Entry  Tuesday, August 14, 2012, 15:11, John Wong, , , , Maintenance, Replacing Cu-heatshield insulators insulators.PNGMM800_insulator.PNG
   +  Reply  Tuesday, August 14, 2012, 17:11, John Wong, , , , Failed, Sintering Ta2O5 coating on Ta foil failed Ta2O5_coating.PNG
Entry  Monday, September 24, 2012, 15:12, Nikita Bernier, TaC, , , Done, Sintering Ta foil with TaC coating striptool1.PNG
   +  Reply  Monday, September 24, 2012, 18:09, Nikita Bernier, TaC, , , Done, Sintering Ta foil with TaC coating striptool2.PNGstriptool4.PNGstriptool5.PNG
   +  Reply  Wednesday, September 26, 2012, 15:06, Nikita Bernier, TaC, , , Done, Sintering Ta foil with TaC coating striptool6.pngSans_titre2.png
Entry  Wednesday, September 26, 2012, 15:14, Nikita Bernier, BeO, , , Done, Sintering BeO Pellets #4 Sans_titre3.png
   +  Reply  Friday, September 28, 2012, 12:59, Nikita Bernier, BeO, , , Done, Sintering BeO Pellets #4 striptool7.pngstriptool8.PNGRetired.png
Entry  Friday, January 11, 2013, 11:16, John Wong, , , , Maintenance, Replace terminal insulator broke_insulator.PNG
   +  Reply  Friday, January 11, 2013, 15:16, Anders Mjos, , , , Maintenance, Replace terminal insulator ITD0052C_revB.pdfinstalled_insulators.jpegta_heat_shields.jpeg
Entry  Tuesday, January 22, 2013, 16:14, John Wong, , , LP-SIS, Done, Heating RFQ components & measuring temperatures 2169.jpgautorampingup_800.PNG
Entry  Monday, February 18, 2013, 16:43, John Wong, Empty, , LP-SIS, Done, Sintering TaC coating on the RFQ target container SiC#28_-_LPSIS-RFQ.pngSintering_of_TaC.PNGautorampingdown_10.PNG
Entry  Friday, February 22, 2013, 15:55, John Wong, SiC, , LP-SIS, Done, Sintering SiC#28-RFQ RFQ_SiC#28_-production_process.mp4
Entry  Friday, April 19, 2013, 09:39, Rick Maharaj, Empty, , , Done, thermocouple Feedthru 
Entry  Tuesday, May 07, 2013, 16:53, Nikita Bernier, BeO, , , Done, Sintering BeO pellets #6 
   +  Reply  Monday, May 13, 2013, 12:53, Nikita Bernier, BeO, , , Done, Sintering BeO pellets #6 600Down.png
   +  Reply  Monday, May 13, 2013, 17:17, Nikita Bernier, BeO, , , Done, Sintering BeO pellets #6 
Entry  Friday, October 04, 2013, 16:21, John Wong, Empty, , LP-SIS, Done, Sintering TaC coating on a LP target container to be used for C-grv tube test  LP_C_grv_tempcurve.PNGLP_C_grv_TGHT632_1960C.PNG
Entry  Tuesday, October 29, 2013, 15:50, Anders Mjos, , , , In progress, Copper bars on TGHT and TBHT Current_and_Voltage.pdf
Entry  Friday, November 01, 2013, 17:20, Anders Mjos, , , , Problems, Backing pump needs new filter 
   +  Reply  Monday, November 04, 2013, 14:02, Anders Mjos, , , , Maintenance, Backing pump replaced 