  Evaporator_2, Page 25 of 34  Not logged in ELOG logo
New entries since:Wed Dec 31 16:00:00 1969
ID Date Author Target Materialdown Target Oven W.O# Source Status Subject Text Attachments
  503   Sunday, August 30, 2020, 18:28 Marla CervantesEmpty44489-13 DoneTaC coating/sintering Sunday, August 30, 2020, 06:47
A short tantalum tube was coated
  
  505   Saturday, September 05, 2020, 21:33 Marla CervantesEmpty  DonePristine Ta tube calibrationSaturday, September 05, 2020, 12:56
A Ta tube was wrapped with 3
  
  506   Thursday, September 10, 2020, 07:53 Aaron SchmidtEmpty41790-8LP-FEBIADDoneFernando FEBIAD / Anode testing. FEBIAD installed. Anode PS installed.
ANODE connected!.
Leak check
  
  507   Thursday, September 17, 2020, 16:11 Marla CervantesEmpty44139-9LP-SISDoneTaC coating/sintering Thursday, September 17, 2020, 16:10
An LP-SIS was wrapped with 3 Ta layers,
and installed in the EVAP2
  
  515   Friday, October 09, 2020, 09:50 Ferran Boix PamiesEmpty44139-7-SKTARGET BOATDoneTests, radiation gun for parasitic target 2020-10-09 9:48 The target was installed
the day before and left pumping over night.
IGP1=4.7e-7Torr. leak check when water on,
  
  516   Tuesday, October 13, 2020, 11:15 Ferran Boix PamiesEmpty44139-7-SKTARGET BOATDonefoil heating 2020-10-13 11:13 Target was left
under vacuum over the weekend. IGP1: 1.6e-7T
water on- leak check ok. Ramping up 2A/30s
  
  517   Thursday, October 15, 2020, 18:51 Ferran Boix PamiesEmpty44139-7-SKTARGET BOATDoneheat gun plus parasitic target thermal comissioning. 2020-10-15 18:51 : Setup installed
during the day. Pumped down to IGP1:1.5e-5T
, water leak check ok. Ramping up to 100A. 
  
  518   Friday, October 16, 2020, 16:31 Luca EgoritiEmpty TARGET BOATIn progressHPOG annealingFriday, October 16, 2020, 11:30
 Target mounted in EVAP2. Pump
down started
  
  520   Tuesday, October 27, 2020, 10:25 Ferran Boix PamiesEmpty44139-7-SKTARGET BOATDoneparasitic target commissioning 2020-10-27 10:24 setup introduced
yesterday. Pumping over night IGP1: 5.7e-7T.
Water leak check ok. Performing heating elements
  
  521   Monday, November 02, 2020, 18:32 Ferran Boix PamiesEmpty44139-7-SKTARGET BOATDoneHEA heat treatment2020-11-02 6:32: roughing on
2020-11-02 7:21: Turbo on for a while,
IGP1:1.8e-5T . water leak check ok.
 20201104_102925.jpg20201104_144831.jpg 
  522   Wednesday, November 04, 2020, 17:31 Ferran Boix PamiesEmpty41882-2TARGET BOATDoneParasitic target graphite outgassing. 2020-11-04 17:31: target installed
with boat containing graphite container for
outgassing. Roughing pump on.
  
  523   Thursday, November 05, 2020, 15:13 Ferran Boix PamiesEmpty41882-2TARGET BOATDonecleaning treatment. 2020-11-05 15:44 empty and naked
boat in for heating up system and clean up.
Turbo on.
  
  531   Friday, February 26, 2021, 09:28 Ferran Boix PamiesEmptynone DoneParasitic target thermal tests Tests were performed with external
power supply. No target boat or container.
Small power on heating small heating
  
  538   Tuesday, March 23, 2021, 11:28 Marla CervantesEmpty44489-6 DoneRe-coating test 3Objective: Coating the inner surface of
a short tantalum boat with rhenium.
Result:
  
  540   Thursday, March 25, 2021, 11:24 Marla CervantesEmptyNA (Cu-Tube DoneRe-coat test 4Objective: Coating the inner surface of
a short tantalum tube with rhenium.
Result:
  
  541   Friday, March 26, 2021, 13:58 Marla CervantesEmpty44489-6 DoneRe-coat 1Friday, March 26, 2021, 13:55
Yesterday a heat shield was installed
in the EVAP2.
  
  542   Friday, March 26, 2021, 16:23 Marla CervantesEmpty44489-7 DoneRe-coat 2Objective: Coating the inner surface of
a tantalum tube to make a destructive test
and use a reference for the tantalum boats
  
  544   Tuesday, March 30, 2021, 19:49 Ferran Boix PamiesEmpty44139-7-SK  DoneParasitic target thermal tests 2021-03-30 7:48 Target loaded with
parasitic target only. No container. Leaving
under vacuum over night.
 20210403_174815.jpg20210403_183102.jpg 
  545   Sunday, April 04, 2021, 16:09 Ferran Boix PamiesEmpty41882-2TARGET BOATDoneparasitic target commissioning 2021-04-04 16:07 New container is
in with heatshields, vacuum 8.6E-6 torr.
leak check done. ramping up current, checking
  
  547   Tuesday, April 13, 2021, 10:44 Marla CervantesEmptyNA (Ta- tube Eagle Alloys) DoneRe-coat 4 Tuesday, April 13, 2021, 09:51
IGP1 = 2.5e-7 Torr

 voltage-increment-Re-coating.JPG 