  41   Monday, August 13, 2012, 13:50 Nikita Bernier   DoneSintering Ta foil with TaO coating

    

       
            
 TaO3.png 
  42   Tuesday, August 14, 2012, 15:11 John Wong   MaintenanceReplacing Cu-heatshield insulatorsTuesday, August 14, 2012, 15:01
The Cu-heatshield insulators are
broken due to prolong heating time during
 insulators.PNGMM800_insulator.PNG 
  44   Tuesday, August 14, 2012, 17:11 John Wong   FailedSintering Ta2O5 coating on Ta foil failed

    

       
            
 Ta2O5_coating.PNG 
  46   Monday, September 24, 2012, 15:12 Nikita BernierTaC  DoneSintering Ta foil with TaC coating Monday, September 24, 2012, 15:01
The target boat with TaC coating
is being used again. The inside of the boat
 striptool1.PNG 
  47   Monday, September 24, 2012, 18:09 Nikita BernierTaC  DoneSintering Ta foil with TaC coating

    

       
            
 striptool2.PNGstriptool4.PNGstriptool5.PNG 
  48   Wednesday, September 26, 2012, 15:06 Nikita BernierTaC  DoneSintering Ta foil with TaC coating

    

       
            
 striptool6.pngSans_titre2.png 
  49   Wednesday, September 26, 2012, 15:14 Nikita BernierBeO  DoneSintering BeO Pellets #4 Wednesday, September 26, 2012, 15:07
 
 Sans_titre3.png 
  50   Friday, September 28, 2012, 12:59 Nikita BernierBeO  DoneSintering BeO Pellets #4

    

       
            
 striptool7.pngstriptool8.PNGRetired.png 
  53   Friday, January 11, 2013, 11:16 John Wong   MaintenanceReplace terminal insulatorFriday, January 11, 2013, 10:59
The insulator that holds the terminals
was broken when a target container was installed. 
 broke_insulator.PNG 
  55   Friday, January 11, 2013, 15:16 Anders Mjos   MaintenanceReplace terminal insulator

    

       
            
 ITD0052C_revB.pdfinstalled_insulators.jpegta_heat_shields.jpeg 
  56   Tuesday, January 22, 2013, 16:14 John Wong  LP-SISDoneHeating RFQ components & measuring temperatures Tuesday, January 22, 2013, 12:38
This is to test the newly developed
RFQ target to be commissioned this year.
 2169.jpgautorampingup_800.PNG 
  57   Monday, February 18, 2013, 16:43 John WongEmpty LP-SISDoneSintering TaC coating on the RFQ target container Monday, February 18, 2013, 16:28
The RFQ target container is coated
with TaC and ready to be sintered.  No
 SiC#28_-_LPSIS-RFQ.pngSintering_of_TaC.PNGautorampingdown_10.PNG 
  58   Friday, February 22, 2013, 15:55 John WongSiC LP-SISDoneSintering SiC#28-RFQFriday, February 22, 2013, 15:49
The LP-SIS RFQ target container was
previously coated with TaC and sintered up
 RFQ_SiC#28_-production_process.mp4 
  67   Friday, April 19, 2013, 09:39 Rick MaharajEmpty  Donethermocouple Feedthru A thermocouple feedthru was installed
via 9 pin sub-D connector. It runs from the
the conflat cross on the top of the evaporator
  
  72   Tuesday, May 07, 2013, 16:53 Nikita BernierBeO  DoneSintering BeO pellets #6 Tuesday, May 07, 2013, 16:48
 
  
  73   Monday, May 13, 2013, 12:53 Nikita BernierBeO  DoneSintering BeO pellets #6

    

       
            
 600Down.png 
  74   Monday, May 13, 2013, 17:17 Nikita BernierBeO  DoneSintering BeO pellets #6

    

       
            
  
  91   Friday, October 04, 2013, 16:21 John WongEmpty LP-SISDoneSintering TaC coating on a LP target container to be used for C-grv tube test Friday, October 04, 2013, 15:37
A LP target container is coated with
TaC.  The container is wrapped with
 LP_C_grv_tempcurve.PNGLP_C_grv_TGHT632_1960C.PNG 
  92   Tuesday, October 29, 2013, 15:50 Anders Mjos   In progressCopper bars on TGHT and TBHT Tuesday, October 29, 2013, 15:50:
Pumping down
Wednesday, October 30, 2013, 09:32:
 Current_and_Voltage.pdf 
  93   Friday, November 01, 2013, 17:20 Anders Mjos   ProblemsBacking pump needs new filterThe source of the poor vacuum in the backing
line seems to be related to a dirty filter.