  Evaporator_2, Page 11 of 34  Not logged in ELOG logo
  ID Date Author Target Material Target Oven W.O# Source Status Subjectdown Text Attachments
  284   Monday, March 21, 2016, 18:57 Aurelia LaxdalTa41790-1LP-SISIn progressTa#47 LP-SIS (with new center block) conditioning

    

       
            
  
  285   Tuesday, March 22, 2016, 11:31 Aurelia LaxdalTa41790-1LP-SISIn progressTa#47 LP-SIS (with new center block) conditioning

    

       
            
  
  286   Thursday, March 24, 2016, 11:32 John WongTa41790-1LP-SISDoneTa#47 LP-SIS (with new center block) conditioning

    

       
            
  
  290   Tuesday, April 19, 2016, 09:28 Anders MjosTa41790-1LP-SISDoneTa#47 LP-SIS (with new center block) conditioning

    

       
            
 2016-03-11_Evaporator_2.4ch2016-03-11_Evaporator_2.xlsx 
  527   Tuesday, February 09, 2021, 06:48 Aaron Schmidt NA DoneTa coating testMonday, February 08, 2021, 17:00: Installed
brackets w/ Ta wire and a small piece of
Re to test voltage drop.
  
  120   Friday, March 07, 2014, 10:34 Anders Mjos   Problems resolvedTGHT2 water flow signalThere was no signal going from the coils
to the PLC. After manipulating the connection
points on the coil a signal could again be
  
  168   Tuesday, November 04, 2014, 16:20 John WongSiC TARGET BOATIn progressTEST: Fabrication of SiC & Determine phase transformation 3C vs 6HTuesday, November 04, 2014, 16:08
The purpose of this experiment is
to improve the fabrication of SiC. 
  
  588   Wednesday, August 10, 2022, 09:31 Ivan BaoEmpty TARGET BOATIn progressTC tests1st test polarity 1
10:12 am Begin pumping down to rough
vacuum
  
  585   Tuesday, June 28, 2022, 09:31 Ferran Boix PamiesEmpty41882-2TARGET BOATIn progressTC test on Ta tubeTuesday, June 27, 2022, early afternoon:
We assembled the setup in evap2 and started
the pumps leaving it running over night.
  
  587   Thursday, August 04, 2022, 09:31 Ferran Boix PamiesEmpty TARGET BOATIn progressTC on Ta boat test. 11am: Setting up new target tube
thermocouple test
Thursday, August 04, 2022, 09:31
  
  20   Tuesday, May 15, 2012, 17:06 John Wong   Problems resolvedTBHT power supply faulty Tuesday, May 15, 2012, 17:03
The tube heater power supply current
readback and setpoint are not matching.  Ray
 tubeheater_control.png 
  19   Tuesday, May 15, 2012, 17:03 John Wong   ProblemsTBHT cooling line leaky Tuesday, May 15, 2012, 17:00
It was found that there were water
droplets from the TBHT cooling line.  The
 TBHT_cooling_line_leaky.pdf 
  21   Wednesday, May 16, 2012, 14:04 John Wong   Problems resolvedTBHT cooling line leaky

    

       
            
  
  584   Tuesday, June 21, 2022, 09:48 Darwin Ortiz RosalesSiC37978-1HP-FEBIADDoneT-220617 sinteringTuesday, June 21, 2022, 09:43
Total number of foils:
  
  578   Tuesday, June 07, 2022, 07:31 Darwin Ortiz RosalesSiC42464-2HP-FEBIADDoneT-220524 Sintering SiCTuesday, June 07, 2022, 07:19
Total number of foils:
  
  576   Wednesday, May 18, 2022, 09:59 Darwin Ortiz RosalesSiC44692-9HP-FEBIADDoneT-220516 Sintering SiC Wednesday, May 18, 2022, 09:46
Total number of foils:
  
  605   Thursday, November 24, 2022, 11:08 John WongTiC TARGET BOATDoneSynthesis of TiC fibrous disc (TiO2/PAN only)Thursday, November 24, 2022, 11:01
Target container contains one disc
of e-spun TiO2/PAN fibrous disc, (Ref sample
 striptool_1600C.jpgstriptool_1887C.jpg 
  595   Tuesday, October 18, 2022, 13:59 Hannah ToyTiCTarget boat (tube)TARGET BOATDoneSynthesis of TiC Tuesday, October 18, 2022, 13:52
38 pieces of samples made of TiO2/C/PVP
loaded into a target boat wrapped with 2
  
  596   Wednesday, October 19, 2022, 09:50 John WongTiCTarget boat (tube)TARGET BOATDoneSynthesis of TiC


   
        
            
 Screenshot_2022-10-19_102257.pngScreenshot_2022-10-19_120146.pngScreenshot_2022-10-19_195305.pngScreenshot_2022-10-21_085223.png 
  635   Monday, June 05, 2023, 14:52 Aaron Schmidt    Swapped turbo pumps. Previous TP would only spin up to
4KRPM. New TP installed.
Monday, June 05, 2023, 14:50: Roughing. 
  