Entry  Tuesday, February 25, 2014, 16:10, Laura Lambert, , 40282-3, TARGET BOAT, Done, Sintering TaC coated end caps feb25-2014march3-2014(4).jpg
 Tuesday, February 25, 2014, 16:08
The target containers end-caps were coated with TaC spray and let dry.
The caps are inserted in the target boat vertically with no heat shield and no graphite foil.
Entry  Tuesday, February 18, 2014, 12:19, Laura Lambert, Empty, 40282-3, TARGET BOAT, Done, Sintering Ta target boat with TaC coating Photo_2-17-2014_3_54_11_PM.jpgIMG_20140221_102415969.jpgIMG_20140221_102337054.jpg
 Tuesday, February 18, 2014, 12:12
A new target boat was sprayed with TaC coating and let dry.
The target boat is NOT wrapped with Ta-heat shield.
Entry  Tuesday, February 11, 2014, 13:49, Laura Lambert, Empty, 38817-8, HP-SIS, Done, Sintering TaC coating container for TiC 
 Tuesday, February 11, 2014, 13:43
Target container is coated with TaC and wrapped with 3-Ta heat shields.
TGHT and TBHT will be ramped up to 820A and 300A, respectively.
Entry  Friday, January 31, 2014, 12:10, Laura Lambert, Empty, 39165-10, LP-SIS, Done, Sintering TaC coating container for Ta? 
 Friday, January 31, 2014, 11:28
Target container is coated with TaC.
The container is wrapped with 3 x Ta heat-shield.
Entry  Tuesday, January 28, 2014, 15:46, Laura Lambert, , 40282-4, TARGET BOAT, Failed, Sintering TaC coated end caps end_capsIMG_20140131_101959838.jpgfeb11-2014(3).jpgfeb11-2014(2).jpg
 Tuesday, January 28, 2014, 15:43
The target containers end-caps were coated with TaC spray and let dry.
Each cap is wrapped with a small piece of graphite foil and inserted in the target boat. [see attached photo]
Entry  Monday, January 20, 2014, 16:35, Laura Lambert, Empty, Ta-Target boat, , , Sintering Ta target boat with TaC coating 
 Monday, January 20, 2014, 16:32
A new target boat was sprayed with TaC coating and let dry this morning.
The target boat is NOT wrapped with Ta-heat shield.
    Reply  Tuesday, January 21, 2014, 11:33, Laura Lambert, Empty, 40282-4, TARGET BOAT, , Sintering Ta target boat with TaC coating 


    
        
            Laura Lambert wrote:
        
        
            
             Monday, January 20, 2014, 16:32
       Reply  Tuesday, January 21, 2014, 11:56, Laura Lambert, Empty, 40282-4, TARGET BOAT, , Sintering Ta target boat with TaC coating 


    
        
            Laura Lambert wrote:
        
        
            
            
            
          Reply  Wednesday, January 22, 2014, 09:49, Laura Lambert, Empty, 40282-4, TARGET BOAT, , Sintering Ta target boat with TaC coating 


    
        
            Laura Lambert wrote:
        
        
            
            
            
             Reply  Wednesday, January 22, 2014, 13:46, Laura Lambert, Empty, 40282-4, TARGET BOAT, , Sintering Ta target boat with TaC coating 


    
        
            Laura Lambert wrote:
        
        
            
            
            
                Reply  Wednesday, January 22, 2014, 15:13, John Wong, Empty, 40282-4, TARGET BOAT, , Sintering Ta target boat with TaC coating 


    
        
            Laura Lambert wrote:
        
        
            
            
            
                   Reply  Wednesday, January 22, 2014, 18:22, John Wong, Empty, 40282-4, TARGET BOAT, Problems, Sintering Ta target boat with TaC coating (IEVAP2:TBHT2 water signal problem) Screen_Shot_2014-01-22_at_6.10.50_PM.pngTargetboat_heatingup2.JPEG


    
        
            John Wong wrote:
        
        
            
            
            
              
                      Reply  Thursday, January 23, 2014, 16:22, Laura Lambert, Empty, 40282-4, TARGET BOAT, Problems resolved, Sintering Ta target boat with TaC coating IMG_20140123_144725917.jpgIMG_20140123_144736614.jpg


    
        
            John Wong wrote:
        
        
            
            
            
                         Reply  Friday, January 24, 2014, 14:25, Laura Lambert, Empty, 40282-4, TARGET BOAT, In progress, Sintering Ta target boat with TaC coating 


    
        
            Laura Lambert wrote:
        
        
            
            
            
