Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  Evaporator_2, Page 14 of 35  Not logged in ELOG logo
New entries since:Wed Dec 31 16:00:00 1969
  ID Date Author Target Material Target Oven W.O# Source Status Subjectdown Text Attachments
  52   Tuesday, October 16, 2012, 14:18 John WongTiC39165-4LP-SISDoneSintering TiC#3Tuesday, October 16, 2012, 14:12
Target is filled with 360 discs of
TiC (with 1 mole of graphite) backed on C-grv
 TiC#3_maxcurrent.PNG 
  125   Friday, March 21, 2014, 16:18 John WongTiC38817-8HP-SISIn progressSintering TiC  Friday, March 21, 2014, 16:09
Target container is loaded with 360
Discs of TiC.  
  
  126   Wednesday, March 26, 2014, 11:07 Laura LambertTiC38817-8HP-SISIn progressSintering TiC

    

       
            
  
  256   Monday, October 26, 2015, 16:14 Laura LambertEmpty41077-3LP-SISDoneSintering TaC on LPSIS (small block) container & temp measurements with 1xTa h.s

    

       
            
 temp_measurements_on_sintering_TaC_on_LPSIS_(small_block)_container.xlsx 
  253   Wednesday, October 21, 2015, 17:39 John WongEmpty41077-3LP-SISIn progressSintering TaC on LPSIS (small block) container Wednesday, October 21, 2015, 17:35
This container is prepared for a
backup UCx target (otherwise it will be used
  
  254   Thursday, October 22, 2015, 11:41 Laura LambertEmpty41077-3LP-SISIn progressSintering TaC on LPSIS (small block) container

    

       
            
  
  255   Thursday, October 22, 2015, 17:10 John WongEmpty41077-3LP-SISIn progressSintering TaC on LPSIS (small block) container

    

       
            
  
  57   Monday, February 18, 2013, 16:43 John WongEmpty LP-SISDoneSintering TaC coating on the RFQ target container Monday, February 18, 2013, 16:28
The RFQ target container is coated
with TaC and ready to be sintered.  No
 SiC#28_-_LPSIS-RFQ.pngSintering_of_TaC.PNGautorampingdown_10.PNG 
  392   Tuesday, November 21, 2017, 13:55 Laura LambertEmpty41882-4TARGET BOATDoneSintering TaC coating on fully enclosed target boat for graphite test Tuesday, November 21, 2017, 12:01
Boat coated with TaC using 'flushing
  
  354   Wednesday, April 05, 2017, 15:42 Laura LambertEmpty TARGET BOATIn progressSintering TaC coating on evap1 target boat Wednesday, April 05, 2017, 15:36
Coated container with TaC coating
using spray technique this morning and let
  
  355   Thursday, April 06, 2017, 08:57 Laura LambertEmpty TARGET BOATProblemsSintering TaC coating on evap1 target boat

    

       
            
 Capture.JPG 
  356   Thursday, April 06, 2017, 11:15 Laura LambertEmpty TARGET BOATProblems resolvedSintering TaC coating on evap1 target boat

    

       
            
 IMG_1615.JPGIMG_1611.JPG 
  357   Thursday, April 06, 2017, 13:16 Laura LambertEmpty40282-2TARGET BOATDoneSintering TaC coating on evap1 target boat

    

       
            
 IMG_1653.JPG 
  395   Thursday, December 07, 2017, 10:03 Laura LambertEndcaps TARGET BOATIn progressSintering TaC coating on endcaps and springs Thursday, December 07, 2017, 09:57
Each endcap is wrapped in a
  
  396   Thursday, December 07, 2017, 11:56 Laura LambertEndcaps TARGET BOATProblemsSintering TaC coating on endcaps and springs

    

       
            
 trip_due_to_new_vacuum_limits_not_being_updated_properly.JPG 
  397   Friday, December 08, 2017, 15:29 Laura LambertEndcaps TARGET BOATProblems resolvedSintering TaC coating on endcaps and springs

    

       
            
  
  398   Friday, December 08, 2017, 15:42 Laura LambertEndcaps TARGET BOATDoneSintering TaC coating on endcaps and springs

    

       
            
  
  447   Tuesday, June 04, 2019, 08:41 Darwin Ortiz RosalesEndcaps TARGET BOATDoneSintering TaC coating on endcaps and springsTuesday,
June 04, 2019, 08:36
  
  462   Monday, October 07, 2019, 09:18 Darwin Ortiz RosalesTaC TARGET BOATIn progressSintering TaC coating on endcaps and springsFriday, October 04, 2019, 11:37
Each endcap is separated with
  
  661   Tuesday, May 07, 2024, 06:20 Darwin Ortiz RosalesTaC TARGET BOATDoneSintering TaC coating on endcapsTuesday, May 07, 2024, 06:16
TP was swapped on previous day (May
6th)
  
ELOG V2.9.2-2455