41
|
Monday, August 13, 2012, 13:50 |
Nikita Bernier | | | | Done | Sintering Ta foil with TaO coating |
|
|
42
|
Tuesday, August 14, 2012, 15:11 |
John Wong | | | | Maintenance | Replacing Cu-heatshield insulators | Tuesday, August 14, 2012, 15:01
The Cu-heatshield insulators are
broken due to prolong heating time during |
 |
44
|
Tuesday, August 14, 2012, 17:11 |
John Wong | | | | Failed | Sintering Ta2O5 coating on Ta foil failed |
|
|
46
|
Monday, September 24, 2012, 15:12 |
Nikita Bernier | TaC | | | Done | Sintering Ta foil with TaC coating | Monday, September 24, 2012, 15:01
The target boat with TaC coating
is being used again. The inside of the boat |
|
47
|
Monday, September 24, 2012, 18:09 |
Nikita Bernier | TaC | | | Done | Sintering Ta foil with TaC coating |
|
  |
48
|
Wednesday, September 26, 2012, 15:06 |
Nikita Bernier | TaC | | | Done | Sintering Ta foil with TaC coating |
|
 |
49
|
Wednesday, September 26, 2012, 15:14 |
Nikita Bernier | BeO | | | Done | Sintering BeO Pellets #4 | Wednesday, September 26, 2012, 15:07
|
|
50
|
Friday, September 28, 2012, 12:59 |
Nikita Bernier | BeO | | | Done | Sintering BeO Pellets #4 |
|
  |
53
|
Friday, January 11, 2013, 11:16 |
John Wong | | | | Maintenance | Replace terminal insulator | Friday, January 11, 2013, 10:59
The insulator that holds the terminals
was broken when a target container was installed. |
|
55
|
Friday, January 11, 2013, 15:16 |
Anders Mjos | | | | Maintenance | Replace terminal insulator |
|
  |
56
|
Tuesday, January 22, 2013, 16:14 |
John Wong | | | LP-SIS | Done | Heating RFQ components & measuring temperatures | Tuesday, January 22, 2013, 12:38
This is to test the newly developed
RFQ target to be commissioned this year. |
 |
57
|
Monday, February 18, 2013, 16:43 |
John Wong | Empty | | LP-SIS | Done | Sintering TaC coating on the RFQ target container | Monday, February 18, 2013, 16:28
The RFQ target container is coated
with TaC and ready to be sintered. No |
  |
58
|
Friday, February 22, 2013, 15:55 |
John Wong | SiC | | LP-SIS | Done | Sintering SiC#28-RFQ | Friday, February 22, 2013, 15:49
The LP-SIS RFQ target container was
previously coated with TaC and sintered up |
|
67
|
Friday, April 19, 2013, 09:39 |
Rick Maharaj | Empty | | | Done | thermocouple Feedthru | A thermocouple feedthru was installed
via 9 pin sub-D connector. It runs from the
the conflat cross on the top of the evaporator |
|
72
|
Tuesday, May 07, 2013, 16:53 |
Nikita Bernier | BeO | | | Done | Sintering BeO pellets #6 | Tuesday, May 07, 2013, 16:48
|
|
73
|
Monday, May 13, 2013, 12:53 |
Nikita Bernier | BeO | | | Done | Sintering BeO pellets #6 |
|
|
74
|
Monday, May 13, 2013, 17:17 |
Nikita Bernier | BeO | | | Done | Sintering BeO pellets #6 |
|
|
91
|
Friday, October 04, 2013, 16:21 |
John Wong | Empty | | LP-SIS | Done | Sintering TaC coating on a LP target container to be used for C-grv tube test | Friday, October 04, 2013, 15:37
A LP target container is coated with
TaC. The container is wrapped with |
 |
92
|
Tuesday, October 29, 2013, 15:50 |
Anders Mjos | | | | In progress | Copper bars on TGHT and TBHT | Tuesday, October 29, 2013, 15:50:
Pumping down
Wednesday, October 30, 2013, 09:32: |
|
93
|
Friday, November 01, 2013, 17:20 |
Anders Mjos | | | | Problems | Backing pump needs new filter | The source of the poor vacuum in the backing
line seems to be related to a dirty filter.
We will try to find a replacement filter |
|