  431   Thursday, February 21, 2019, 09:15 Darwin Ortiz RosalesEmpty42464-4HP-FEBIADDone Thursday, February 21, 2019, 09:01
Container coated with TaC and wrapped
with 2 Ta heat shields.
 190225EVAP2Trend.png190225EVAP2Trendb.png 
  432   Thursday, March 07, 2019, 09:22 Darwin Ortiz RosalesEmpty40282-4TARGET BOATDoneTransfer tube TaC coating (Legnaro)Thursday, March 07, 2019, 09:09
Transfer tube from Legnaro was coated
with TaC.
  
  433   Wednesday, March 13, 2019, 15:43 Marla Cervantes 43630-6 DoneGraphite insert test #4 Wednesday, March 13, 2019, 15:41
An uncoated tantalum tube was loaded
with a graphite insert (with conical caps).
  
  434   Monday, March 18, 2019, 15:58 Darwin Ortiz RosalesZrC43044-5LP-SISDoneSintering ZrCMonday, March 18, 2019, 15:51
Total number of foils: 555
Total mass of material including
 IMG_3070.JPGIMG_3066.JPG 
  435   Monday, April 01, 2019, 16:35 Darwin Ortiz Rosales 43630-4 DoneTaC coating/graphite/sinteringMonday, April 01, 2019, 16:35
Container was coated with TaC and
a roll of graphite inserted inside the tube.
  
  436   Wednesday, April 03, 2019, 16:59 Marla CervantesTaC43630-5 DoneTaC coating/sintering for graphite insert test Wednesday, April 03, 2019, 16:57
Tantalum tube was coated with
  
  437   Sunday, April 07, 2019, 08:13 Marla Cervantes 43630-5 DoneGraphite insert test #5 Sunday, April 07, 2019, 08:10
A graphite insert (with conical caps)
was loaded in tantalum tube previously coated
 190407-GraphiteInsertTest.pdfV1.JPGV2.JPG20190415_170133.jpg 
  439   Wednesday, April 17, 2019, 09:06 Marla Cervantes 38295-10LP-FEBIADDoneGraphite insert test Wednesday, April 17, 2019, 09:03
An uncoated target container was
loaded with a graphite insert and wrapped
 190417-TargetContainer-TEMP.pdfIMG_1074.JPG 
  441   Tuesday, April 30, 2019, 09:35 Darwin Ortiz RosalesEmpty43044-6LP-SISDoneTaC coating/sinteringTuesday, April 30, 2019, 09:33
Container was coated with TaC and
wrapped with 2 Ta heat shields.
 43044_6a.png43044_6b.png 
  442   Friday, May 10, 2019, 16:58 Marla Cervantes 43943-1 DoneTaC coating/sintering for graphite insert test Friday, May 10, 2019, 16:54
A tantalum tube was coated with TaC,and
wrapped with three tantalum sheets,
  
  443   Tuesday, May 14, 2019, 13:57 Aaron Schmidt  LP-FEBIADDoneTest FEBIAD Tuesday, May 14, 2019, 13:56: Removed
old HS w/ flexible lines & swapped in
the FEBIAD. (HS waterlines are still purged.)
  
  445   Tuesday, May 21, 2019, 18:01 Marla Cervantes 43943-1 DoneGraphite foil test Tuesday, May 21, 2019, 17:57
A tantalum tube previously coated
with TaC and sintered was loaded with graphite
  
  446   Friday, May 24, 2019, 15:29 Marla Cervantes 43943-2 DoneGraphite insert testFriday, May 24, 2019, 15:26
 A graphite insert with tantalum
wires in its caps
  
  447   Tuesday, June 04, 2019, 08:41 Darwin Ortiz RosalesEndcaps TARGET BOATDoneSintering TaC coating on endcaps and springsTuesday,
June 04, 2019, 08:36
  
  448   Monday, June 17, 2019, 17:03 Marla Cervantes 43943-2 DoneGraphite insert testThursday, June 6, 2019, 16:43
A graphite insert with tantalum
  
  449   Monday, June 17, 2019, 17:09 Marla Cervantes 49044-9LP-SISDoneTarget container calibration/conditioning Monday, June 17, 2019, 17:04
A LP-SIS target container  was
wrapped with 3 heat shielding layers,
  
  450   Monday, June 24, 2019, 08:42 Darwin Ortiz RosalesSiC42464-4HP-FEBIADDoneConditioning of BSiC discs
Monday, June 24, 2019, 08:24
Total number of foils: 484
Total mass in  including container
  
  451   Wednesday, July 17, 2019, 11:13 Marla CervantesNb40282-4TARGET BOATDoneAnnealing of RRR-Nb test samples Wednesday, July 17, 2019, 10:57
Annealing of five RRR Nb samples
following cold-working and resistance measurements. 
  
  452   Tuesday, July 30, 2019, 15:42 Darwin Ortiz RosalesZrC43044-6LP-SISDoneSintering ZrC Discs 
 
Tuesday,
July 30, 2019, 15:33
ZrC backup Target 12.6 cm disc length,
  
  453   Monday, August 12, 2019, 15:55 John WongZrC43044-6LP-SISDoneSintering ZrC Discs


   
        
            
 ZrC_43044-6_inspection.pdf 