Laura Lambert | Empty | 39530-10 | HP-FEBIAD | Done | Sintering TaC coated container for backup | Tuesday, January 31, 2017, 13:43
Container coated with TaC using new method: Ends taped off, with liquid poured in and swirled around entire container, then poured back out - 'flushing technique'
Container is wrapped with 3 x Ta heat shields, not incl center block.
Loaded into EVAP2 and currently pumping down.
Tuesday, January 31, 2017, 16:02
IGP1 = 3.9e-6 Torr.
HS water valves opened.
No leaks detected.
Tapped up manually to 35A.
Vacuum stable.
Initiated auto ramp at 0.2A/min and 0.1A/min for the TGHT and TBHT respectively.
Final setpoints for TGHT = 450A and TBHT = 230A, with final desired temp of 1900C
OMEGA slope = 0.98
Wednesday, February 01, 2017, 10:01
IGP1 = 5.7e-7 Torr.
TGHT = 254A, 3.0V
TBHT = 142A, 1.8V
Increasing ramping rate to 2.0A/min and 1.0A/min for the TGHT and TBHT respectively.
Wednesday, February 01, 2017, 11:48
IGP1 = 1.7e-6 Torr.
TGHT = 450A, 6.27V
TBHT = 230A, 3.14V
OMEGA = 1176C
Increasing max setpoint of TGHT = 600A
Wednesday, February 01, 2017, 13:09
IGP1 = 3.7e-6 Torr.
TGHT = 600A, 9.0V
TBHT = 230A, 3.18V
OMEGA = 1480C
Increasing max setpoint of TGHT = 700A
Wednesday, February 01, 2017, 14:08
IGP1 = 3.8e-6 Torr.
TGHT = 700A, 10.96V
TBHT = 230A, 3.2V
OMEGA = 1705C
Increasing max setpoint of TGHT = 750A
Wednesday, February 01, 2017, 15:02
IGP1 = 5.1e-6 Torr.
TGHT = 750A, 11.87V
TBHT = 230A, 3.2V
OMEGA = 1808C
Increasing max setpoint of TGHT = 800A
Wednesday, February 01, 2017, 15:30
IGP1 = 6.6e-6 Torr.
TGHT = 800A, 12.86V
TBHT = 230A, 3.2V
OMEGA = 1903C
Will remain at max setpoints overnight.
Thursday, February 02, 2017, 09:16
Remained at max setpoints for ~18hrs.
IGP1 = 9.5e-7 Torr.
OMEGA =1914C
TGHT = 800A, 12.83V
TBHT = 230A, 3.22V
Initiating auto-cool at 2.0A/min and 1.0A/min for the TGHT and TBHT respectively.
Friday, February 03, 2017, 14:24
Vented in air and opened up this morning
Coating looks good.
See photos attached.
|
Attachment 1: 39530-10(1).JPG
|
|
Attachment 2: 39530-10(2).JPG
|
|
350
|
Tuesday, February 21, 2017, 15:21 |
Laura Lambert | Empty | 42218-1 | LP-IG-LIS | Done | sintering TaC coating on UCx#20 container | Tuesday, February 21, 2017, 15:19
Container coated with TaC using 'flushing technique' and let dry overnight.
Cleaned ionizer tube with acetone, no coating inside ionizer tube
Wrapped with 3 x Ta heat shields, incl center block
Currently pumping down in evap2
OMEGA slope = 0.98
Good vac at 3.0e-5, bad vac at 4.0e-5 Torr.
Wednesday, February 22, 2017, 09:41
HS water valves opened, no leaks detected.
Tapped up manually to 35A
Waited ~45min
Vacuum stable.
IGP1 = 1.2e-6 Torr
Initiating auto ramp for TGHT @ 0.2A/min to a max setpoint of 350A
Initiating auto ramp for TBHT @ 0.1A/min to a max setpoint of 230A
Once max setpoints achieved, will tap up manually to final desired temperature of 1900C
Friday, February 24, 2017 by Anders
Continue manually to 1900 C
Friday, February 24, 2017, 16:24: TGHT at 400 A 6.35V IG1 = 4.5e-7 Torr 1660 C
Friday, February 24, 2017, 16:57: TGHT at 410 A 6.6 V IG1 = 5.0e-7 Torr 1700 C
Sunday, February 26, 2017 by Anders
Sunday, February 26, 2017, 14:13: TGHT at 425 A 6.9 V IG1 = 2.5e-7 Torr
Lab closed for weekend. No access to temp reading.