                            Reply  Monday, January 27, 2014, 10:59, Laura Lambert, Empty, 40282-4, TARGET BOAT, In progress, Sintering Ta target boat with TaC coating 


    
        
            Laura Lambert wrote:
        
        
            
            
            
                               Reply  Tuesday, January 28, 2014, 11:57, Laura Lambert, Empty, 40282-4, TARGET BOAT, In progress, Sintering Ta target boat with TaC coating IMG_20140128_111526059.jpgIMG_20140128_111456815.jpg


    
        
            Laura Lambert wrote:
        
        
            
            
            
                                  Reply  Tuesday, January 28, 2014, 13:09, Laura Lambert, Empty, 40282-4, TARGET BOAT, Done, Sintering Ta target boat with TaC coating 


    
        
            Laura Lambert wrote:
        
        
            
            
            
Entry  Wednesday, January 15, 2014, 17:45, John Wong, Empty, 39165-9, LP-SIS, In progress, Sintering TaC coating container 
 Wednesday, January 15, 2014, 17:30
Target container is coated with TaC.  No Ta-heat shields are used.
TGHT will be ramped up to 580A at 0.2A/min. 
    Reply  Thursday, January 16, 2014, 13:06, Laura Lambert, Empty, 39165-9, LP-SIS, In progress, Sintering TaC coating container  


    
        
            John Wong wrote:
        
        
            
             Wednesday, January 15, 2014, 17:30
       Reply  Friday, January 17, 2014, 09:34, John Wong, Empty, 39165-9, LP-SIS, In progress, Sintering TaC coating container  


    
        
            Laura Lambert wrote:
        
        
            
            
            
              
          Reply  Friday, January 17, 2014, 10:18, Laura Lambert, Empty, 39165-9, LP-SIS, In progress, Sintering TaC coating container 


    
        
            John Wong wrote:
        
        
            
            
            
              
             Reply  Friday, January 17, 2014, 12:52, John Wong, Empty, 39165-9, LP-SIS, In progress, Sintering TaC coating container  


    
        
            Laura Lambert wrote:
        
        
            
            
            
                Reply  Monday, January 20, 2014, 16:30, Laura Lambert, Empty, 39165-9, LP-SIS, Done, Sintering TaC coating container  


    
        
            John Wong wrote:
        
        
            
            
            
              
Entry  Thursday, November 07, 2013, 09:38, Anders Mjos, , , , Problems resolved, Heat Shield cooling line twisted Twisted_Tube.jpgTwisted_Tube_Repaired.jpg
See attached photo.
The Heat Shield has been taken to the Machine Shop for repair.
Friday, November 08, 2013
Entry  Wednesday, November 06, 2013, 17:36, John Wong, TaC, Target Boat #2, , In progress, Testing TaC matrix coating  
The purpose of this experiment is to improve the TaC coating mixed with other metals as additives.  The coating solution will be sprayed on Ta metal
(0.015" thick, same thickness as the target container).
The samples will be sintered at ~ 1800C.  Once the process is completed, a graphite tube will be inserted into the tube, and then re-heated
Entry  Friday, November 01, 2013, 17:20, Anders Mjos, , , , Problems, Backing pump needs new filter 
The source of the poor vacuum in the backing line seems to be related to a dirty filter. We will try to find a replacement filter next week.
The problem seem to have started September 17th, when backing preassure CG1A went from 40 mTorr to 130 mTorr. CG1B remained around 30 mTorr.
    Reply  Monday, November 04, 2013, 14:02, Anders Mjos, , , , Maintenance, Backing pump replaced 
 

    
        
            Anders Mjos wrote:
        
        
            
Entry  Tuesday, October 29, 2013, 15:50, Anders Mjos, , , , In progress, Copper bars on TGHT and TBHT Current_and_Voltage.pdf
 Tuesday, October 29, 2013, 15:50: Pumping down
Wednesday, October 30, 2013, 09:32: Turbo started
Wednesday, October 30, 2013, 14:50: The Cu-bars were heated to 600A and 300A for TGHT and TBHT respectively.
Entry  Friday, October 04, 2013, 16:21, John Wong, Empty, , LP-SIS, Done, Sintering TaC coating on a LP target container to be used for C-grv tube test  LP_C_grv_tempcurve.PNGLP_C_grv_TGHT632_1960C.PNG
Friday, October 04, 2013, 15:37
A LP target container is coated with TaC.  The container is wrapped with 3 layers to heat shield.  
This container will be used for the graphite tube test.  
Entry  Thursday, September 26, 2013, 15:17, John Wong, Empty, 39814-VI-?, LP-IG-LIS, Done, Sintering empty target oven coated with TaC for UCx#8 UCx#8_container_TaC_coat_sintering.PNG
Thursday, September 26, 2013, 13:04
The LP-IG-LIS target container is coated with TaC. 
Container is wrapped with 3 layers of Ta heat shield and about to go through the sintering process.
Entry  Tuesday, September 17, 2013, 11:21, John Wong, Nb, target boat #3 (brand new!) , , , Nb thermo treatment (Bob's samples)  Nb_sample_setup.PNGNb_800C.PNG
Tuesday, September 17, 2013, 11:14
Target boat contains 5 Nb discs.  3 discs are wraps with 0.001" thin of Nb foil (99.8% pure), and 2 are wraps with 0.001" Ta foil
(see attachment#1)
    Reply  Thursday, September 19, 2013, 11:56, Laura Lambert, Nb, target boat #3 (brand new!) , , , Nb thermo treatment (Bob's samples)  Capture.PNG


