Friday, November 02, 2018, 17:36, Marla Cervantes, Empty, 39530-1, LP-FEBIAD, Done, Graphite insert test #1
|
Friday, November 02, 2018, 17:33
A new LP-FEBIAD was coated and syntered (e-log 421 Evaporator_2)
The container was loaded with an empty graphite insert.
Graphite insert mass = 24.1724 g
A current of 440 A TGHT and 230 A TBHT will be inputed to the container
EVAP2 currently pumping down
Saturday, November 03, 2018, 08:04
IGP1 = 5.66e-7 Torr
Tapping manually to 40 A on TGHT and TBHT
Then auto/ramp wiill be set to 2 A/min on TGHT and 1 A/min on TBHT
Maximum temperature achieve 1802 C
Tuesday, November 06, 2018, 14:49
Container has reduced and increased its temperature from ~1760 to 1802 C.
IGP1 3.44e-7 Torr
TGHT 441.7 A and 7.7 V
TBHT 233.2 A and 3.2 V
Wednesday, November 07, 2018, 08:32
Temperature 1785 C
IGP1 2.90e-7 Torr
TGHT 441.38 A and 7.7 V
TBHT 233.2 A and 3.2 V
Friday, November 09, 2018, 17:26
Temperature 1787 C
IGP1 2.12 -7 Torr
TGHT 442.03 A and 7.7 V
TBHT 233.06 A and 3.19 V
Tuesday, November 13, 2018, 14:13: Turbos, power supplies off. Prepare for venting. |
Wednesday, April 17, 2019, 09:06, Marla Cervantes, , 38295-10, LP-FEBIAD, Done, Graphite insert test
|
Wednesday, April 17, 2019, 09:03
An uncoated target container was loaded with a graphite insert and wrapped with 3 tantalum layers,
Two Ta caps were used
EVAP2 was pumped down, IGP1 = 5.14e-7 Torr
The TGHT and TBHT current was tapped to 40 A manually
Autoramp was set to TGHT 1A/min to 500 A
and TBHT 0.5A/min to 230 A.
The temperature reached 2000 C as planned
the target container stayed at that temperature for 1 week.
Tuesday, April 23, 2019, 10:00
EVAP2 was vented and the target container was removed.
The container crystalized but did not break. |
Tuesday, May 14, 2019, 13:57, Aaron Schmidt, , , LP-FEBIAD, Done, Test FEBIAD
|
Tuesday, May 14, 2019, 13:56: Removed old HS w/ flexible lines & swapped in the FEBIAD. (HS waterlines are still purged.) Roughing.
Tuesday, May 14, 2019, 14:06: Turbo pump on.
Tuesday, May 14, 2019, 14:22: Waterlines opened. Vacuum ok @ 5.34e-05T & dropping.
Wednesday, May 15, 2019, 06:21
IGP1 = 5.99e-7 Torr,
manually tapping to 40 A.
Autoramp set to 2A/min to TGHT=580 A and TBHT=290 A
Tuesday, May 21, 2019, 08:13
IGP1= 1.43e-7 Torr
TGHT = 580.875 A, 11.22 V
TBHT = 4.45 V, 309.219 A
Temperature 1004 C measured at Ta foil
Ramp-down was initiated with IGP1 = 1.423e-07 Torr
Ramp rate = 2A/min for TGHT and 1/min for TBHT
EVAP2 was vented with air
Tuesday, May 21, 2019, 14:20 Test FEBIAD removed - AS. |
Tuesday, December 03, 2019, 08:24, Aaron Schmidt, , , LP-FEBIAD, In progress, Temperature mapping.
|
Tuesday, December 03, 2019, 08:15: Waterlines opened. Vacuum ok @ 4.06e-07T
Tuesday, December 03, 2019, 08:23: Unable to start due to flow trip? PS off.
Tuesday, December 03, 2019, 08:25: Turbo & Vac off.
Tuesday, December 03, 2019, 08:51: Vented. Investigate. Install outer shields. Loose wire found on exterior paddle. Trip gone. Roughing.
Tuesday, December 03, 2019, 09:03: Turbo pump on.
Tuesday, December 03, 2019, 09:12: PS on. Vacuum @ 4.46e-05T and dropping.
Wednesday, December 04, 2019, 10:21: Manually tapped up the TGHT / TBHT to 35 / 10 A.
Wednesday, December 04, 2019, 10:22: Auto-ramping TGHT / TBHT to 300 / 150 A @ 2 A per min.
FM
Wednesday, December 04, 2019, 13:48: Auto-ramping TGHT / TBHT to 350 / 175 A @ 2 A per min.
Wednesday, December 04, 2019, 14:20: Auto-ramping TGHT / TBHT to 400/ 190 A @ 2 A per min.
Thursday, December 05, 2019, 10:58: Checking the striptool, approximately 30 minutes ago there was an oscillatory behaviour on the TGHT power. It went down to 0 in a very short time.
Temperature measurements were recorded and indicate a 70C difference from before the event.
Thursday, December 05, 2019, 15:08: Auto-ramping TGHT / TBHT to 450/ 230A @ 2 A per min.
Thursday, December 05, 2019, 19:05: Checking the striptool, at around 6 pm the TGHT power supply trip and didn't come back.
Thursday, December 05, 2019, 19:06: Drop in temperature indicates the target stop glowing.
Thursday, December 05, 2019, 19:07> Turning off power supply on EPICS and setting the slider to 0A.
I will ramp up TGHT in the morning while in the lab.
Friday, December 06, 2019, 14:55: Ramping down TBHT to 0A @ 2A/min
Tuesday, December 10, 2019, 09:11: Manually tapped up the TGHT / TBHT to 35 / 10 A
Tuesday, December 10, 2019, 09:12: Auto-ramping TGHT / TBHT to 400/ 230A @ 2 A per min.
Aborted |
Thursday, September 10, 2020, 07:53, Aaron Schmidt, Empty, 41790-8, LP-FEBIAD, Done, Fernando FEBIAD / Anode testing.
|
FEBIAD installed. Anode PS installed. ANODE connected!.