Monday, February 27, 2017, 16:12
Tapped up manually to 1900C this morning.
TGHT = 490A, 8.14V
TBHT = 230A, 2.98V
MIKRON = 1911C
OMEGA = 1904C
evap2 has remained at max setpoints for ~6hrs
Initiating auto-cool at 2.0A/min and 1.0A/min for the TGHT and TBHT respectively.
Tuesday, February 28, 2017, 11:57
Container finished sintering.
Vented in air and opened up this morning.
Container looks good
|
Attachment 1: IMG_1562.JPG
|
|
Attachment 2: IMG_1564.JPG
|
|
354
|
Wednesday, April 05, 2017, 15:42 |
Laura Lambert | Empty | | TARGET BOAT | In progress | Sintering TaC coating on evap1 target boat | Wednesday, April 05, 2017, 15:36
Coated container with TaC coating using spray technique this morning and let dry.
Wrapped with one long layer of Ta heat shield, wrapped around boat 3x
No ends to target boat
Installed in evap2 and pumping down now...
|
355
|
Thursday, April 06, 2017, 08:57 |
Laura Lambert | Empty | | TARGET BOAT | Problems | Sintering TaC coating on evap1 target boat |
Laura Lambert wrote: |
Wednesday, April 05, 2017, 15:36
Coated container with TaC coating using spray technique this morning and let dry.
Wrapped with one long layer of Ta heat shield, wrapped around boat 3x
No ends to target boat
Installed in evap2 and pumping down now...
|
Thursday, April 06, 2017, 08:56
Problems with IGP2
Won't turn on, has low voltage output.
See screenshot attached.
|
Attachment 1: Capture.JPG
|
|
356
|
Thursday, April 06, 2017, 11:15 |
Laura Lambert | Empty | | TARGET BOAT | Problems resolved | Sintering TaC coating on evap1 target boat |
Laura Lambert wrote: |
Laura Lambert wrote: |
Wednesday, April 05, 2017, 15:36
Coated container with TaC coating using spray technique this morning and let dry.
Wrapped with one long layer of Ta heat shield, wrapped around boat 3x
No ends to target boat
Installed in evap2 and pumping down now...
|
Thursday, April 06, 2017, 08:56
Problems with IGP2
Won't turn on, has low voltage output.
See screenshot attached.
|
Thursday, April 06, 2017, 11:12
Turns out it was just a bad connection.
See attached photos.
|
Attachment 1: IMG_1615.JPG
|
|
Attachment 2: IMG_1611.JPG
|
|
357
|
Thursday, April 06, 2017, 13:16 |
Laura Lambert | Empty | 40282-2 | TARGET BOAT | Done | Sintering TaC coating on evap1 target boat |
Laura Lambert wrote: |
Laura Lambert wrote: |
Laura Lambert wrote: |
Wednesday, April 05, 2017, 15:36
Coated container with TaC coating using spray technique this morning and let dry.
Wrapped with one long layer of Ta heat shield, wrapped around boat 3x
No ends to target boat
Installed in evap2 and pumping down now...
|
Thursday, April 06, 2017, 08:56
Problems with IGP2
Won't turn on, has low voltage output.
See screenshot attached.
|
Thursday, April 06, 2017, 11:12
Turns out it was just a bad connection.
See attached photos.
|
Thursday, April 06, 2017, 13:16
HS water valves opened, no leaks detected.
Tapped up manually to 35A
Waited almost 2hrs
IGP1 = 9.9e-7 Torr
Initiating auto-ramp at 0.2A/min to 400A
Final desired temperature = 1900C
OMEGA slope = 0.98
Good vac at 3.0e-5, bad vac at 4.0e-5 Torr.
Monday, April 10, 2017, 09:26
IGP1 = 1.79e-7 Torr
TGHT = 400A, 6.47V
OMEGA = 1505C
Tapping up manually to 1900C...
Monday, April 10, 2017, 11:46
TGHT tripped off at 410A, ~1530C
Water is still on and good flow.
Vacuum was stable ~1.8e-7 Torr.
No power trips according to controls.