    
        
            John Wong wrote:
        
        
            
            Tuesday, September 17, 2013, 11:14
       Reply  Thursday, September 19, 2013, 17:02, John Wong, Nb, target boat #3 (brand new!) , , , Nb thermo treatment (Bob's samples)  


    
        
            Laura Lambert wrote:
        
        
            
            
            
    Reply  Friday, September 20, 2013, 14:59, John Wong, Nb, target boat #3 (brand new!) , , , Nb thermo treatment (Bob's samples)  


    
        
            John Wong wrote:
        
        
            
            Tuesday, September 17, 2013, 11:14
       Reply  Monday, September 23, 2013, 16:18, John Wong, Nb, target boat #3 (brand new!) , , , Nb thermo treatment (Bob's samples)  


    
        
            John Wong wrote:
        
        
            
            
            
Entry  Tuesday, August 27, 2013, 17:01, John Wong, , targetboat (TaC coated), , Done, Sintering TaC coated regular caps  Sintering__endcap_.jpg
Tuesday, August 27, 2013, 16:48
Target boat is filled with TaC coated endcaps (brown) and some partial sinterred ones (gray) from before.  (see attachment#1).
The container is wrapped with Ta heat-shield.
    Reply  Thursday, August 29, 2013, 11:53, Laura Lambert, , targetboat (TaC coated), , Done, Sintering TaC coated regular caps  


    
        
            John Wong wrote:
        
        
            
            Tuesday, August 27, 2013, 16:48
Entry  Wednesday, August 21, 2013, 12:30, John Wong, Ta, 38817-10, HP-SIS, Done, Conditioning Ta target  Ta#41_conditioning.PNG
Wednesday, August 21, 2013, 12:28
Container is filled with 400 discs of Ta foils, and wrapped with 3 layers of Ta heat shields.
No caps are inserted during the conditioning. 
Entry  Thursday, August 08, 2013, 15:41, Laura Lambert, NiO, 39530-6, HP-FEBIAD, In progress, Sintering NiO # 2 NiO#2.PNG
Thursday, August 08, 2013, 15:19
NiO target materials loaded into the container yesterday.
Total discs = 530, (5 discs/pack)
    Reply  Thursday, August 08, 2013, 17:28, John Wong, NiO, 39530-6, HP-FEBIAD, Done, Sintering NiO # 2 


    
        
            Laura Lambert wrote:
        
        
            
            Thursday, August 08, 2013, 15:19
Entry  Monday, July 22, 2013, 15:03, John Wong, Empty, 38634-7, LP-SIS, Done, Sintering empty target oven coated with TaC for UCx#7 
Monday, July 22, 2013, 15:00
Target container is coated with TaC - this container will be used for UCx#7.
Container is wrapped with 3 layers of Ta, including the back-block.
Entry  Monday, June 17, 2013, 16:59, Laura Lambert, SiC, 38481-6, HP-FEBIAD, Done, Sintering of SiC #29 
Monday, June 17, 2013, 16:57
Target is loaded with 510 SiC discs
Container was previously coated with TaC and sintered
    Reply  Tuesday, June 18, 2013, 16:40, John Wong, SiC, 38481-6, HP-FEBIAD, Done, Sintering of SiC #29 


    
        
            Laura Lambert wrote:
        
        
            
            Monday, June 17, 2013, 16:57
Entry  Tuesday, May 28, 2013, 17:50, John Wong, , Target Boat #2 , , Done, Sintering TaC coated end caps 
Tuesday, May 28, 2013, 17:36
The target containers endcaps were coated with TaC solution and let dry. 
Each cap is wrapped with a small piece of graphite foil and inserted in the target boat.