Leak check
Thursday, September 10, 2020, 07:46: Vacuum @ 6.30e-07T
Thursday, September 10, 2020, 07:47: HS Waterline open. Stable vacuum.
Thursday, September 10, 2020, 07:51: Auto-ramp TGHT / TBHT to 400 / 200 A @ 2 A per min.
FM
Thursday, September 10, 2020, 13:28: Pyrometer aligned. Current reading 1106.7 @ slope=0.9
Thursday, September 10, 2020, 13:46: Auto-ramp TGHT / TBHT to 580/ 250A @ 2 A per min.
Thursday, September 10, 2020, 13:47: Recording pyrometer data
Thursday, September 10, 2020, 15:33: Auto-ramp finished. Temperature=1568.0 @slope=0.9
Thursday, September 10, 2020, 15:35: Voltage power supply limited to 150 mA.
Thursday, September 10, 2020, 15:36: Voltage power supply is set to output. Nothing strange on the other PS.
Thursday, September 10, 2020, 15:42: Slowly increased the voltage to 150 V but nothing read. two times during the voltage sweep the current on the Ps showed 1mA. Nothing strangeon the vacumm or the other power supply voltages
Thursday, September 10, 2020, 15:45: Auto-rampup TBHT to 290 @ 2A/min
Thursday, September 10, 2020, 16:08: Voltage sweep
Thursday, September 10, 2020, 17:24: Auto-rampup to 300 @ 2A/min
Friday, September 11, 2020, 11:05: Auto-ramping to 290 @ -2A/min
Friday, September 11, 2020, 13:22: auto-ramping to 305 @ 2A/min
Friday, September 11, 2020, 14:10: The power supply is not reading current anymore. At 305 A I couldn't get any reading. I lowered the current to 290 A and the PS displays 0 mA even at 500 V, whereas before it showed 13 mA.
Vacuum looks normal not any sort of spike.
I will open the system to inspect the interior.
Friday, September 11, 2020, 14:15: Auto-cooling to 0 A TGHT/TBHT @-2A/min
Saturday, September 12, 2020, 10:52: Venting
Saturday, September 12, 2020, 14:00: Confirmed anode de-attached. I will spot welded again.
Saturday, September 12, 2020, 18:29: After many failures I aborted the spot welding. The anode ended up looking pretty bad.
Sunday, September 13, 2020, 19:06: Opened waterlines. Vacuum still decreasing.
Monday, September 14, 2020, 09:12: Vacuum @ 8.15e-7 T. and decreasing. I will start the ramping now.
Monday, September 14, 2020, 09:28: Auto-ramping to 400/200 A @ 4/min (1 A/15 s) .
No reading on the 2-color pyrometer channel. 1-color channels indicate around 1000C
Monday, September 14, 2020, 12:49: Recording temperature and vacuum. Auto-ramp TBHT to 210 @ 4A/min.
Monday, September 14, 2020, 12:57: Emissivity slope sweep. Only "under" is being shown
Monday, September 14, 2020, 12:58: Auto-ramp TBHT to 220 @ 4A/min.
Monday, September 14, 2020, 13:05: Emissivity slope sweep. Only "under" is being shown
Monday, September 14, 2020, 13:06: Auto-ramp TBHT to 240 @ 4A/min.
Monday, September 14, 2020, 13:17: Auto-ramp TBHT to 250 @ 4A/min.
Monday, September 14, 2020, 13:22: Emissivity slope sweep. Only "under" is being shown
Monday, September 14, 2020, 13:23: Auto-ramp TBHT to 260 @ 4A/min.
Monday, September 14, 2020, 13:27 : Emissivity slope sweep. Only "under" is being shown
Monday, September 14, 2020, 13:27 : Auto-ramp TBHT to 275 @ 4A/min.
Monday, September 14, 2020, 13:36: Emissivity slope sweep. Only "under" is being shown for the 2-color channel. 1-color channel displays around 1200 C. Maybe there is a different cutoff for the 2-color channel
Monday, September 14, 2020, 13:38: At 400V the PS reads back 1mA
Monday, September 14, 2020, 13:39 : Auto-ramp TBHT to 290 @ 4A/min.
Monday, September 14, 2020, 17:41: Roughing
Tuesday, September 15, 2020, 07:03: Vacuum stable at 4.65e-7T.
Tuesday, September 15, 2020, 07:03: Auto-ramp TGHT / TBHT to 400/ 200A @ 4 A per min.
Tuesday, September 15, 2020, 10:00: Auto-ramp TGHT to 500 @ 4 A per min.
Tuesday, September 15, 2020, 11:13: Auto-ramp TBHT to 250@ 4 A per min.
Tuesday, September 15, 2020, 15:44: There is a short inside the system. I thought it might be the vanadium wire but increasing the tbht current did not indicate a clear evaporation so I don't think this is the case.
I'll ramp down to 0 at 8A/min to open and inspect. My measurements don't make any sense without both the pyrometer and the anode leakage current reading.
Tuesday, September 15, 2020, 15:49: Auto-cooling TGHT/TBHT to 0A at 8A/min (2A /15 s).
Tuesday, September 15, 2020, 16:00: Auto-cooling aborted, the system is no longer current limited. The contact causing the issue probably moved while cooling.
***many ramp ups.downs, Temperature measurements, voltage sweeps, inverse temperature estimations. Absolute temperature measurements for when the vanadium wire melted, the pyrometer was already reading 1920, a slightly adjust on the emissivity slope move it to 1911C
Tuesday, September 15, 2020, 18:47: Ramp down TGHT/TBHT to 500/250 A @ -1A/min
Tuesday, September 15, 2020, 18:48: Done for today.