Not sure of reasoning behind trip.
Initially tried tapping back-up, no current was being applied.
Turned off and back on TGHT power supply - this restarted things and now works again.
Have tapped back up to 35A, vacuum still good.
Restarting auto-ramp to 400A at 1.0A/min
Monday, April 10, 2017, 13:13
Vacuum looks good.
IGP1 = 1.1e-7 Torr
TGHT = 127A, 1.30V
Increasing ramping rate to 2.0A/min
Monday, April 10, 2017, 16:08
IGP1 = 1.5e-7 Torr
TGHT = 400A, 6.24V
OMEGA = 1510V
Increasing auto ramp setpoint to 450A at a rate of 0.2A/min
Wednesday, April 12, 2017, 11:06
IGP1 = 2.96e-7 Torr
TGHT = 555A, 9.74V
OMEGA = 1935C
Has remained at max setpoints overnight.
Initiating auto-cool at 2.0A/min
Thursday, April 13, 2017, 11:59
vented in air and opened up this morning.
container looks good.
see photo attached.
|
Attachment 1: IMG_1653.JPG
|
|
365
|
Wednesday, May 10, 2017, 16:07 |
Laura Lambert | Empty | | TARGET BOAT | In progress | Conditioning Heat Shield for IGLIS UCx#20 - test stand is down | Wednesday, May 10, 2017, 16:05
Loaded.
HS water valves opened, no leaks detected.
Started auto-ramp at a rate of 1A/30sec to a final setpoint of 580A
|
366
|
Wednesday, May 10, 2017, 21:33 |
Anders Mjos | Empty | | TARGET BOAT | In progress | Conditioning Heat Shield for IGLIS UCx#20 - test stand is down |
Laura Lambert wrote: |
Wednesday, May 10, 2017, 16:05
Loaded.
HS water valves opened, no leaks detected.
Started auto-ramp at a rate of 1A/30sec to a final setpoint of 580A
|
Wednesday, May 10, 2017, 21:31: TGHT at 580 A for 1 h. Vacuum came down to 1.4E-6 Torr. TGHT voltage stable. Ramping down. |
367
|
Thursday, May 11, 2017, 10:51 |
Laura Lambert | Empty | | TARGET BOAT | Done | Conditioning Heat Shield for IGLIS UCx#20 - test stand is down |
Anders Mjos wrote: |
Laura Lambert wrote: |
Wednesday, May 10, 2017, 16:05
Loaded.
HS water valves opened, no leaks detected.
Started auto-ramp at a rate of 1A/30sec to a final setpoint of 580A
|
Wednesday, May 10, 2017, 21:31: TGHT at 580 A for 1 h. Vacuum came down to 1.4E-6 Torr. TGHT voltage stable. Ramping down.
|
Thursday, May 11, 2017, 10:51
vented in air and opened it up this morning.
Heat shield looks good!
|
368
|
Thursday, May 11, 2017, 11:25 |
Laura Lambert | Empty | 41369-10 | HP-FEBIAD-CTL | Done | RUSH! Sintering TaC coated container for SiC#36 | Thursday, May 11, 2017, 11:21
Turns out SiC HP-FEBIAD that has finished conditioning is loaded in the wrong container and it should be a SiC HP-FEBIAD cold transfer line...so rush on new target.
Container coated with TaC using new method: Ends taped off, with liquid poured in and swirled around entire container, then poured back out - 'flushing technique'
Container is wrapped with 1x heatshield around each side of cooling fins, not incl center block.
Loaded into EVAP2 and currently pumping down.
Thursday, May 11, 2017, 13:40
IGP1 = 1.85e-6 Torr.
HS water valves opened.
No leaks detected.
Tapped up manually to 35A.
Vacuum stable.
IGP1 = 3.2e-6 Torr
IGP2 = 4.2e-6 Torr
Initiated auto ramp at 0.2A/min and 0.1A/min for the TGHT and TBHT respectively.
Final setpoints for TGHT = 450A and TBHT = 230A, with final desired temp of 1900C
OMEGA slope = 0.98
Friday, May 12, 2017, 07:57
IGP1 = 4.3e-7 Torr.
IGP2 = 4.4e-7 Torr
TGHT = 233A, 2.8V
TBHT = 130A, 1.6V
Increasing ramping rate to 2.0A/min and 1.0A/min for the TGHT and TBHT respectively.
