  ID Date Author Target Material Target Oven W.O# Source Statusdown Subject Text Attachments
  462   Monday, October 07, 2019, 09:18 Darwin Ortiz RosalesTaC TARGET BOATIn progressSintering TaC coating on endcaps and springsFriday, October 04, 2019, 11:37
Each endcap is separated with
  
  463   Tuesday, October 08, 2019, 14:16 Aaron SchmidtSiC HP-FEBIADIn progressTemp measurements.Tuesday, October 08, 2019, 14:14: Remove
Flex line HS. 
HS: 42752-1
  
  464   Thursday, October 17, 2019, 13:53 Darwin Ortiz RosalesTaC44062-3LP-SISIn progressTaC coating/sinteringThursday, October 17, 2019, 12:00
Ta tube was coated with TaC and wrapped
with Ta heat-shields (3 layers)
  
  467   Thursday, November 21, 2019, 08:10 Aaron SchmidtSiC HP-FEBIADIn progressTemperature mapping. Thursday, November 21, 2019, 08:09:
PS on. Leak issue resolved (Evap 2 Elog 466).
Vacuum @ 4.10e-07T.
  
  468   Friday, November 22, 2019, 18:32 Fernando Maldonado & Marla Cervantes TaC HP-FEBIADIn progressTaC coating/sintering Friday, November 22, 2019, 18:18:
 
 
  
  470   Monday, November 25, 2019, 11:35 Aaron Schmidt   In progressFlex - line HS installed Leak noted on previous TaC sintering
on HP FEBIAD # 42464-3.
Swapped out gaskets on HS flex line
  
  474   Tuesday, December 03, 2019, 08:24 Aaron Schmidt  LP-FEBIADIn progressTemperature mapping.Tuesday, December 03, 2019, 08:15: Waterlines
opened. Vacuum ok @ 4.06e-07T
Tuesday, December 03, 2019, 08:23:
 TGHT_weird_behaviour.PNGIEVAP-WFB1.PNG191205-GHT-trip-1800.PNG 
  486   Monday, June 01, 2020, 12:03 Aaron SchmidtTa44139-13LP-SISIn progressTa#60 Conditioning Ta#60 LP-SIS target
description:
  
  492   Saturday, July 25, 2020, 08:58 Darwin Ortiz RosalesZrC44139-7-SK In progressZrC for Luca's experimentsFriday, July 24, 2020, 15:00
Ta tube cotaining 497 ZrC discs
  
  496   Tuesday, August 11, 2020, 10:17 Ferran Boix PamiesEmpty41882-1TARGET BOATIn progressContamination foils temperature testThe target was prepared and put under vacuum
on 2020-08-10
 
  
  497   Wednesday, August 12, 2020, 08:58 Aaron Schmidt   In progressInstall Flex line HSFlex line HS installed. New SS gaskets. 
Wednesday, August 12, 2020, 08:56:
Roughing (Check).
  
  512   Monday, September 28, 2020, 11:53 John Wongnp-SiC TARGET BOATIn progressnp-SiC carbonizationMonday, September 28, 2020, 11:49
6 discs of np-SiC were loaded to
the target boat wrapped with 3 layers of
  
  513   Tuesday, October 06, 2020, 14:23 Aaron SchmidtTa44508-1LP-SISIn progressConditioning Ta#61Ta#61 LP-SIS target description:
Total Ta foils = 470 [6x20 packs
  
  514   Wednesday, October 07, 2020, 12:25 Aaron Schmidt   In progressIEVAP2:TP1 Swap out. Wednesday, October 07, 2020
TP1 was not spinning up past 4krpm.
Stalling & tripping out. Examined with
  
  518   Friday, October 16, 2020, 16:31 Luca EgoritiEmpty TARGET BOATIn progressHPOG annealingFriday, October 16, 2020, 11:30
 Target mounted in EVAP2. Pump
down started
  
  519   Wednesday, October 21, 2020, 14:39 Aaron SchmidtNb44508-2LP-SISIn progressConditioning Nb#9 Nb#9 LP-SIS target description:
  
  546   Thursday, April 08, 2021, 08:25 Aaron SchmidtTa44139-10LP-SISIn progressConditioning Ta#62 & Flex - line HS installed Ta#62 LP-SIS target
description:
  
  551   Wednesday, June 23, 2021, 17:48 Aaron SchmidtTa44691-4LP-SISIn progressConditioning Ta#62 (Replacement) Ta#62 LP-SIS target
description: (REPLACEMENT FOR 44139-10)
 Ta#62_conditioning_-_Evap_2_-_44691-4.docx 
  564   Wednesday, November 10, 2021, 18:07 Aaron SchmidtTa44691-11LP-SISIn progressConditioning Ta#63Ta#63 LP-SIS target description: 
  
  577   Thursday, June 02, 2022, 16:53 Aaron SchmidtTa44691-12LP-SISIn progressConditioning Ta#64 Ta#64 LP-SIS target
description: 
  