Wednesday, September 16, 2020, 10:02: Auto-ramp up TGHT/TBHT to 580/285 A @ 2A/min
Wednesday, September 16, 2020, 12:59: Auto-ramp up TGHT/TBHT to 600 A @ 2 A/min
Wednesday, September 16, 2020, 13:45: Auto-ramp up TBHT to 290 A @ 1A/min
Wednesday, September 16, 2020, 18:45: Auto-ramp down TGHT/TBHT to 400/200 A @ -2A/min
Thursday, September 17, 2020, 08:46: Auto-ramp up TBHT to 285 A @ 2A/min
Thursday, September 17, 2020, 12:03: Auto-cooling TGHT/TBHT to 0A @ -4A/min
Thursday, September 17, 2020, 13:49: Turbo off. Roughing pump off |
Tuesday, February 28, 2023, 07:21, Darwin Ortiz Rosales, Ta, 44692-7, LP-FEBIAD, Done, TaC coating sintering
|
Tuesday, February 28, 2023, 07:19
Ta LP-FEBIAD was coated with TaC and wrapped with Ta heat-shields (4 layers)
Desired temperature = 1850 C , TBHT will be set fixed at 230A (max).
Evap 2 will be pumped down over previous night
OMEGA slope= 0.990
Good vacuum = 5.00 e-4 Torr
Bad vacuum = 5.00 e-2 Torr
IGP1= 1.2 e-06 Torr
Start autoramp @1A/min to 80 A then autoramp heat @1A/min to 150 A. Then autoramp TGHT to 400 A and TBHT to 230A.1
Tuesday, February 28, 2023, 15:39
Will ramp to 426A to 1850C as per regression line.
Tuesday, February 28, 2023, 15:57
Will start cooling at 8 pm
OMEGA= 1858 C
IGP1= 2.12e-06 Torr
TGHT =426 A, 7.5 V
TBHT = 230 A, 3.2 V
Tuesday, February 28, 2023, 19:58
OMEGA = 1858 C
IGP1 = 1.04e-06 Torr
TGHT =426 A, 7.6 V
TBHT = 230 A, 3.2 V
rampdown TGHT at -2A/min and TBHT @ -1A/min
|
Saturday, March 04, 2023, 08:34, Darwin Ortiz Rosales, TiC, 44692-7, LP-FEBIAD, Done, TiC230301 conditioning
|
Saturday, March 04, 2023, 08:29
Ta LP-FEBIAD with 369 discs plus 5 removable discs wrapped with 3 Ta heat-shields (in layers)
Evap 2 will be pumped down over previous night
Desired temperature = 1500 C as in Elog #52 , TGHT will be ramped up to 300 A and then adjusted manually to 1500C if temperature readings are ok
otherwise will use plot from coating sintering to approximate 1500C.
TBHT will be set fixed at 230A (max).
Good vacuum = 5.00 e-4 Torr
Bad vacuum = 5.00 e-2 Torr
IGP1= 3.4 e-07 Torr
Start autoramp @2A/min to 80 A then autoramp heat @1A/min to 230 A (both TGHT and TBHT)
Then autoramp TGHT to 300 A
-
Saturday, March 04, 2023, 22:27
At 332 A, 5.6V on TGHT, 230 A, 3.3 V TBHT
OMEGA = 1370 C
Will autoramp to 375A on TGHT @0.25A/min then leave for 4 hours at 1500C
Cooling should start at 6 am march 5th
OMEGA reading 1498 @ 2 am
Sunday, March 05, 2023, 06:03
OMEGA reading 1442 C @550am
ramped up to 394 A on TGHT and OMEGA reads 1500 C
will leave for 40 minutes than test ramp up to observe outgassing
d until 715 am then begin rampdown.
Sunday, March 05, 2023, 07:22
ramped to 425 to test further outgassing temperature increase observed but only while increasing current.
OMEGA = 1590 C
TGHT= 425A, 7.6V
TBHT= 230A, 3.3V
IGP1=2.0e-06 Torr
ramping down @-2A/min on TGHT and -1A/min TBHT
|
Thursday, April 20, 2023, 07:00, Darwin Ortiz Rosales, TaC, 41790-7, LP-FEBIAD, Done, TaC coating sintering
|
Thursday, April 20, 2023, 06:59
The coated container was wrapped in 3 Ta foil heatshields.
Target temperature on OMEGA= 1830-1900 C
OMEGA slope:= 0.990
Target time at max temperature = 4 hours
Final Current TBHT= 230A
Final TGHT current= ~400A (adjustable)
Good vacuum = 5.0 e-04 Torr
Bad vacuum = 5.0E-02 Torr
Thursday, April 20, 2023, 07:02
Started TBHT and TBHT ramp at 1A/min to 230A
Thursday, April 20, 2023, 09:55
From 170 A started ramping at 2A/min to 230 A on both TGHT and TBHT
Thursday, April 20, 2023, 10:27
Starting ramp on TGHT to 300A, TBHT kept at 230A, 3.0 V
Thursday, April 20, 2023, 11:19
ramping at 4A/min (2A/30s) to 340 A on TGHT
Thursday, April 20, 2023, 11:40
After plot, ramping @ 2A/min to 460A on TGHT expected to reeach at 1245. 4 hours at 4:45 pm
Thursday, April 20, 2023, 13:44
Note that top temperature was 1835C @ 480 A, 7.9V
Thursday, April 20, 2023, 17:00
Start rampdown at -2A/min TGHT and -1A/min TBHT
Monday, April 24, 2023, 13:35
The coating is not as good as expected. Maybe too much time between coating and sintering. Will not use for TiC target. |
Monday, April 24, 2023, 09:12, Darwin Ortiz Rosales, TaC, 44692-5, LP-FEBIAD, Done, TaC coating sintering
|
Sunday, April 23, 2023, 07:23
The coated container was wrapped in 3 Ta foil heatshields.
Target temperature on OMEGA= 1850-1900 C
OMEGA slope:= 0.990
Target time at max temperature = 4 hours
Final Current TBHT= 230A
Final TGHT current= ~450A (adjustable)
Good vacuum = 5.0 e-04Torr
Bad vacuum = 5.0E-02 Torr
Interlock tripped (HS water flow, SP6, GE, CHIL <--supposed to be bypassed)
Monday, April 24, 2023, 13:24
In the morning Carla found some loose wires behind EVAP 2. Wires connecting the flow-meter. The interlock problem was fixed as it was noted there was normal HS water flow.