Friday, May 12, 2017, 08:54
Comparing direct readouts with epics:
IGP1: direct = 1.9e-6 Torr; epics = 1.3e-6 Torr
IGP2: direct = 1.55e-6 Torr; epics = 1.4e-6 Torr
TGHT: direct = 320A, 4.38V; epics = 321A, 4.19V
TBHT: direct = 181A, 2.40V; epics = 178A, 2.34V
Friday, May 12, 2017, 10:28
IGP1 = 1.07e-6 Torr
IGP2 = 1.15e-6 Torr
TGHT = 450A, 6.37V
TBHT = 230A, 3.21V
OMEGA = 1197C
Increasing max setpoint of TGHT = 700A
Friday, May 12, 2017, 13:06
IGP1 = 2.4e-6 Torr
IGP2 = 2.5e-6 Torr
TGHT = 696A, 11.21V
TBHT = 233A, 3.26V
OMEGA = 1758C
Increasing max setpoint of TGHT = 800A
Friday, May 12, 2017, 13:32
TGHT maxed out at 715A but continued ramping.
This was noticed when current set of TGHT = 750A but readout = 715A
This is due to max voltage limit = 12.0V and readout =11.58V
Increasing TGHT max setpoint to 14.0V and restarting auto ramp from 714A
Friday, May 12, 2017, 14:45
Container has reached max setpoint of ~1900C
TGHT setpoint = 775A
TGHT = 769A, 12.54V
TBHT = 233A, 3.28V
IGP1 = 2.94e-6 Torr
IGP2 = 2.99e-6 Torr
OMEGA = 1912C
Will remain at max setpoint over weekend.
See attached photos of temperature measurements using MIKRON while TGHT current set point = 770A.
Photos are not super accurate but good as a rough idea.
Ex. for left side the point in the camera is actually pointed slightly closer to the end of the container but in the photo it looks more centered.
Saturday, May 13, 2017, 10:52 by Anders
Ramping down heaters. Temp 1912 C. Vacuum IGP1 = 5.4e-7 Torr
Monday, May 15, 2017, 13:10
Vented in air and taken out this a.m.
Target container looks good.
Fully sintered coating.
|
Attachment 1: LS_during_TaC_sintering.jpg
|
|
Attachment 2: RS_during_TaC_sintering.jpg
|
|
373
|
Monday, June 05, 2017, 15:20 |
Laura Lambert | Empty | 42218-15 | LP-SIS | Done | Sintering TaC coating on UCx#21 container | Monday, June 05, 2017, 15:20
Container coated with TaC using 'flushing technique' and let dry over weekend.
Cleaned ionizer tube with acetone, no coating inside ionizer tube.
Wrapped with 3 x Ta heat shields, incl center block
Currently pumping down in evap2
OMEGA slope = 0.98
Good vac at 3.0e-5, bad vac at 4.0e-5 Torr.
Tuesday, June 06, 2017, 10:00
First time not turning water off and flushing lines after last use.
HS water valves have remained open since the last time evap2 was used [conditioning Ta#52]
No leak check done.
Tapped up manually to 35A.
Waited ~25min
Vacuum stable.
IGP1 = 2.9e-6 Torr
IGP2 = 4.8e-6 Torr
Initiating auto ramp for TGHT @ 0.2A/min to a max setpoint of 350A
Initiating auto ramp for TBHT @ 0.1A/min to a max setpoint of 230A
Once max setpoints achieved, will tap up manually to final desired temperature of 1900C
Wednesday, June 07, 2017, 09:26
TGHT = 304A, 4.46V
TBHT = 169A, 2.769V
IGP1 = 6.1e-7 Torr
IGP2 = 7.3e-7 Torr
Vacuum stable.
Increasing ramping rate to 1.0A/min and 0.5A/min for the TGHT and TBHT respectively.
Wednesday, June 07, 2017, 10:40
TGHT = 350A, 5.28V
TBHT = 203A, 3.39V
IGP1 = 1e-6 Torr
Increasing ramping rate for TBHT to 1.0A/min
Wednesday, June 07, 2017, 12:10
TGHT = 350A, 5.26V
TBHT = 230A, 3.99V
IGP1 = 7.0e-7 Torr
IGP2 = 8.3e-7 Torr
OMEGA = 1600C
Vacuum stable.
