Tuesday, February 28, 2023, 07:21, Darwin Ortiz Rosales, Ta, 44692-7, LP-FEBIAD, Done, TaC coating sintering
|
Tuesday, February 28, 2023, 07:19
Ta LP-FEBIAD was coated with TaC and wrapped with Ta heat-shields (4 layers)
Desired temperature = 1850 C , TBHT will be set fixed at 230A (max). |
Wednesday, March 01, 2023, 21:49, Darwin Ortiz Rosales, Ta, 44692-3, HP-SIS, Done, TaC coating sintering
|
Wednesday, March 01, 2023, 21:46
Ta HP-SIS was coated with TaC and wrapped with Ta heat-shields (3 layers + 1 inner layer
around fins) |
Sunday, March 12, 2023, 08:06, Darwin Ortiz Rosales, Ta, 44692-2, HP-SIS, Done, TaC coating sintering
|
Sunday, March 12, 2023, 08:04
Ta HP-SIS was coated with TaC and wrapped with Ta heat-shields (3 layers + 1 inner layer
around fins) |
Thursday, March 30, 2023, 12:45, Aaron Schmidt, Ta, 45220-7, LP-SIS, In progress, Conditioning Ta#65
|
Thursday, March 30, 2023, 12:27:
Ta#65 LP-SIS target description:
Total Ta foils = 470 [6x20 packs + 350 single discs] |
Wednesday, September 20, 2023, 14:26, Aaron Schmidt, Ta, 45220-5, LP-SIS, In progress, Conditioning Ta#66
|
Ta#66 LP-SIS target description:
Total Ta foils = 470 [6x20 packs + 350 single discs]
Foil Thickness = 0.033mm (0.0013") avg Measured. |
Thursday, October 05, 2023, 12:47, Aaron Schmidt, Ta, 45220-3, LP-SIS, In progress, Conditioning Ta#68 (Spare)
|
Ta#(Spare) LP-SIS target description:
Total Ta foils = 470 [6x20 packs + 350 single discs]
Foil Thickness = 0.033mm (0.0013") avg Measured. |
Monday, July 22, 2024, 14:59, Aaron Schmidt, Ta, 45447-14, LP-SIS, In progress, Conditioning Ta#67 Thin foil
|
Ta#67 Thin foil LP-SIS target
description:
Total Ta foils = 470 loaded into 2 packs of 235 foils each. |
Tuesday, May 15, 2012, 12:26, John Wong, SiC, 38481-2, HP-SIS, Done, Re-condition the HP-SIS SiC target
|
Tuesday, May 15, 2012, 12:24
The HP-SIS SiC target was made on Nov 03, 2010. The target consists of 405 discs, 18.5cm in length. It was sintered in the Evaporator#1.
This target is going into Evap#2 for re-conditioning. It is currently being pumped down. |
Friday, May 18, 2012, 12:19, Nikita Bernier, SiC, 38481-2, HP-SIS, Done, Re-condition the HP-SIS SiC target 
|
John Wong wrote:
Tuesday, May 15, 2012, 12:24 |
Friday, May 18, 2012, 13:17, John Wong, SiC, 38481-2, HP-SIS, Done, Re-condition the HP-SIS SiC target
|
Nikita Bernier wrote:
|
Tuesday, May 22, 2012, 12:15, Nikita Bernier, SiC, 38481-2, HP-SIS, Done, Re-condition the HP-SIS SiC target 
|
John Wong wrote:
|
Tuesday, May 22, 2012, 15:26, John Wong, SiC, 38481-2, HP-SIS, Done, Re-condition the HP-SIS SiC target
|
Nikita Bernier wrote:
|
Monday, June 11, 2012, 12:26, John Wong, SiC, 38481-2, HP-SIS, Problems, End caps vaporized
|
John Wong wrote:
|
Tuesday, August 14, 2012, 15:57, John Wong, SiC, 38295-8 , HP-FEBIAD, Done, Testing endcaps inserted /w the new expansion tool 
|
Tuesday, August 14, 2012, 15:44
This SiC target was prepared in May 2011 with the Evaporator#1. The target will not used for online.
Two endcaps were inserted with the new expansion tool. The target will be heated up to the normal operating condition (TGHT =580A, TBHT = |
Friday, February 22, 2013, 15:55, John Wong, SiC, , LP-SIS, Done, Sintering SiC#28-RFQ
|
Friday, February 22, 2013, 15:49
The LP-SIS RFQ target container was previously coated with TaC and sintered up to ~1500C (TGHT @ 600A, TBHT @ 300A).
The container is loaded with 325 discs of SiC, a total of 10.9cm in length. |
Monday, June 17, 2013, 16:59, Laura Lambert, SiC, 38481-6, HP-FEBIAD, Done, Sintering of SiC #29
|
Monday, June 17, 2013, 16:57
Target is loaded with 510 SiC discs
Container was previously coated with TaC and sintered |
Tuesday, June 18, 2013, 16:40, John Wong, SiC, 38481-6, HP-FEBIAD, Done, Sintering of SiC #29
|
Laura Lambert wrote:
Monday, June 17, 2013, 16:57 |
Friday, June 20, 2014, 12:01, Laura Lambert, SiC, 39530-8, HP-FEBIAD, In progress, Conditioning SiC#31 target
|
Friday, June 20, 2014, 11:14
Made from batch's: oct 23/2013, oct 31/2013 and june 2012
Total number of foils: 515 discs |
Friday, June 20, 2014, 16:22, John Wong, SiC, 39530-8, HP-FEBIAD, In progress, Conditioning SiC#31 target
|
Laura Lambert wrote:
Friday, June 20, 2014, 11:14 |
Monday, June 23, 2014, 09:47, Laura Lambert, SiC, 39530-8, HP-FEBIAD, In progress, Conditioning SiC#31 target
|
John Wong wrote:
|
|