  Evaporator_2, Page 11 of 35  Not logged in ELOG logo
ID Date Author Target Material Target Oven W.O# Source Status Subjectdown Text Attachments
  592   Thursday, September 22, 2022, 07:15 Darwin Ortiz RosalesTaC TARGET BOATDoneTaC coated endcaps and spring sinteringThursday, September 22, 2022, 07:13
Each endcap is separated with
  
  607   Friday, December 16, 2022, 10:03 Darwin Ortiz RosalesTaC TARGET BOATDoneTaC coated endcaps and spring sintering4 TaC coated springs and 4 Tac coated caps
loaded into a target boat.
Target boat wrapped in 4 Ta heatshields
  
  614   Thursday, March 09, 2023, 06:58 Darwin Ortiz RosalesEndcaps TARGET BOATDoneTaC coated endcaps and spring sinteringThursday,
March 09, 2023, 06:53
2 TaC coated springs and  12
  
  632   Friday, April 28, 2023, 11:31 Darwin Ortiz RosalesTaCBoatTARGET BOATDoneTaC coated endcaps and spring sinteringFriday, April 28, 2023, 11:29
loaded 14 TaC coated end caps and
2 TaC coated springs.
  
  486   Monday, June 01, 2020, 12:03 Aaron SchmidtTa44139-13LP-SISIn progressTa#60 Conditioning Ta#60 LP-SIS target
description:
  
  279   Sunday, March 13, 2016, 14:58 Aurelia LaxdalTa41790-1LP-SISIn progressTa#47 LP-SIS (with new center block) conditioning Started Ta#47 heating at Evap2 using the
autoramp program. The TGHT current is setup
to go to 300A (for now) and the TBHT to 230A
  
  280   Monday, March 14, 2016, 09:22 Laura LambertTa41790-1LP-SISIn progressTa#47 LP-SIS (with new center block) conditioning

    

       
            
  
  281   Monday, March 14, 2016, 13:12 Anders MjosTa41790-1LP-SISIn progressTa#47 LP-SIS (with new center block) conditioning

    

       
            
  
  282   Monday, March 14, 2016, 19:22 Aurelia LaxdalTa41790-1LP-SISIn progressTa#47 LP-SIS (with new center block) conditioning

    

       
            
  
  283   Friday, March 18, 2016, 17:13 Aurelia LaxdalTa41790-1LP-SISIn progressTa#47 LP-SIS (with new center block) conditioning

    

       
            
  
  284   Monday, March 21, 2016, 18:57 Aurelia LaxdalTa41790-1LP-SISIn progressTa#47 LP-SIS (with new center block) conditioning

    

       
            
  
  285   Tuesday, March 22, 2016, 11:31 Aurelia LaxdalTa41790-1LP-SISIn progressTa#47 LP-SIS (with new center block) conditioning

    

       
            
  
  286   Thursday, March 24, 2016, 11:32 John WongTa41790-1LP-SISDoneTa#47 LP-SIS (with new center block) conditioning

    

       
            
  
  290   Tuesday, April 19, 2016, 09:28 Anders MjosTa41790-1LP-SISDoneTa#47 LP-SIS (with new center block) conditioning

    

       
            
 2016-03-11_Evaporator_2.4ch2016-03-11_Evaporator_2.xlsx 
  527   Tuesday, February 09, 2021, 06:48 Aaron Schmidt NA DoneTa coating testMonday, February 08, 2021, 17:00: Installed
brackets w/ Ta wire and a small piece of
Re to test voltage drop.
  
  120   Friday, March 07, 2014, 10:34 Anders Mjos   Problems resolvedTGHT2 water flow signalThere was no signal going from the coils
to the PLC. After manipulating the connection
points on the coil a signal could again be
  
  168   Tuesday, November 04, 2014, 16:20 John WongSiC TARGET BOATIn progressTEST: Fabrication of SiC & Determine phase transformation 3C vs 6HTuesday, November 04, 2014, 16:08
The purpose of this experiment is
to improve the fabrication of SiC. 
  
  588   Wednesday, August 10, 2022, 09:31 Ivan BaoEmpty TARGET BOATIn progressTC tests1st test polarity 1
10:12 am Begin pumping down to rough
vacuum
  
  585   Tuesday, June 28, 2022, 09:31 Ferran Boix PamiesEmpty41882-2TARGET BOATIn progressTC test on Ta tubeTuesday, June 27, 2022, early afternoon:
We assembled the setup in evap2 and started
the pumps leaving it running over night.
  
  587   Thursday, August 04, 2022, 09:31 Ferran Boix PamiesEmpty TARGET BOATIn progressTC on Ta boat test. 11am: Setting up new target tube
thermocouple test
Thursday, August 04, 2022, 09:31
  