Increasing max setpoint of TGHT to 400A
Re-initiating ramping rate of TGHT at 1.0A/min
Wednesday, June 07, 2017, 15:42
Tapped up to reach final desired temperature.
TGHT = 450A, 7.28V
TBHT = 230A, 4.02V
IGP1 = 9.0e-7 Torr
IGP2 = 1.07e-6 Torr
OMEGA = 1910C
Will remain at max setpoints overnight.
Thursday, June 08, 2017, 08:51
Remained at max setpoints for 17hrs.
TGHT = 450A, 7.28V
TBHT = 230A, 4.02V
IGP1 = 2.6e-7 Torr
IGP2 = 2.9e-7 Torr
OMEGA = 1899C
Initiating auto-cool at 2.0A/min and 1.0A/min for the TGHT and TBHT respectively.
Thursday, June 08, 2017, 16:28
Vented in air and taken out this afternoon.
Container looks good!
Transferred into glove box.
|
385
|
Tuesday, August 08, 2017, 15:00 |
Laura Lambert | Empty | | | Problems resolved | Wiring in PLC replaced re: IGP1 mis-communicating | Tuesday, August 08, 2017, 14:57
See elog i.d's #384 and #381
Investigated wiring in PLC.
Some wires in PLC were not creating a good contact - could be problem re: IGP1 tripping off.
Wires replaced by Gelo.
Pumped down and turned on power supplies over weekend.
Everything remained on - IGP1 did not trip system off.
May proceed with regular use.
|
392
|
Tuesday, November 21, 2017, 13:55 |
Laura Lambert | Empty | 41882-4 | TARGET BOAT | Done | Sintering TaC coating on fully enclosed target boat for graphite test | Tuesday, November 21, 2017, 12:01
Boat coated with TaC using 'flushing technique' and let dry overnight.
Wrapped with 1 long Ta heat shield 3x
Loaded into evap2 just before lunch
IGP1 = 7.1e-6 Torr
OMEGA slope = 0.98
Good vac at 3.0e-4, bad vac at 8.0e-4 Torr.
HS water valves have remained open since the last time evap2 was used.
No leak check done.
Tapped up manually to 35A.
Waited ~25min
Vacuum stable.
IGP1 = 1.15e-5 Torr
IGP2 = 1.17e-5 Torr
Initiating auto ramp for TGHT @ 0.2A/min to a max setpoint of 300A
Once max setpoints achieved, will tap up manually to final desired temperature of 1900C
Wednesday, November 22, 2017, 09:32
TGHT = 270A, 4.15V
OMEGA = 1285C
IGP1 = 1.23e-6 Torr
IGP2 = 1.13e-6 Torr
Vacuum stable.
Increasing ramping rate to 1.0A/min and final setpoint to 350A
Wednesday, November 22, 2017, 10:25
TGHT = 325A, 5.15V
OMEGA = 1500C
IGP1 = 2.80e-6 Torr
IGP2 = 2.93e-6 Torr
Vacuum stable.
Increasing ramping rate to 1.5A/min and final setpoint to 400A
Wednesday, November 22, 2017, 10:49
TGHT = 350A, 5.60V
OMEGA = 1580C
IGP1 = 4.5e-6 Torr
IGP2 = 4.9e-6 Torr
Vacuum stable.
Increasing ramping rate to 2.0A/min
Wednesday, November 22, 2017, 11:18
TGHT = 400A, 6.64V
OMEGA = 1734C
IGP1 = 5.8e-6 Torr
IGP2 = 6.2e-6 Torr
Vacuum stable.
Increasing final setpoint to 450A.
Wednesday, November 22, 2017, 15:59
TGHT = 460A, 8.07V
OMEGA = 1898C
IGP1 = 1.34e-6 Torr
IGP2 = 1.27e-6 Torr
Sintering process complete.
Remained at max setpoints for just over 4hrs.
Initiating auto-cool at 2.0A/min.
Thursday, November 23, 2017, 13:09
Removed from evap2 this morning.
Coating looks good.
|
394
|
Wednesday, November 29, 2017, 16:18 |
Laura Lambert | Empty | 39530-3 | LP-FEBIAD | Done | Temperature measurements for ARIEL | Wednesday, November 29, 2017, 16:17
LP-FEBIAD loaded into evap2 today and currently pumping down.