Started ramp up at 1A/min to 230 A. The first outgassing bump observed and wil start autoramp @ 2A/min on both TGHT and TBHT (target is 400A on TGHT and 230A on TBHT).
Monday, April 24, 2023, 16:24
Reached 480A on TGHT at 4 pm. Manually tapped to 500 A on TGHT , OMEGA=1853C. Will keep until 8 pm.
Monday, April 24, 2023, 19:56
OMEGA= 1853 C
IGP1= 1.5e-06 Torr
TGHT = 500A, 8.5V
TBHT= 230A, 3.1V
rampdown TGHT @-2A/min and TBHT @ -1A/min
|
Wednesday, April 26, 2023, 09:48, Darwin Ortiz Rosales, TiC, 44692-5, LP-FEBIAD, Done, TiC230425
|
Wednesday, April 26, 2023, 09:32
LP FEBIAD loaded with 367 TiC discs and 4 TiC removable discs for analyses
50 packs of 5 and the rest are singles
TaC coated (sintered) springs placed at both ends
Initial total Weight = 521.83 g
Initial heating @ 1A/min to 400 A on TGHT and 280A on TBHT
OMEGA slope = 0.99
Vacuum limits up to 200A: 3.0e-05 Torr -- 5.0e-04 Torr
Vacuum limit up after 200A: 3.0e-05 Torr -- 5.0e-05 Torr
No Ta heat-shields used
Initial IGP1 = 4.1e-07 Torr
Wednesday, April 26, 2023, 09:49
Starting initial ramp up to 200A on both TGHT and TBHT @ 1A/min
Wednesday, April 26, 2023, 12:50
Around 120A on TGHT, the pressure started to slowly drop. First outgassing done.
Wednesday, April 26, 2023, 14:03
IGP1 = 6.0 e-05 Torr
TGHT = 200 A, 2.7V
TBHT = 200 A, 2.6 v
OMEGA = Below lower limit
Waiting for pressure to fall below 5e0-5 Torr. Will change bad vacuum to 5.0e-05 Torr and then continue ramping @1A/min to 400 A on TGHT and 280 A on TBHT.
Wednesday, April 26, 2023, 14:13
IGPI= 4.2 e-05 Torr
starting ramping to 400 A on TGHT and 280A on TBHT
Wednesday, April 26, 2023, 14:26
The IGP1 pressure just fell below 3.0e-05 Torr and ramping has resumed
Wednesday, April 26, 2023, 14:42
pressure hovering around good vacuum so very slow progress.
Wednesday, April 26, 2023, 15:12
TGHT= 223 A, 3.1 V
TBHT = 226 A, 3.0 V
Set ramp rate is 1A/min but real rate is slightly less than 0.5A/min due to pressure fluctuation. |
Wednesday, April 26, 2023, 18:20, Carla Babcock, TiC, 44692-5, LP-FEBIAD, In progress, TiC230425
|
Darwin Ortiz Rosales wrote: |
Wednesday, April 26, 2023, 09:32
LP FEBIAD loaded with 367 TiC discs and 4 TiC removable discs for analyses
50 packs of 5 and the rest are singles
TaC coated (sintered) springs placed at both ends
Initial total Weight = 521.83 g
Initial heating @ 1A/min to 400 A on TGHT and 280A on TBHT
OMEGA slope = 0.99
Vacuum limits up to 200A: 3.0e-05 Torr -- 5.0e-04 Torr
Vacuum limit up after 200A: 3.0e-05 Torr -- 5.5e-05 Torr
No Ta heat-shields used
Initial IGP1 = 4.1e-07 Torr
Wednesday, April 26, 2023, 09:49
Starting initial ramp up to 200A on both TGHT and TBHT @ 1A/min
Wednesday, April 26, 2023, 12:50
Around 120A on TGHT, the pressure started to slowly drop. First outgassing done.
Wednesday, April 26, 2023, 14:03
IGP1 = 6.0 e-05 Torr
TGHT = 200 A, 2.7V
TBHT = 200 A, 2.6 v
OMEGA = Below lower limit
Waiting for pressure to fall below 5e0-5 Torr. Will change bad vacuum to 5.0e-05 Torr and then continue ramping @1A/min to 400 A on TGHT and 280 A on TBHT.
Wednesday, April 26, 2023, 14:13
IGPI= 4.2 e-05 Torr
starting ramping to 400 A on TGHT and 280A on TBHT
Wednesday, April 26, 2023, 14:26
The IGP1 pressure just fell below 3.0e-05 Torr and ramping has resumed
Wednesday, April 26, 2023, 14:42
pressure hovering around good vacuum so very slow progress.
Wednesday, April 26, 2023, 15:12
TGHT= 223 A, 3.1 V
TBHT = 226 A, 3.0 V
Set ramp rate is 1A/min but real rate is slightly less than 0.5A/min due to pressure fluctuation.
|
Vacuum spike at 300A.
Currently:
TGHT= 316A, 4.6V
TBHT=283A, 3.9V
Wednesday, April 26, 2023, 18:18 Ramping TBHT down from 280A to 270A |
Wednesday, April 26, 2023, 22:26, John Wong, TiC, 44692-5, LP-FEBIAD, In progress, TiC230425
|
Carla Babcock wrote: |
Darwin Ortiz Rosales wrote: |
Wednesday, April 26, 2023, 09:32
LP FEBIAD loaded with 367 TiC discs and 4 TiC removable discs for analyses
50 packs of 5 and the rest are singles
TaC coated (sintered) springs placed at both ends
Initial total Weight = 521.83 g
Initial heating @ 1A/min to 400 A on TGHT and 280A on TBHT
OMEGA slope = 0.99
Vacuum limits up to 200A: 3.0e-05 Torr -- 5.0e-04 Torr
Vacuum limit up after 200A: 3.0e-05 Torr -- 5.5e-05 Torr
No Ta heat-shields used
Initial IGP1 = 4.1e-07 Torr
Wednesday, April 26, 2023, 09:49
Starting initial ramp up to 200A on both TGHT and TBHT @ 1A/min
Wednesday, April 26, 2023, 12:50
Around 120A on TGHT, the pressure started to slowly drop. First outgassing done.
