARGET BOATIn progressSintering several carbides on tantalum foil backingPurpose: Sinter one sample of each of TiC,
VC, Cr3C2, ZrC, NbC, Mo2C, TaC, and WC on
5x10 mm tantalum foil to see if the samples
 01-samples.jpg 
  131   Friday, May 30, 2014, 13:15 Cameron Hodgins   In progressSintering several carbides on tantalum foil backing Pressure down to 7.1e-7 Torr. Water
valve to heat shield was opened; pressure
remained stable. 
  
  132   Friday, June 06, 2014, 16:01 Cameron Hodgins  TARGET BOATIn progressSintering several carbides on tantalum foil backingAuto-ramp started. Max current = 500 A,
voltage = 11.05 V. Current is being increased
at 2 A/min. In the first 20 minutes, the
  