Temperature measurements of the ionizer will be done by Fernando for ARIEL development.
Ta foil covering side holes on heat shield so no temp measurements can be done using OMEGA on side ports of evaporator as per request of Fernando
No Ta heat shields on container.
Final desired temperature of ionizer = 2000C
Thursday, November 30, 2017, 09:51
HS water valves opened, no leaks detected.
IGP1 = 2.1e-7 Torr
IGP2 = 1.7e-7 Torr
Tapped up to TGHT = 350A, 5.83V; TBHT = 230A, 3.31V
IGP1 = 6.3e-7 Torr
IGP2 = 3.7e-7 Torr
Will check temp measurements in lab after lunch before proceeding...
Friday, December 01, 2017, 11:04
Temperature measurements done.
Initiated auto-cool this morning.
TGHT cooling at 2.0A/min and TBHT at 1.0A/min.
Monday, December 04, 2017, 11:04
Removed from evap2 this morning. |
400
|
Wednesday, December 13, 2017, 10:55 |
Laura Lambert | Empty | 39530-3 | LP-FEBIAD | Done | Temperature measurements for ARIEL | Wednesday, December 13, 2017, 10:36
LP-FEBIAD loaded into evap2 this morning and pumped down.
Temperature measurements of the ionizer will be done by Fernando for ARIEL development.
Ta foil covering side holes on heat shield so no temp measurements can be done using OMEGA on side ports of evaporator as per request of Fernando
No Ta heat shields on container.
HS water valves opened, no leaks detected.
IGP1 = 2.3e-6 Torr
IGP2 = 1.7e-6 Torr
Tapped up to TGHT = 50A, 0.30V; TBHT = 50A, 0.59V
IGP1 = 1.8e-6 Torr
IGP2 = 1.4e-6 Torr
Initiating auto ramp for TGHT at 2.0A/min up to 350A and TBHT at 1.0A/min up to 210A
Wednesday, December 13, 2017, 14:53
IGP1 = 7.6e-7 Torr
IGP2 = 6.4e-7 Torr
TGHT = 350A, 5.85V
TBHT = 210A, 3.02V
TGHT and TBHT will be adjusted accordingly for temperature measurements...
Thursday, December 14, 2017, 09:16
IGP1 = 2.1e-7 Torr
IGP2 = 1.7e-7 Torr
TGHT = 385A, 6.80V
TBHT = 210A, 3.01V
Tapped up to TGHT = 400A, 7.11V
Stopped for temperature measurements.
Tapped up to TGHT = 450A, 8.20V
Friday, December 15, 2017, 09:50
IGP1 = 1.2e-7 Torr
IGP2 = 9.6e-8 Torr
TGHT = 350A, 5.82V
TBHT = 210A, 2.94V
Initiating auto-ramp to TGHT = 650A
Monday, December 18, 2017, 10:43
Temperature measurements done.
Initiated auto-cool.
TGHT cooling at 2.0A/min and TBHT at 1.0A/min.
Tuesday, December 19, 2017, 11:40
Vented in air and removed from evap2 today.
|
401
|
Monday, February 19, 2018, 14:16 |
Laura Lambert | Empty | 39530-3 | LP-FEBIAD | Done | Temperature measurements for ARIEL | Monday, February 19, 2018, 13:39
LP-FEBIAD loaded into evap2 this morning and pumped down.
Temperature measurements of the ionizer will be done by Fernando for ARIEL development.
Ta foil covering side holes on heat shield so no temp measurements can be done using OMEGA on side ports of evaporator as per request of Fernando
No Ta heat shields on container.
HS water valves opened, no leaks detected.
IGP1 = 2.75e-6 Torr
IGP2 = 1.42e-6 Torr
Tapped up to TGHT = 50A, 0.53V; TBHT = 50A, 0.56V
IGP1 = 2.64e-6 Torr
IGP2 = 1.35e-6 Torr
Initiating auto ramp for TGHT at 2.0A/min up to 350A and TBHT at 1.0A/min up to 210A
Tuesday, February 20, 2018, 09:15
IGP1 = 6.9e-7 Torr
IGP2 = 3.8e-7 Torr
TGHT = 350A, 5.98V
TBHT = 210A, 3.02V
TGHT and TBHT will be adjusted accordingly for temperature measurements...
