Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  Evaporator_2, Page 22 of 34  Not logged in ELOG logo
  ID Date Author Target Material Target Oven W.O# Source Statusdown Subject Text Attachments
  380   Wednesday, July 19, 2017, 13:55 Marla Cervantes 40282-5TARGET BOATDoneSintering La(OH)3/C discs Wednesday, July 19, 2017, 13:44
Discs previously casted by Marla
and Pauline and weighed. 
 170724-LaC2-CarbothermalReduction-EPICS-PLOTS.PNGIMG-20170725-WA0018.jpg 
  382   Wednesday, August 02, 2017, 16:12 Marla Cervantes 40282-5 DoneSintering La(OH)3/C pellets Monday, July 31, 2017,  
Pellets previously pressed by
  
  384   Friday, August 04, 2017, 14:09 Laura Lambert 40282-5TARGET BOATDoneSintering La(OH)3/C pellets

    

       
            
  
  386   Monday, August 21, 2017, 17:32 John WongSiC TARGET BOATDoneCarbonization of sol-gel SiO2+CNTMonday, August 21, 2017, 17:09
Two pellets of sol-gel SiO2+CNT were
produced.  See lab book pg 44-46 for
  
  388   Friday, September 15, 2017, 10:56 Laura LambertTa42218-10HP-SISDoneConditioning Ta#54 Friday, September 15, 2017, 09:44
Target consists of 470 discs.
 Capture.JPG 
  389   Wednesday, September 27, 2017, 18:06 John Wongnp-SiC TARGET BOATDoneNS-npSiC & B3 pellets heat treatmentsWednesday, September 27, 2017, 18:05
 3 samples from NS-npSiC pellets,
pressured at 10T  (see lab book pg 53)
 Capture.JPG 
  390   Wednesday, October 04, 2017, 16:40 John Wongnp-SiC TARGET BOATDoneThermal treatment cast-pellet npSiC/PAN - det. sintering effectWednesday, October 04, 2017, 16:37
3 samples of npSiC/PAN cast-pellets,
see lab book p. 57 for details.
 1550C.JPG 
  391   Monday, November 06, 2017, 18:25 John Wongnp-SiC TARGET BOATDoneThermal treatment npSiC Horn vs Probe samples - P74Monday, November 06, 2017, 18:21
Samples of Horn and Probe - npSiC.
see pg 74.
 Capture1.JPG 
  392   Tuesday, November 21, 2017, 13:55 Laura LambertEmpty41882-4TARGET BOATDoneSintering TaC coating on fully enclosed target boat for graphite test Tuesday, November 21, 2017, 12:01
Boat coated with TaC using 'flushing
  
  393   Thursday, November 23, 2017, 15:10 Laura Lambert 41882-4TARGET BOATDoneGraphite insert test Thursday, November 23, 2017, 14:54
Graphite insert loaded into previously
TaC coated target boat.
 6x 
  394   Wednesday, November 29, 2017, 16:18 Laura LambertEmpty39530-3LP-FEBIADDoneTemperature measurements for ARIEL Wednesday, November 29, 2017, 16:17
LP-FEBIAD loaded into evap2 today
and currently pumping down.
  
  398   Friday, December 08, 2017, 15:42 Laura LambertEndcaps TARGET BOATDoneSintering TaC coating on endcaps and springs

    

       
            
  
  400   Wednesday, December 13, 2017, 10:55 Laura LambertEmpty39530-3LP-FEBIADDoneTemperature measurements for ARIEL Wednesday, December 13, 2017, 10:36
LP-FEBIAD loaded into evap2
  
  401   Monday, February 19, 2018, 14:16 Laura LambertEmpty39530-3LP-FEBIADDoneTemperature measurements for ARIEL Monday, February 19, 2018, 13:39
LP-FEBIAD loaded into
  
  402   Wednesday, February 28, 2018, 15:18 Laura LambertEmpty42218-13LP-SISDoneSintering TaC coating on UCx#22 container Wednesday, February 28, 2018, 15:16
Container coated with TaC using
  
  403   Thursday, March 08, 2018, 11:05 Marla CervantesEmpty39530-3LP-FEBIADDoneTemperature measurements for ARIEL  Friday, March 09, 2018, 11:03
LP-FEBIAD loaded into evap2
  
  404   Tuesday, April 17, 2018, 10:24 Laura LambertTa41177-3LP-SISDoneConditioning Ta#56 back-up target/ Temp measurements for Aurelia Tuesday, April 17, 2018, 10:20
Target consists of 470 discs.
  
  405   Thursday, April 19, 2018, 12:38 Laura LambertTa41177-3LP-SISDoneRound 2. Temp measurements for Aurelia target Ta#56 Thursday, April 19, 2018, 12:37
See elog i.d. 404 for target description
and first round of heating.
  
  406   Wednesday, April 25, 2018, 07:21 Aaron Schmidt   DoneHS swap evap 2Wednesday, April 25, 2018, 07:05: TGHT
& TBHT off
Wednesday, April 25, 2018, 07:15:
  
  407   Saturday, April 28, 2018, 16:12 John WongEmptyTube container  DoneTaC coating/sintering of Tube containerSaturday, April 28, 2018, 16:09
Container is coated with TaC and
wrapped with TaC heatshield. 
  
ELOG V2.9.2-2455