Wednesday, April 26, 2023, 14:03
IGP1 = 6.0 e-05 Torr
TGHT = 200 A, 2.7V
TBHT = 200 A, 2.6 v
OMEGA = Below lower limit
Waiting for pressure to fall below 5e0-5 Torr. Will change bad vacuum to 5.0e-05 Torr and then continue ramping @1A/min to 400 A on TGHT and 280 A on TBHT.
Wednesday, April 26, 2023, 14:13
IGPI= 4.2 e-05 Torr
starting ramping to 400 A on TGHT and 280A on TBHT
Wednesday, April 26, 2023, 14:26
The IGP1 pressure just fell below 3.0e-05 Torr and ramping has resumed
Wednesday, April 26, 2023, 14:42
pressure hovering around good vacuum so very slow progress.
Wednesday, April 26, 2023, 15:12
TGHT= 223 A, 3.1 V
TBHT = 226 A, 3.0 V
Set ramp rate is 1A/min but real rate is slightly less than 0.5A/min due to pressure fluctuation.
|
Vacuum spike at 300A.
Currently:
TGHT= 316A, 4.6V
TBHT=283A, 3.9V
Wednesday, April 26, 2023, 18:18 Ramping TBHT down from 280A to 270A
|
Wednesday, April 26, 2023, 22:12
TGHT = 400A, 6.1V; TBHT = 274A/3.7V. Temp is holding sturdy ~1100 C and will leave it overnight.
Pressure is coming down, currently at 8.8 e-6 Torr. See attachment for the overview.
TGHT will continue to ramp up tomorrow morning; check the pressure to ensure it has come down below 5e-6 Torr before proceeding. Refer to the instructions for details.
|
Thursday, April 27, 2023, 06:30, Darwin Ortiz Rosales, TiC, 44692-5, LP-FEBIAD, Done, TiC230425
|
John Wong wrote: |
Carla Babcock wrote: |
Darwin Ortiz Rosales wrote: |
Wednesday, April 26, 2023, 09:32
LP FEBIAD loaded with 367 TiC discs and 4 TiC removable discs for analyses
50 packs of 5 and the rest are singles
TaC coated (sintered) springs placed at both ends
Initial total Weight = 521.83 g
Initial heating @ 1A/min to 400 A on TGHT and 280A on TBHT
OMEGA slope = 0.99
Vacuum limits up to 200A: 3.0e-05 Torr -- 5.0e-04 Torr
Vacuum limit up after 200A: 3.0e-05 Torr -- 5.5e-05 Torr
No Ta heat-shields used
Initial IGP1 = 4.1e-07 Torr
Wednesday, April 26, 2023, 09:49
Starting initial ramp up to 200A on both TGHT and TBHT @ 1A/min
Wednesday, April 26, 2023, 12:50
Around 120A on TGHT, the pressure started to slowly drop. First outgassing done.
Wednesday, April 26, 2023, 14:03
IGP1 = 6.0 e-05 Torr
TGHT = 200 A, 2.7V
TBHT = 200 A, 2.6 v
OMEGA = Below lower limit
Waiting for pressure to fall below 5e0-5 Torr. Will change bad vacuum to 5.0e-05 Torr and then continue ramping @1A/min to 400 A on TGHT and 280 A on TBHT.
Wednesday, April 26, 2023, 14:13
IGPI= 4.2 e-05 Torr
starting ramping to 400 A on TGHT and 280A on TBHT
Wednesday, April 26, 2023, 14:26
The IGP1 pressure just fell below 3.0e-05 Torr and ramping has resumed
Wednesday, April 26, 2023, 14:42
pressure hovering around good vacuum so very slow progress.
Wednesday, April 26, 2023, 15:12
TGHT= 223 A, 3.1 V
TBHT = 226 A, 3.0 V
Set ramp rate is 1A/min but real rate is slightly less than 0.5A/min due to pressure fluctuation.
|
Vacuum spike at 300A.
Currently:
TGHT= 316A, 4.6V
TBHT=283A, 3.9V
Wednesday, April 26, 2023, 18:18 Ramping TBHT down from 280A to 270A
|
Wednesday, April 26, 2023, 22:12
TGHT = 400A, 6.1V; TBHT = 274A/3.7V. Temp is holding sturdy ~1100 C and will leave it overnight.
Pressure is coming down, currently at 8.8 e-6 Torr. See attachment for the overview.
TGHT will continue to ramp up tomorrow morning; check the pressure to ensure it has come down below 5e-6 Torr before proceeding. Refer to the instructions for details.
|
Thursday, April 27, 2023, 06:27
IGP1= 1.7e-06 Torr
OMEGA= 1097 C
TGHT= 400A, 6.2V
TBHT= 273A, 3.7 V
Starting ramp up of TGHT @0.2A/min set to 550A |
Thursday, April 27, 2023, 21:48, Carla Babcock, TiC, 44692-5, LP-FEBIAD, In progress, TiC230425
|
Darwin Ortiz Rosales wrote: |
John Wong wrote: |
Carla Babcock wrote: |
Darwin Ortiz Rosales wrote: |
Wednesday, April 26, 2023, 09:32
LP FEBIAD loaded with 367 TiC discs and 4 TiC removable discs for analyses
50 packs of 5 and the rest are singles
TaC coated (sintered) springs placed at both ends
Initial total Weight = 521.83 g
Initial heating @ 1A/min to 400 A on TGHT and 280A on TBHT
OMEGA slope = 0.99
Vacuum limits up to 200A: 3.0e-05 Torr -- 5.0e-04 Torr
Vacuum limit up after 200A: 3.0e-05 Torr -- 5.5e-05 Torr
No Ta heat-shields used
Initial IGP1 = 4.1e-07 Torr
Wednesday, April 26, 2023, 09:49
Starting initial ramp up to 200A on both TGHT and TBHT @ 1A/min
Wednesday, April 26, 2023, 12:50
Around 120A on TGHT, the pressure started to slowly drop. First outgassing done.