Tuesday, February 27, 2018, 14:55
Temperature measurements done.
Initiated auto-cool.
TGHT cooling at 2.0A/min and TBHT at 1.0A/min.
Wednesday, February 28, 2018, 10:39
Tuesday, December 19, 2017, 11:40
Vented in air and removed from evap2 today.
|
402
|
Wednesday, February 28, 2018, 15:18 |
Laura Lambert | Empty | 42218-13 | LP-SIS | Done | Sintering TaC coating on UCx#22 container | Wednesday, February 28, 2018, 15:16
Container coated with TaC using 'flushing technique' and let dry.
Q-tip to plug ionizer became stuck in ionizer, removed manually with small drill bit.
Inspected ionizer with microscope, ionizer still good.
Cleaned ionizer tube with acetone.
Wrapped with 3 x Ta heat shields, incl center block
Currently pumping down in evap2
OMEGA slope = 0.98
Good vac at 3.0e-5, bad vac at 8.0e-5 Torr.
Thursday, March 01, 2018, 10:06
HW water valves opened yesterday, no leaks detected.
IGP1 = 2.8e-7 Torr
Tapped up manually to 40A.
Waited ~3hrs
Vacuum stable.
IGP1 = 5.3e-7 Torr
IGP2 = 5.4e-7 Torr
Initiating auto ramp for TGHT @ 1.0A/min to a max setpoint of 350A
Initiating auto ramp for TBHT @ 0.5A/min to a max setpoint of 230A
Once max setpoints achieved, will tap up manually to final desired temperature of 1900C
Thursday, March 01, 2018, 14:39
Vacuum started to climb very fast - auto-ramp was stopped.
Vacuum climbed up to IGP1 = 1.3e-4 Torr
Tapped TGHT back down to 80A from 90A, TBHT down to 50A from 60A.
Waited ~40min.
Vacuum stable, IGP1 = 2.6e-6 Torr
Restarting auto-ramp.
Thursday, March 01, 2018, 14:54
IGP1 = 2.1e-5 Torr
Vacuum climbing quite rapidly again, stopped auto-ramp and vacuum started to drop right away.
TGHT = 100A
TBHT = 56A
Waited ~10min
IGP1 = 6.0e-6 Torr
IGP2 = 5.2e-6 Torr
Decreasing ramping rate to 0.5A/min and 0.2A/min for the TGHT and TBHT respectively, and re-initiating auto-ramp.
Friday, March 02, 2018, 10:18
TGHT = 350A, 5.61V
TBHT = 230A, 4.04V
IGP1 = 4.3e-7 Torr
IGP2 = 3.8e-7 Torr
OMEGA = 1624C
Vacuum stable.
Increasing max setpoint of TGHT to 400A
Re-initiating auto-ramp of TGHT.
Friday, March 02, 2018, 11:04
TGHT = 372A, 6.05V
IGP1 = 5.0e-7 Torr
Increasing ramping rate for TGHT to 1.0A/min
Friday, March 02, 2018, 11:44
TGHT = 400A, 6.60V
IGP1 = 6.9e-7 Torr
OMEGA = 1780C
Vacuum stable.
Increasing max setpoint of TGHT to 430A
Re-initiating auto-ramp of TGHT.
Friday, March 02, 2018, 12:17
TGHT = 430A, 7.22V
OMEGA = 1866C
IGP1 = 9.5e-7 Torr
Tapped up manually to OMEGA = 1910C
TGHT = 445A, 7.57V
TBHT = 230A, 4.07V
IGP1 = 1.1e-6 Torr
IGP2 = 9.9e-7 Torr
Monday, March 05, 2018, 08:41
Remained at max setpoints over the weekend.
TGHT = 445A, 7.47V
TBHT = 230A, 4.06V
IGP1 = 1.87e-7 Torr
IGP2 = 1.47e-7 Torr
OMEGA = 1894C
Initiating auto-cool at 2.0A/min and 1.0A/min for the TGHT and TBHT respectively.
Tuesday, March 20, 2018, 14:53
Vented in air.
