  359   Thursday, April 20, 2017, 12:45 John Wongnp-SiC TARGET BOATIn progressHigher Temp Treament: B3-92Mpa pellets Thursday, April 20, 2017, 12:38
3 samples are loaded into the Ta
boat and wrapped with heat shield (1 long
 B3_PAN_pellets_1800c.JPG 
  358   Thursday, April 13, 2017, 12:03 Laura LambertSiC TARGET BOATDoneSintering SiC pellets Thursday, April 13, 2017, 12:01
Pellets made this morning and weighed.
Placed in a graphite boat which is
 IMG_1657.JPGIMG_1659.JPG 
  357   Thursday, April 06, 2017, 13:16 Laura LambertEmpty40282-2TARGET BOATDoneSintering TaC coating on evap1 target boat

    

       
            
 IMG_1653.JPG 
  356   Thursday, April 06, 2017, 11:15 Laura LambertEmpty TARGET BOATProblems resolvedSintering TaC coating on evap1 target boat

    

       
            
 IMG_1615.JPGIMG_1611.JPG 
  355   Thursday, April 06, 2017, 08:57 Laura LambertEmpty TARGET BOATProblemsSintering TaC coating on evap1 target boat

    

       
            
 Capture.JPG 
  354   Wednesday, April 05, 2017, 15:42 Laura LambertEmpty TARGET BOATIn progressSintering TaC coating on evap1 target boat Wednesday, April 05, 2017, 15:36
Coated container with TaC coating
using spray technique this morning and let
  
  353   Friday, March 31, 2017, 12:22 John Wongnp-SiC TARGET BOATIn progressThermo test: B3 Pellets (13.3K-PSI) Friday, March 31, 2017, 12:21
Two compressed pellets loaded into
the target boat and wrapped with Ta foil. 
 heating_curve_00.JPGheating_curve_13PSI_pellets_01.JPG 
  352   Monday, March 13, 2017, 15:34 Anders MjosTa41790-4LP-SISDoneConditioning Ta#51Target container wrapped in 3x heat shield
foils and installed by JW
 Monday, March 13, 2017, 15:33:
  
  351   Saturday, March 11, 2017, 11:58 John Wongnp-SiC TARGET BOATDoneThermo test B3 PelletsFriday, March 10, 2017, 17:29
Three B3 pellets are loaded into
the container for thermo test. 
 heating_curve_900PSI_pellet.JPG 
  350   Tuesday, February 21, 2017, 15:21 Laura LambertEmpty42218-1LP-IG-LISDonesintering TaC coating on UCx#20 containerTuesday, February 21, 2017, 15:19
Container coated with TaC using
 IMG_1562.JPGIMG_1564.JPG 
  349   Tuesday, February 14, 2017, 15:48 Laura LambertEndcaps TARGET BOATDoneSintering TaC coating on Ta endcaps and springs

    

       
            
 IMG_1542.JPGIMG_1545.JPGIMG_1549.JPGIMG_1552.JPG 
  348   Tuesday, February 14, 2017, 15:44 Laura LambertEndcaps TARGET BOATProblems resolvedSintering TaC coating on Ta endcaps and springs

    

       
            
  
  347   Thursday, February 09, 2017, 23:28 John Wongnp-SiC TARGET BOATDoneThermotest: SiC-SiO2-Lys and SiC pelletsThursday, February 09, 2017, 23:26
There are two types of samples being
test for thermal stability:
 striptool_01.JPG 
  346   Thursday, February 09, 2017, 11:49 Laura Lambert   MaintenanceNew heatshield with flexible water lines Thursday, February 09, 2017, 11:47
A new heatshield with flexible water
lines has been put into evap2 last Friday
  
  345   Monday, February 06, 2017, 11:17 Anders Mjos   Problems resolvedIOC restart after power outagae Dave Morris did a remote restart
of the IOC after the outage. Turbo pump started.
  
  344   Friday, February 03, 2017, 14:18 Laura LambertEndcaps TARGET BOATProblemsSintering TaC coating on Ta endcaps and springs Friday, February 03, 2017, 14:17
The endcaps are stacked together
 IMG_1526.JPGIMG_1527.JPG 
  343   Tuesday, January 31, 2017, 16:03 Laura LambertEmpty39530-10HP-FEBIADDoneSintering TaC coated container for backup Tuesday, January 31, 2017, 13:43
Container coated with TaC using
 39530-10(1).JPG39530-10(2).JPG 
  342   Tuesday, December 20, 2016, 15:04 Laura Lambert   MaintenanceRETURN and SUPPLY valves CLOSED for xmas breakTuesday, December 20, 2016, 15:05
confirmed ~full tank of Ar for glove
box --> ~1600psi 
  
  341   Friday, December 16, 2016, 14:14 Laura LambertTa39530-3LP-FEBIADDoneConditioning Ta FEBIAD target for shutdown tests Friday, December 16, 2016, 14:08
Target consists of 470 discs.
 Ta-FEBIAD.xlsxEvernote_Camera_Roll_20161220_145947.jpg 
  340   Thursday, December 01, 2016, 16:08 Laura LambertEmpty42218-12LP-SISDonesintering TaC coating on UCx#19 container Thursday, December 01, 2016, 16:06
Container coated with TaC using
  
ELOG V2.9.2-2455