Wednesday, April 26, 2023, 14:03
IGP1 = 6.0 e-05 Torr
TGHT = 200 A, 2.7V
TBHT = 200 A, 2.6 v
OMEGA = Below lower limit
Waiting for pressure to fall below 5e0-5 Torr. Will change bad vacuum to 5.0e-05 Torr and then continue ramping @1A/min to 400 A on TGHT and 280 A on TBHT.
Wednesday, April 26, 2023, 14:13
IGPI= 4.2 e-05 Torr
starting ramping to 400 A on TGHT and 280A on TBHT
Wednesday, April 26, 2023, 14:26
The IGP1 pressure just fell below 3.0e-05 Torr and ramping has resumed
Wednesday, April 26, 2023, 14:42
pressure hovering around good vacuum so very slow progress.
Wednesday, April 26, 2023, 15:12
TGHT= 223 A, 3.1 V
TBHT = 226 A, 3.0 V
Set ramp rate is 1A/min but real rate is slightly less than 0.5A/min due to pressure fluctuation.
|
Vacuum spike at 300A.
Currently:
TGHT= 316A, 4.6V
TBHT=283A, 3.9V
Wednesday, April 26, 2023, 18:18 Ramping TBHT down from 280A to 270A
|
Wednesday, April 26, 2023, 22:12
TGHT = 400A, 6.1V; TBHT = 274A/3.7V. Temp is holding sturdy ~1100 C and will leave it overnight.
Pressure is coming down, currently at 8.8 e-6 Torr. See attachment for the overview.
TGHT will continue to ramp up tomorrow morning; check the pressure to ensure it has come down below 5e-6 Torr before proceeding. Refer to the instructions for details.
|
Thursday, April 27, 2023, 06:27
IGP1= 1.7e-06 Torr
OMEGA= 1097 C
TGHT= 400A, 6.2V
TBHT= 273A, 3.7 V
Starting ramp up of TGHT @0.2A/min set to 550A
|
Reached 550A on TGHT (paused there until I realized it was stopped) then resumed ramping to 580A at 0.2A/min. Saw both vacuum spikes before 550A. Attaching screenshot from John. |
Thursday, April 27, 2023, 22:18, John Wong, TiC, 44692-5, LP-FEBIAD, In progress, TiC230425
|
Darwin Ortiz Rosales wrote: |
John Wong wrote: |
Carla Babcock wrote: |
Darwin Ortiz Rosales wrote: |
Wednesday, April 26, 2023, 09:32
LP FEBIAD loaded with 367 TiC discs and 4 TiC removable discs for analyses
50 packs of 5 and the rest are singles
TaC coated (sintered) springs placed at both ends
Initial total Weight = 521.83 g
Initial heating @ 1A/min to 400 A on TGHT and 280A on TBHT
OMEGA slope = 0.99
Vacuum limits up to 200A: 3.0e-05 Torr -- 5.0e-04 Torr
Vacuum limit up after 200A: 3.0e-05 Torr -- 5.5e-05 Torr
No Ta heat-shields used
Initial IGP1 = 4.1e-07 Torr
Wednesday, April 26, 2023, 09:49
Starting initial ramp up to 200A on both TGHT and TBHT @ 1A/min
Wednesday, April 26, 2023, 12:50
Around 120A on TGHT, the pressure started to slowly drop. First outgassing done.
Wednesday, April 26, 2023, 14:03
IGP1 = 6.0 e-05 Torr
TGHT = 200 A, 2.7V
TBHT = 200 A, 2.6 v
OMEGA = Below lower limit
Waiting for pressure to fall below 5e0-5 Torr. Will change bad vacuum to 5.0e-05 Torr and then continue ramping @1A/min to 400 A on TGHT and 280 A on TBHT.
Wednesday, April 26, 2023, 14:13
IGPI= 4.2 e-05 Torr
starting ramping to 400 A on TGHT and 280A on TBHT
Wednesday, April 26, 2023, 14:26
The IGP1 pressure just fell below 3.0e-05 Torr and ramping has resumed
Wednesday, April 26, 2023, 14:42
pressure hovering around good vacuum so very slow progress.
Wednesday, April 26, 2023, 15:12
TGHT= 223 A, 3.1 V
TBHT = 226 A, 3.0 V
Set ramp rate is 1A/min but real rate is slightly less than 0.5A/min due to pressure fluctuation.
|
Vacuum spike at 300A.
Currently:
TGHT= 316A, 4.6V
TBHT=283A, 3.9V
Wednesday, April 26, 2023, 18:18 Ramping TBHT down from 280A to 270A
|
Wednesday, April 26, 2023, 22:12
TGHT = 400A, 6.1V; TBHT = 274A/3.7V. Temp is holding sturdy ~1100 C and will leave it overnight.
Pressure is coming down, currently at 8.8 e-6 Torr. See attachment for the overview.
TGHT will continue to ramp up tomorrow morning; check the pressure to ensure it has come down below 5e-6 Torr before proceeding. Refer to the instructions for details.
|
Thursday, April 27, 2023, 06:27
IGP1= 1.7e-06 Torr
OMEGA= 1097 C
TGHT= 400A, 6.2V
TBHT= 273A, 3.7 V
Starting ramp up of TGHT @0.2A/min set to 550A
|
Thursday, April 27, 2023, 22:04
TGHT has reached 580A/10.33V. Temp = 1540C.
The two out-gassing peaks were observed: 1st peak around 1300C and 2nd peak 1370C. See attachments 1 & 2.
A few minutes after TGHT reached to 580A, there was a small jump in TGHT current/voltage and also the pressure, but didn't notice any change in the temp, see attachment 3&4.
Pressure is currently at 3.4e-6 Torr; will hold TGHT until pressure reaches close to 1e-6 Torr before cooling down.