Container was transferred to glove box for loading ~1 week ago
Container looks good.
|
403
|
Thursday, March 08, 2018, 11:05 |
Marla Cervantes | Empty | 39530-3 | LP-FEBIAD | Done | Temperature measurements for ARIEL | Friday, March 09, 2018, 11:03
LP-FEBIAD loaded into evap2 and pumped down.
Temperature measurements of the ionizer will be done by Fernando for ARIEL development.
Ta foil covering side holes on heat shield so no temp measurements can be done using OMEGA on side ports of evaporator as per request of Fernando
No Ta heat shields on container.
HS water valves opened, no leaks detected.
IGP1 = 1.72e-7 Torr
IGP2 = 1.36e-7 Torr
Tapped up to TGHT = 50 A, 0.54 V; TBHT = 50 A, 0.45 V
IGP1 = 1.8e-6 Torr
IGP2 = 1.4e-6 Torr
Initiating auto ramp for TGHT at 2.0A/min up to 310A and TBHT at 1.0A/min up to 210A
Monday, March 12, 2018, 10:16
IGP1 = 8.8e-8 Torr
IGP2 = 6.6e-8 Torr
TGHT = 310A, 5.06V
TBHT = 210A, 2.98 V
TGHT and TBHT will be adjusted accordingly for temperature measurements
Tuesday, March 13, 2018, 16:00
Temperature measurements done.
Initiated auto-cool.
TGHT cooling at 2.0A/min and TBHT at 1.0A/min.
Wednesday, March 14, 2018, 16:03
Removed from evap2. |
407
|
Saturday, April 28, 2018, 16:12 |
John Wong | Empty | Tube container | | Done | TaC coating/sintering of Tube container | Saturday, April 28, 2018, 16:09
Container is coated with TaC and wrapped with TaC heatshield.
Will be used for carbonizing nanoSiC target materials.
Chamber is pumping down...
Sintering temp 1800C, est TGHT ~550A
Saturday, April 28, 2018, 18:08
Pressure at 5.e-6 Torr.
Initial auto-ramp at 1.0A/min reaching TGHT 500A. Monitoring temp.
Sunday, April 29, 2018, 23:37
Target temp stabilizes at 1800C with TGHT holding at 400A/7.02V for 24 hours. Pressure at 4.4 e-7 Torr.
Lower TGHT to 338A/5.51V to reach 1600C - This will temp/current will be used for carbonizing the nanoSiC fibers.
Holding TGHT overnight to determine temp stability.
Monday, April 30, 2018, 18:04
Temp is holding at 1600C, TGHT 338A/5.5V. Pressure at 3.0 e-7 Torr.
Initiated cooling down at 2A/min.
|
410
|
Wednesday, May 23, 2018, 15:21 |
Laura Lambert | Empty | | HP-FEBIAD-CTL | Done | Sintering TaC coating container for UCx#23 | Wednesday, May 16, 2018, 09:56
Container coated with TaC using 'flushing technique' and let dry over weekend.
Cleaned ionizer tube with acetone, no coating inside ionizer tube.
Wrapped with 3 x Ta heat shields, not incl center block
OMEGA slope = 0.98
*NOTE: realized after pumping down, filament on IGP2 is burnt out and needs replacing, will order a new one and use IGP1 for this process
Thursday, May 17, 2018, 13:15
HS water valves remained open since the last time evap2 was used, no leak check done.
Tapped up manually to 50A.
Waited ~1hr
Vacuum stable.
IGP1 = 1e-6 Torr
Initiating auto ramp for TGHT @ 0.2A/min to a max setpoint of 350A
Initiating auto ramp for TBHT @ 0.1A/min to a max setpoint of 230A
Once max setpoints achieved, will tap up manually to final desired temperature of 1900C
Friday, May 18, 2018, 13:00
Tapped up manually.
TGHT = 495A, 8.84V
TBHT = 230A, 3.26V
MIKRON = 2000C
Filament = 1910C
OMEGA = 1910C
Will remain at max setpoints over weekend.
Tuesday, May 22, 2018, 10:04
Remained at max setpoints over long wknd.
TGHT = 495A, 8.85V
TBHT = 230A, 3.26V
IGP1 = 2.47e-7 Torr
Initiating auto-cool at 2.0A/min and 1.0A/min for the TGHT and TBHT respectively.
Wednesday, May 23, 2018, 10:08
Vented in air this morning.
Container looks good!
Transferred into glove box.
|
|