ID |
Date |
Author |
Target Material |
Target Oven W.O# |
Source |
Status |
Subject |
Text |
|
|
630
|
Thursday, April 27, 2023, 22:18 |
John Wong | TiC | 44692-5 | LP-FEBIAD | In progress | TiC230425 |
|
|
|
633
|
Tuesday, May 02, 2023, 14:20 |
John Wong | np-TiO2 | | TARGET BOAT | In progress | Carbonization of np-TiO2 spun fibrous pellets/fibre mats | Tuesday, May 02, 2023, 14:03
Two np-TiO2 spun fibrous pellets
and 1 batch of fibre mats were wrapped with |
7x |
|
667
|
Friday, July 26, 2024, 10:05 |
John Wong | np-Ta | | TARGET BOAT | Done | Carbonization of Heat Stabilized np-Ta Fibres Disk (1st Attempt) |
|
|
|
673
|
Monday, August 19, 2024, 13:17 |
John Wong | np-Ta | | TARGET BOAT | In progress | Carbonization of heat stabilized np-Ta fibres - 2nd Attempt | Monday, August 19, 2024, 13:06
Target container consists of 2 samples,
and both samples were heat stabilized at |
|
|
588
|
Wednesday, August 10, 2022, 09:31 |
Ivan Bao | Empty | | TARGET BOAT | In progress | TC tests | 1st test polarity 1
10:12 am Begin pumping down to rough
vacuum |
|
|
595
|
Tuesday, October 18, 2022, 13:59 |
Hannah Toy | TiC | Target boat (tube) | TARGET BOAT | Done | Synthesis of TiC | Tuesday, October 18, 2022, 13:52
38 pieces of samples made of TiO2/C/PVP
loaded into a target boat wrapped with 2 |
|
|
579
|
Wednesday, June 08, 2022, 10:00 |
Flora Wu | | boat | | Done | carbonize PAN 10% discs | Thursday, June 09, 2022, 11:25
Total number of foils: 14 electrospun |
|
|
493
|
Friday, July 31, 2020, 11:16 |
Ferran Boix Pamies | Empty | 41882-1 | TARGET BOAT | Done | Thermocouple measurent of boat temperature | Boat with attached thermocouple type C
with AREMCO ceramabond glue installed in
evap2 the 30-07-2020 |
|
|
495
|
Wednesday, August 05, 2020, 19:14 |
Ferran Boix Pamies | Empty | 41882-1 | TARGET BOAT | Done | Parasitic target cooling test | 2020-08-05 7.13pm Roughing pump on
2020-08-06 10:48am Turbo was turned
on by Marla in the morning. Vacuum IGP1 4e-6Torr. |
|
|
496
|
Tuesday, August 11, 2020, 10:17 |
Ferran Boix Pamies | Empty | 41882-1 | TARGET BOAT | In progress | Contamination foils temperature test | The target was prepared and put under vacuum
on 2020-08-10
|
|
|
515
|
Friday, October 09, 2020, 09:50 |
Ferran Boix Pamies | Empty | 44139-7-SK | TARGET BOAT | Done | Tests, radiation gun for parasitic target | 2020-10-09 9:48 The target was installed
the day before and left pumping over night.
IGP1=4.7e-7Torr. leak check when water on, |
|
|
516
|
Tuesday, October 13, 2020, 11:15 |
Ferran Boix Pamies | Empty | 44139-7-SK | TARGET BOAT | Done | foil heating | 2020-10-13 11:13 Target was left
under vacuum over the weekend. IGP1: 1.6e-7T
water on- leak check ok. Ramping up 2A/30s |
|
|
517
|
Thursday, October 15, 2020, 18:51 |
Ferran Boix Pamies | Empty | 44139-7-SK | TARGET BOAT | Done | heat gun plus parasitic target thermal comissioning. | 2020-10-15 18:51 : Setup installed
during the day. Pumped down to IGP1:1.5e-5T
, water leak check ok. Ramping up to 100A. |
|
|
520
|
Tuesday, October 27, 2020, 10:25 |
Ferran Boix Pamies | Empty | 44139-7-SK | TARGET BOAT | Done | parasitic target commissioning | 2020-10-27 10:24 setup introduced
yesterday. Pumping over night IGP1: 5.7e-7T.
Water leak check ok. Performing heating elements |
|
|
521
|
Monday, November 02, 2020, 18:32 |
Ferran Boix Pamies | Empty | 44139-7-SK | TARGET BOAT | Done | HEA heat treatment | 2020-11-02 6:32: roughing on
2020-11-02 7:21: Turbo on for a while,
IGP1:1.8e-5T . water leak check ok. |
|
|
522
|
Wednesday, November 04, 2020, 17:31 |
Ferran Boix Pamies | Empty | 41882-2 | TARGET BOAT | Done | Parasitic target graphite outgassing. | 2020-11-04 17:31: target installed
with boat containing graphite container for
outgassing. Roughing pump on. |
|
|
523
|
Thursday, November 05, 2020, 15:13 |
Ferran Boix Pamies | Empty | 41882-2 | TARGET BOAT | Done | cleaning treatment. | 2020-11-05 15:44 empty and naked
boat in for heating up system and clean up.
Turbo on. |
|
|
531
|
Friday, February 26, 2021, 09:28 |
Ferran Boix Pamies | Empty | none | | Done | Parasitic target thermal tests | Tests were performed with external
power supply. No target boat or container.
Small power on heating small heating |
|
|
544
|
Tuesday, March 30, 2021, 19:49 |
Ferran Boix Pamies | Empty | 44139-7-SK | | Done | Parasitic target thermal tests | 2021-03-30 7:48 Target loaded with
parasitic target only. No container. Leaving
under vacuum over night. |
|
|
545
|
Sunday, April 04, 2021, 16:09 |
Ferran Boix Pamies | Empty | 41882-2 | TARGET BOAT | Done | parasitic target commissioning | 2021-04-04 16:07 New container is
in with heatshields, vacuum 8.6E-6 torr.
leak check done. ramping up current, checking |
|