Friday, April 28, 2023, 01:06
Pressure has reached 1.8 e-6 Torr; TGHT has been holding at 580A for 3.5 hrs, a slight increase in voltage, reading at 10.45V and temperature, 1548C. See attachment #5 for overview.
Initiating auto-cooling TGHT at -2A/min, TBHT at -1A/min.
|
Friday, April 28, 2023, 09:39, Darwin Ortiz Rosales, TiC, 44692-5, LP-FEBIAD, Done, TiC230425
|
John Wong wrote: |
Darwin Ortiz Rosales wrote: |
John Wong wrote: |
Carla Babcock wrote: |
Darwin Ortiz Rosales wrote: |
Wednesday, April 26, 2023, 09:32
LP FEBIAD loaded with 367 TiC discs and 4 TiC removable discs for analyses
50 packs of 5 and the rest are singles
TaC coated (sintered) springs placed at both ends
Initial total Weight = 521.83 g
Initial heating @ 1A/min to 400 A on TGHT and 280A on TBHT
OMEGA slope = 0.99
Vacuum limits up to 200A: 3.0e-05 Torr -- 5.0e-04 Torr
Vacuum limit up after 200A: 3.0e-05 Torr -- 5.5e-05 Torr
No Ta heat-shields used
Initial IGP1 = 4.1e-07 Torr
Wednesday, April 26, 2023, 09:49
Starting initial ramp up to 200A on both TGHT and TBHT @ 1A/min
Wednesday, April 26, 2023, 12:50
Around 120A on TGHT, the pressure started to slowly drop. First outgassing done.
Wednesday, April 26, 2023, 14:03
IGP1 = 6.0 e-05 Torr
TGHT = 200 A, 2.7V
TBHT = 200 A, 2.6 v
OMEGA = Below lower limit
Waiting for pressure to fall below 5e0-5 Torr. Will change bad vacuum to 5.0e-05 Torr and then continue ramping @1A/min to 400 A on TGHT and 280 A on TBHT.
Wednesday, April 26, 2023, 14:13
IGPI= 4.2 e-05 Torr
starting ramping to 400 A on TGHT and 280A on TBHT
Wednesday, April 26, 2023, 14:26
The IGP1 pressure just fell below 3.0e-05 Torr and ramping has resumed
Wednesday, April 26, 2023, 14:42
pressure hovering around good vacuum so very slow progress.
Wednesday, April 26, 2023, 15:12
TGHT= 223 A, 3.1 V
TBHT = 226 A, 3.0 V
Set ramp rate is 1A/min but real rate is slightly less than 0.5A/min due to pressure fluctuation.
|
Vacuum spike at 300A.
Currently:
TGHT= 316A, 4.6V
TBHT=283A, 3.9V
Wednesday, April 26, 2023, 18:18 Ramping TBHT down from 280A to 270A
|
Wednesday, April 26, 2023, 22:12
TGHT = 400A, 6.1V; TBHT = 274A/3.7V. Temp is holding sturdy ~1100 C and will leave it overnight.
Pressure is coming down, currently at 8.8 e-6 Torr. See attachment for the overview.
TGHT will continue to ramp up tomorrow morning; check the pressure to ensure it has come down below 5e-6 Torr before proceeding. Refer to the instructions for details.
|
Thursday, April 27, 2023, 06:27
IGP1= 1.7e-06 Torr
OMEGA= 1097 C
TGHT= 400A, 6.2V
TBHT= 273A, 3.7 V
Starting ramp up of TGHT @0.2A/min set to 550A
|
Thursday, April 27, 2023, 22:04
TGHT has reached 580A/10.33V. Temp = 1540C.
The two out-gassing peaks were observed: 1st peak around 1300C and 2nd peak 1370C. See attachments 1 & 2.
A few minutes after TGHT reached to 580A, there was a small jump in TGHT current/voltage and also the pressure, but didn't notice any change in the temp, see attachment 3&4.
Pressure is currently at 3.4e-6 Torr; will hold TGHT until pressure reaches close to 1e-6 Torr before cooling down.
Friday, April 28, 2023, 01:06
Pressure has reached 1.8 e-6 Torr; TGHT has been holding at 580A for 3.5 hrs, a slight increase in voltage, reading at 10.45V and temperature, 1548C. See attachment #5 for overview.
Initiating auto-cooling TGHT at -2A/min, TBHT at -1A/min.
|
Friday, April 28, 2023, 09:27
IGP1= 1.20e-07 Torr
Will dismount target around 10:15 am
Heating curve below. Non-linear behavior
Final weight = 517.08 g
Target looks good see attached picture
|
Monday, January 29, 2024, 16:45, Darwin Ortiz Rosales, TaC, , LP-FEBIAD, Done, TaC coating sintering
|
Monday, January 29, 2024, 16:36
LP FEBIAD
wrapped in 4 Ta heatshields.
Will heat at 2A/min to 95A on TGHT and TBHT
Then will heat at 3A/min to 1800 C ~400A on TGHT and 230A on TBHT
Monday, January 29, 2024, 16:45
Initial IGP1= 5e-05 Torr
Monday, January 29, 2024, 20:35
1800C was at TGHT 410A, 6.9V RD and set current 418A
TBHT= 233 RD A, 3.2V
|
Wednesday, May 24, 2023, 15:23, Darwin Ortiz Rosales, , 44139-4, LP TUBE, Done, Graphite inside insert Experiment 1
|
Wednesday, May 24, 2023, 15:22
A Ta container tube was wrapped with 4 Ta heatshields. Note final container is 45220-11
219 graphite discs were loaded.
a TaC coated Ta spring at the front end.
The system was left to establish vacuum over previous night.
Good vacuum set to5e-04Torr
Bad vacuum was set to 5e-2 Torr
Total weight of system including spring= 250.1 g
OMEGA slope = 0.99
The target will be heated to 2000 C, held there for 10 hours.
Initial ramp at 1A/min to 200A
Then ramp at 0.5A/min while taking temperature readings periodically unti l250A.
At 250 A will let pressure stabilize and then ramp at 1A/min to 2000C or 450A.
