Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  Evaporator_2, Page 16 of 34  Not logged in ELOG logo
ID Date Author Target Material Target Oven W.O# Source Status Subject Text Attachments
  379   Tuesday, July 18, 2017, 15:30 Laura Lambert   MaintenancePaddle wheel replacement for all evap2 water supplies Tuesday, July 18, 2017, 15:26
Problems occured with TGHT water
supply paddle wheel stopped and therefore
  
  378   Monday, July 10, 2017, 17:36 John Wongnp-SiC TARGET BOATProblemsWater Sensor Problem, TGHT Tripped. (np-SiC fibrous Pellet: Applied pressure vs Density)Monday, July 10, 2017, 17:28
Two np-SiC fibrous pellets with different
applied pressure:
 Graph3a.JPG 
  377   Tuesday, June 20, 2017, 16:07 Laura LambertTa42218-6HP-SISDoneConditioning Ta#53 Tuesday, June 20, 2017, 15:58
Target consists of 470 discs.
 Ta#53.JPG 
  376   Friday, June 16, 2017, 15:14 Laura LambertSiC40282-4TARGET BOATDoneSintering SiC pellets

    

       
            
 20170619_111816.jpg20170619_111848.jpg 
  375   Friday, June 16, 2017, 10:42 Marla CervantesSiC40282-4TARGET BOATDoneSintering SiC pellets

    

       
            
  
  374   Wednesday, June 14, 2017, 15:51 Laura LambertSiC40282-4TARGET BOATIn progressSintering SiC pellets Wednesday, June 14, 2017, 15:49
Pellets previously made by Marla
and weighed.
  
  373   Monday, June 05, 2017, 15:20 Laura LambertEmpty42218-15LP-SISDoneSintering TaC coating on UCx#21 container Monday, June 05, 2017, 15:20
Container coated with TaC using
  
  372   Tuesday, May 30, 2017, 14:40 Laura LambertTa42218-14LP-SISDoneConditioning Ta#52 Tuesday, May 30, 2017, 14:36
Target consists of 400 discs.
  
  371   Tuesday, May 16, 2017, 11:57 Laura LambertSiC41369-10HP-FEBIAD-CTLDoneSintering SiC#36 Tuesday, May 16, 2017, 10:56
Target container contains 460
 window_at_max_setpoint_after_1_day.jpg20170530_094047_Richtone(HDR).jpg20170530_094118_Richtone(HDR).jpg20170530_094137_Richtone(HDR).jpg 
  370   Thursday, May 11, 2017, 11:36 Laura LambertSiC39530-10HP-FEBIADDoneSintering SiC#36 - not SiC#36: now back-up [SiC#36 should be HP-FEBIAD-CTL!!!]

    

       
            
  
  369   Thursday, May 11, 2017, 11:30 Laura Lambert   MaintenanceNew Ion Gauge for IGP2 Thursday, May 11, 2017, 11:25
IGP2 has been having problems where
sometimes it turns off and requires simply
  
  368   Thursday, May 11, 2017, 11:25 Laura LambertEmpty41369-10HP-FEBIAD-CTLDoneRUSH! Sintering TaC coated container for SiC#36 Thursday, May 11, 2017, 11:21
Turns out SiC HP-FEBIAD that has
finished conditioning is loaded in the wrong
 LS_during_TaC_sintering.jpgRS_during_TaC_sintering.jpg 
  367   Thursday, May 11, 2017, 10:51 Laura LambertEmpty TARGET BOATDoneConditioning Heat Shield for IGLIS UCx#20 - test stand is down

    

       
            
  
  366   Wednesday, May 10, 2017, 21:33 Anders MjosEmpty TARGET BOATIn progressConditioning Heat Shield for IGLIS UCx#20 - test stand is down

    

       
            
  
  365   Wednesday, May 10, 2017, 16:07 Laura LambertEmpty TARGET BOATIn progressConditioning Heat Shield for IGLIS UCx#20 - test stand is down Wednesday, May 10, 2017, 16:05
Loaded.
HS water valves opened, no leaks
  
  364   Monday, May 08, 2017, 10:05 Laura Lambert   MaintenanceTurbo pump control box replaced Monday, May 08, 2017, 10:05
Turbo pump control box died last
week.
  
  363   Wednesday, May 03, 2017, 16:10 Laura LambertSiC39530-10HP-FEBIADDoneSintering SiC#36


   
        
            
 8x 
  362   Wednesday, May 03, 2017, 16:09 Laura LambertSiC39530-10HP-FEBIADProblems resolvedSintering SiC#36

    

       
            
  
  361   Wednesday, May 03, 2017, 13:48 Laura LambertSiC39530-10HP-FEBIADProblemsSintering SiC#36

    

       
            
 vacuum_trip3.JPGvacuum_trip4.JPG 
  360   Thursday, April 27, 2017, 15:54 Laura LambertSiC39530-10HP-FEBIADIn progressSintering SiC#36 Thursday, April 27, 2017, 14:01
Target container contains 470
  
ELOG V2.9.2-2455