284
|
Monday, March 21, 2016, 18:57 |
Aurelia Laxdal | Ta | 41790-1 | LP-SIS | In progress | Ta#47 LP-SIS (with new center block) conditioning |
|
|
|
285
|
Tuesday, March 22, 2016, 11:31 |
Aurelia Laxdal | Ta | 41790-1 | LP-SIS | In progress | Ta#47 LP-SIS (with new center block) conditioning |
|
|
|
286
|
Thursday, March 24, 2016, 11:32 |
John Wong | Ta | 41790-1 | LP-SIS | Done | Ta#47 LP-SIS (with new center block) conditioning |
|
|
|
290
|
Tuesday, April 19, 2016, 09:28 |
Anders Mjos | Ta | 41790-1 | LP-SIS | Done | Ta#47 LP-SIS (with new center block) conditioning |
|
|
|
527
|
Tuesday, February 09, 2021, 06:48 |
Aaron Schmidt | | NA | | Done | Ta coating test | Monday, February 08, 2021, 17:00: Installed
brackets w/ Ta wire and a small piece of
Re to test voltage drop. |
|
|
120
|
Friday, March 07, 2014, 10:34 |
Anders Mjos | | | | Problems resolved | TGHT2 water flow signal | There was no signal going from the coils
to the PLC. After manipulating the connection
points on the coil a signal could again be |
|
|
168
|
Tuesday, November 04, 2014, 16:20 |
John Wong | SiC | | TARGET BOAT | In progress | TEST: Fabrication of SiC & Determine phase transformation 3C vs 6H | Tuesday, November 04, 2014, 16:08
The purpose of this experiment is
to improve the fabrication of SiC. |
|
|
588
|
Wednesday, August 10, 2022, 09:31 |
Ivan Bao | Empty | | TARGET BOAT | In progress | TC tests | 1st test polarity 1
10:12 am Begin pumping down to rough
vacuum |
|
|
585
|
Tuesday, June 28, 2022, 09:31 |
Ferran Boix Pamies | Empty | 41882-2 | TARGET BOAT | In progress | TC test on Ta tube | Tuesday, June 27, 2022, early afternoon:
We assembled the setup in evap2 and started
the pumps leaving it running over night. |
|
|
587
|
Thursday, August 04, 2022, 09:31 |
Ferran Boix Pamies | Empty | | TARGET BOAT | In progress | TC on Ta boat test. | 11am: Setting up new target tube
thermocouple test
Thursday, August 04, 2022, 09:31 |
|
|
20
|
Tuesday, May 15, 2012, 17:06 |
John Wong | | | | Problems resolved | TBHT power supply faulty | Tuesday, May 15, 2012, 17:03
The tube heater power supply current
readback and setpoint are not matching. Ray |
|
|
19
|
Tuesday, May 15, 2012, 17:03 |
John Wong | | | | Problems | TBHT cooling line leaky | Tuesday, May 15, 2012, 17:00
It was found that there were water
droplets from the TBHT cooling line. The |
|
|
21
|
Wednesday, May 16, 2012, 14:04 |
John Wong | | | | Problems resolved | TBHT cooling line leaky |
|
|
|
584
|
Tuesday, June 21, 2022, 09:48 |
Darwin Ortiz Rosales | SiC | 37978-1 | HP-FEBIAD | Done | T-220617 sintering | Tuesday, June 21, 2022, 09:43
Total number of foils: |
|
|
578
|
Tuesday, June 07, 2022, 07:31 |
Darwin Ortiz Rosales | SiC | 42464-2 | HP-FEBIAD | Done | T-220524 Sintering SiC | Tuesday, June 07, 2022, 07:19
Total number of foils: |
|
|
576
|
Wednesday, May 18, 2022, 09:59 |
Darwin Ortiz Rosales | SiC | 44692-9 | HP-FEBIAD | Done | T-220516 Sintering SiC | Wednesday, May 18, 2022, 09:46
Total number of foils: |
|
|
605
|
Thursday, November 24, 2022, 11:08 |
John Wong | TiC | | TARGET BOAT | Done | Synthesis of TiC fibrous disc (TiO2/PAN only) | Thursday, November 24, 2022, 11:01
Target container contains one disc
of e-spun TiO2/PAN fibrous disc, (Ref sample |
|
|
595
|
Tuesday, October 18, 2022, 13:59 |
Hannah Toy | TiC | Target boat (tube) | TARGET BOAT | Done | Synthesis of TiC | Tuesday, October 18, 2022, 13:52
38 pieces of samples made of TiO2/C/PVP
loaded into a target boat wrapped with 2 |
|
|
596
|
Wednesday, October 19, 2022, 09:50 |
John Wong | TiC | Target boat (tube) | TARGET BOAT | Done | Synthesis of TiC |
|
|
|
635
|
Monday, June 05, 2023, 14:52 |
Aaron Schmidt | | | | | Swapped turbo pumps. | Previous TP would only spin up to
4KRPM. New TP installed.
Monday, June 05, 2023, 14:50: Roughing. |
|
|