  Evaporator_2, Page 10 of 34  Not logged in ELOG logo
New entries since:Wed Dec 31 16:00:00 1969
  ID Date Author Target Materialdown Target Oven W.O# Source Status Subject Text Attachments
  665   Monday, July 22, 2024, 14:59 Aaron SchmidtTa45447-14LP-SISIn progressConditioning Ta#67 Thin foil  Ta#67 Thin foil   
  674   Friday, August 30, 2024, 11:33 Darwin Ortiz RosalesTa45447-8LP-IG-LISDoneTaC coating sinteringFriday, August 30, 2024, 11:31
The coated container was wrapped
in 4 Ta foil heatshields.
  
  17   Tuesday, May 15, 2012, 12:26 John WongSiC38481-2HP-SISDoneRe-condition the HP-SIS SiC targetTuesday, May 15, 2012, 12:24
The HP-SIS SiC target was made on
Nov 03, 2010.  The target consists of
  
  22   Friday, May 18, 2012, 12:19 Nikita BernierSiC38481-2HP-SISDoneRe-condition the HP-SIS SiC target

    

       
            
 autoramp1.pngievap2autoheat1.png 
  23   Friday, May 18, 2012, 13:17 John WongSiC38481-2HP-SISDoneRe-condition the HP-SIS SiC target

    

       
            
  
  24   Tuesday, May 22, 2012, 12:15 Nikita BernierSiC38481-2HP-SISDoneRe-condition the HP-SIS SiC target

    

       
            
 TGHT-VAC1.JPGTBHT-VAC1.JPG 
  25   Tuesday, May 22, 2012, 15:26 John WongSiC38481-2HP-SISDoneRe-condition the HP-SIS SiC target

    

       
            
  
  30   Monday, June 11, 2012, 12:26 John WongSiC38481-2HP-SISProblemsEnd caps vaporized

    

       
            
 Photo_2012-06-11_12_06_19_PM.jpg 
  43   Tuesday, August 14, 2012, 15:57 John WongSiC38295-8 HP-FEBIADDoneTesting endcaps inserted /w the new expansion toolTuesday, August 14, 2012, 15:44
This SiC target was prepared in May
2011 with the Evaporator#1.  The target
 vacuum_leaks.PNGTGHT_TBHT.png 
  58   Friday, February 22, 2013, 15:55 John WongSiC LP-SISDoneSintering SiC#28-RFQFriday, February 22, 2013, 15:49
The LP-SIS RFQ target container was
previously coated with TaC and sintered up
 RFQ_SiC#28_-production_process.mp4 
  77   Monday, June 17, 2013, 16:59 Laura LambertSiC38481-6HP-FEBIADDoneSintering of SiC #29Monday, June 17, 2013, 16:57
Target is loaded with 510 SiC discs
Container was previously coated with
  
  78   Tuesday, June 18, 2013, 16:40 John WongSiC38481-6HP-FEBIADDoneSintering of SiC #29

    

       
            
  
  139   Friday, June 20, 2014, 12:01 Laura LambertSiC39530-8HP-FEBIADIn progressConditioning SiC#31 target Friday, June 20, 2014, 11:14
Made from batch's: oct 23/2013, oct
31/2013 and june 2012
  
  140   Friday, June 20, 2014, 16:22 John WongSiC39530-8HP-FEBIADIn progressConditioning SiC#31 target

    

       
            
  
  141   Monday, June 23, 2014, 09:47 Laura LambertSiC39530-8HP-FEBIADIn progressConditioning SiC#31 target

    

       
            
 current_vs_temp.jpeg 
  142   Tuesday, June 24, 2014, 23:57 John WongSiC39530-8HP-FEBIADIn progressConditioning SiC#31 target

    

       
            
 2014-06-24_16.57.17.jpg 
  167   Thursday, October 23, 2014, 15:38 Laura LambertSiC39530-8HP-FEBIADIn progressTesting the new OMEGA-IR2C on SiC#31 target Thursday, October 23, 2014, 15:34
*See elog #142 for target description*
one endcap still in place, one removed
 2014-10-23_15.12.56.jpg2014-10-24.jpeg 
  168   Tuesday, November 04, 2014, 16:20 John WongSiC TARGET BOATIn progressTEST: Fabrication of SiC & Determine phase transformation 3C vs 6HTuesday, November 04, 2014, 16:08
The purpose of this experiment is
to improve the fabrication of SiC. 
  
  169   Tuesday, November 04, 2014, 16:21 John WongSiC39530-8HP-FEBIADDoneTesting the new OMEGA-IR2C on SiC#31 target (NOT TO BE USED ONLINE)

    

       
            
  
  186   Friday, April 17, 2015, 16:14 Laura LambertSiC38817-7HP-SISIn progressSintering SiC#31 Friday, April 17, 2015, 16:01
Total number of foils: 520 discs
  