503
|
Sunday, August 30, 2020, 18:28 |
Marla Cervantes | Empty | 44489-13 | | Done | TaC coating/sintering | Sunday, August 30, 2020, 06:47
A short tantalum tube was coated |
|
505
|
Saturday, September 05, 2020, 21:33 |
Marla Cervantes | Empty | | | Done | Pristine Ta tube calibration | Saturday, September 05, 2020, 12:56
A Ta tube was wrapped with 3 |
|
506
|
Thursday, September 10, 2020, 07:53 |
Aaron Schmidt | Empty | 41790-8 | LP-FEBIAD | Done | Fernando FEBIAD / Anode testing. | FEBIAD installed. Anode PS installed.
ANODE connected!.
Leak check |
|
507
|
Thursday, September 17, 2020, 16:11 |
Marla Cervantes | Empty | 44139-9 | LP-SIS | Done | TaC coating/sintering | Thursday, September 17, 2020, 16:10
An LP-SIS was wrapped with 3 Ta layers,
and installed in the EVAP2 |
|
515
|
Friday, October 09, 2020, 09:50 |
Ferran Boix Pamies | Empty | 44139-7-SK | TARGET BOAT | Done | Tests, radiation gun for parasitic target | 2020-10-09 9:48 The target was installed
the day before and left pumping over night.
IGP1=4.7e-7Torr. leak check when water on, |
|
516
|
Tuesday, October 13, 2020, 11:15 |
Ferran Boix Pamies | Empty | 44139-7-SK | TARGET BOAT | Done | foil heating | 2020-10-13 11:13 Target was left
under vacuum over the weekend. IGP1: 1.6e-7T
water on- leak check ok. Ramping up 2A/30s |
|
517
|
Thursday, October 15, 2020, 18:51 |
Ferran Boix Pamies | Empty | 44139-7-SK | TARGET BOAT | Done | heat gun plus parasitic target thermal comissioning. | 2020-10-15 18:51 : Setup installed
during the day. Pumped down to IGP1:1.5e-5T
, water leak check ok. Ramping up to 100A. |
|
518
|
Friday, October 16, 2020, 16:31 |
Luca Egoriti | Empty | | TARGET BOAT | In progress | HPOG annealing | Friday, October 16, 2020, 11:30
Target mounted in EVAP2. Pump
down started |
|
520
|
Tuesday, October 27, 2020, 10:25 |
Ferran Boix Pamies | Empty | 44139-7-SK | TARGET BOAT | Done | parasitic target commissioning | 2020-10-27 10:24 setup introduced
yesterday. Pumping over night IGP1: 5.7e-7T.
Water leak check ok. Performing heating elements |
|
521
|
Monday, November 02, 2020, 18:32 |
Ferran Boix Pamies | Empty | 44139-7-SK | TARGET BOAT | Done | HEA heat treatment | 2020-11-02 6:32: roughing on
2020-11-02 7:21: Turbo on for a while,
IGP1:1.8e-5T . water leak check ok. |
|
522
|
Wednesday, November 04, 2020, 17:31 |
Ferran Boix Pamies | Empty | 41882-2 | TARGET BOAT | Done | Parasitic target graphite outgassing. | 2020-11-04 17:31: target installed
with boat containing graphite container for
outgassing. Roughing pump on. |
|
523
|
Thursday, November 05, 2020, 15:13 |
Ferran Boix Pamies | Empty | 41882-2 | TARGET BOAT | Done | cleaning treatment. | 2020-11-05 15:44 empty and naked
boat in for heating up system and clean up.
Turbo on. |
|
531
|
Friday, February 26, 2021, 09:28 |
Ferran Boix Pamies | Empty | none | | Done | Parasitic target thermal tests | Tests were performed with external
power supply. No target boat or container.
Small power on heating small heating |
|
538
|
Tuesday, March 23, 2021, 11:28 |
Marla Cervantes | Empty | 44489-6 | | Done | Re-coating test 3 | Objective: Coating the inner surface of
a short tantalum boat with rhenium.
Result: |
|
540
|
Thursday, March 25, 2021, 11:24 |
Marla Cervantes | Empty | NA (Cu-Tube | | Done | Re-coat test 4 | Objective: Coating the inner surface of
a short tantalum tube with rhenium.
Result: |
|
541
|
Friday, March 26, 2021, 13:58 |
Marla Cervantes | Empty | 44489-6 | | Done | Re-coat 1 | Friday, March 26, 2021, 13:55
Yesterday a heat shield was installed
in the EVAP2. |
|
542
|
Friday, March 26, 2021, 16:23 |
Marla Cervantes | Empty | 44489-7 | | Done | Re-coat 2 | Objective: Coating the inner surface of
a tantalum tube to make a destructive test
and use a reference for the tantalum boats |
|
544
|
Tuesday, March 30, 2021, 19:49 |
Ferran Boix Pamies | Empty | 44139-7-SK | | Done | Parasitic target thermal tests | 2021-03-30 7:48 Target loaded with
parasitic target only. No container. Leaving
under vacuum over night. |
|
545
|
Sunday, April 04, 2021, 16:09 |
Ferran Boix Pamies | Empty | 41882-2 | TARGET BOAT | Done | parasitic target commissioning | 2021-04-04 16:07 New container is
in with heatshields, vacuum 8.6E-6 torr.
leak check done. ramping up current, checking |
|
547
|
Tuesday, April 13, 2021, 10:44 |
Marla Cervantes | Empty | NA (Ta- tube Eagle Alloys) | | Done | Re-coat 4 | Tuesday, April 13, 2021, 09:51
IGP1 = 2.5e-7 Torr
|
|