Will hold at target Temperature or Current for 10 hours before starting ramp-down.
Wednesday, May 24, 2023, 15:50
Currently heating at 0.5A/min to250A. Taking temperature/current measurements
IGP1= 1.06e-06 Torr
Wednesday, May 24, 2023, 18:28
heating at 1A/min to 275A to collect more temperature data
Wednesday, May 24, 2023, 19:22
Slight offset between set and RD current observed.
Ramping at 1A/min to 440A according to the regression below
Should be around 2000 C.
Wednesday, May 24, 2023, 20:22
Currently at 339 A, 4.8V
OMEGA = 1614 C, IGP1= 2.04e-06 Torr
Will ramp up at 2A/min to 450A as new data point suggests
Wednesday, May 24, 2023, 21:05
heating curve has new slope suggesting 500A as minimum to reach 2000 C
Increasing ramp to 1A/10s to reach 450A
Wednesday, May 24, 2023, 21:17
TGHT
IGP1= 3.9e-06 Torr
Continue ramping to 480A
Wednesday, May 24, 2023, 22:11
Offset between setpoint of current and readback. readback 10A below.
Will keep at this setting until 7:30 am tomorrow then start ramp down @-2A/min
Thursday, May 25, 2023, 07:25
OMEGA=1912C, IGP1 =1.29e-06 Torr, TGHT = 480A, 9.0V
begin ramp down at -2A/min
Thursday, May 25, 2023, 09:52
Some odd current readback behaeviour noticed. Have contacted Gelo from controls. He will look at it next week. Discrepancy between read back and set point and drop in read back currrent. See picture
|
Wednesday, February 07, 2024, 22:49, Darwin Ortiz Rosales, TiC, 44692-11, LP TUBE, Done, 240206TiC conditioning
|
Wednesday, February 07, 2024, 22:36
Ta container tube TaC coated, wrapped in 4 Ta foil heat-shields, and loaded with 320 D shaped discs in a 12mm graphite cartridge with usable 11mm
Endcaps on the graphite cartridge have holes for outgassing
initial heating @ 2A/min to 90 A then 1A/min to 120A TGHT
OMEGA slope = 0.99
Vacuum limits up to 400A: 5.0e-04 Torr -- 1.0e-02 Torr
Thursday, February 08, 2024, 06:18
Starting heat ramp tght
initial pressure = 8.1e-07 Torr IGP1
Thursday, February 08, 2024, 06:54
start of gasoff observed. paused ramp and will continue at 1A/min
Thursday, February 08, 2024, 07:24
lowered TGHT current to 75 A as pressure increasing too rapidly. will leave at this current until pressure drops
Thursday, February 08, 2024, 09:11
continuing ramp to 120A on TGHT
Thursday, February 08, 2024, 09:24
Increasing ramp to 2A/min to 250A on TGHT
Thursday, February 08, 2024, 10:52
Increased ramp to 3A/min to 250A on TGHT
Thursday, February 08, 2024, 11:10
Everything looks good will continue to 300 A at 3A/min TGHT
Thursday, February 08, 2024, 11:33
Pausing heating at 285A, 4.8V TGHT
OMEGA reads 1430C
Will let pressure drop and then proceed ramping slowly @ 0.2A/min
Thursday, February 08, 2024, 13:53
IGP1= 2.4e-06 Torr
OMEGA = 1432 C
ramp at 0.2A/min towards 1550C
Thursday, February 08, 2024, 14:07
pressure very stable. will increase to 0.4 A/min
Thursday, February 08, 2024, 15:24
increasing ramp rate to 1A/min
IGP1 = 2.5e-06 Torr
Thursday, February 08, 2024, 18:05
1900 C on OMEGA
will leave 3-4 hours depending on pressure
Thursday, February 08, 2024, 21:10
No additional pressure peaks observed and pressure on IGP1= 1.9e-06 Torr
TGHT= 460 A, 8.1V
OMEGA= 1860 C
ramp down at -2A/min
|
Wednesday, February 21, 2024, 06:23, Darwin Ortiz Rosales, TiC, , LP TUBE, Done, 240220TiC conditioning
|
Wednesday, February 21, 2024, 06:22
Ta container tube, wrapped in 4 Ta foil heat-shields, and loaded with 201 D shaped discs in a 12mm graphite cartridge with usable 11mm
conditioning tube WO = 44692-13
End-caps on the graphite cartridge have holes for outgassing. One spring each end in the Ta container
initial heating @ 2A/min to 90 A then 1A/min to 120A TGHT
OMEGA slope = 0.99
Vacuum limits up to 400A: 5.0e-04 Torr -- 1.0e-02 Torr
Wednesday, February 21, 2024, 09:12
IGP1 initial = 9e-07 Torr
Starte at 3A/min to 90A
Wednesday, February 21, 2024, 09:21
increased autoramp to 4 A/min until pressure starts rising, then will slow down or pause
Wednesday, February 21, 2024, 09:32
At 74A, paused. Will continue at 2A/min TGHT
Wednesday, February 21, 2024, 09:40
Pausing at 87A.
Wednesday, February 21, 2024, 10:34
pressure dropping. restarting ramp up to 120A at 2A/min
Wednesday, February 21, 2024, 10:37
From previous TiC 220206, will heat up fast until 250A and then at 1A/min until 300A to better resolve out-gassing profile
Wednesday, February 21, 2024, 12:05
Changed ramp to 1A/min to 300A
Wednesday, February 21, 2024, 13:10
Manually ramped up for a while
increased ramp speed to 2A/min
regression line started to match previous one after 1300C
Wednesday, February 21, 2024, 13:16
increased ramp rate to 4A/min to 420A
Wednesday, February 21, 2024, 13:37
Note: the temperature became unrealistic. suspect window condensate. Will use regression and to to 441A
Wednesday, February 21, 2024, 13:54
reached 441A, 7.6V
leaving for 3.5 hours or when pressure drops to 2-3 e-06 Torr
Wednesday, February 21, 2024, 18:56
IGP1=2.9e-06 Torr
starting rampdown at -2A/min |
|