ID |
Date |
Author |
Target Material |
Target Oven W.O# |
Source |
Status |
Subject |
Text |
|
239
|
Thursday, August 20, 2015, 17:15 |
John Wong | Ta | | HP-SIS | Done | Conditioning Ta#46 Target |
|
|
238
|
Thursday, August 20, 2015, 10:07 |
Laura Lambert | Ta | | HP-SIS | In progress | Conditioning Ta#46 Target |
|
|
237
|
Wednesday, August 19, 2015, 17:26 |
John Wong | Ta | | HP-SIS | In progress | Conditioning Ta#46 Target |
|
|
236
|
Tuesday, August 18, 2015, 16:02 |
Laura Lambert | Ta | | HP-SIS | In progress | Conditioning Ta#46 Target | Tuesday, August 18, 2015, 15:53
Target consists of 505 discs.
Total packed length 3.4cm. |
|
235
|
Thursday, August 06, 2015, 15:45 |
Laura Lambert | Endcaps | | TARGET BOAT | Done | Sintering TaC coating on Ta endcaps | Thursday, August 06, 2015, 15:36
The endcaps are stacked together
with a punched out disc of graphite foil |
|
234
|
Tuesday, August 04, 2015, 12:04 |
Laura Lambert | Ta | | TARGET BOAT | Done | Test for homogeneity: Sintering TaC coating on a Ta tube |
|
|
233
|
Friday, July 31, 2015, 15:51 |
John Wong | Ta | | TARGET BOAT | In progress | Test for homogeneity: Sintering TaC coating on a Ta tube | Friday, July 31, 2015, 15:39
A Ta tube was coated with TaC. The
inner of the tube was filled with TaC solution |
|
232
|
Friday, July 31, 2015, 15:10 |
John Wong | | | | Maintenance | Installed leftside port | Friday, July 31, 2015, 15:09
The left side port was installed
on the evaporator #2. Leak check was |
|
231
|
Thursday, July 30, 2015, 17:07 |
John Wong | | | | Maintenance | Connect NALCW to EVAP1 | Thursday, July 30, 2015, 17:02
EVAP1 cooling system is now on the
NALCW. The city water has been removed |
|
230
|
Monday, July 13, 2015, 11:54 |
Laura Lambert | Endcaps | 40282-5 | TARGET BOAT | Problems | Sintering TaC coating on Ta endcaps | Monday, July 13, 2015, 11:53
A Ta foil is placed in the target |
|
229
|
Monday, July 06, 2015, 16:30 |
Laura Lambert | Empty | 41369-2 | LP-SIS | Done | Sintering TaC coating container |
|
|
228
|
Monday, July 06, 2015, 12:07 |
John Wong | Empty | 41369-2 | LP-SIS | In progress | Sintering TaC coating container |
|
|
227
|
Tuesday, June 30, 2015, 09:50 |
Laura Lambert | Empty | 41369-2 | LP-SIS | In progress | Sintering TaC coating container |
|
|
226
|
Monday, June 29, 2015, 23:42 |
John Wong | Empty | 41369-2 | LP-SIS | In progress | Sintering TaC coating container |
|
|
225
|
Monday, June 29, 2015, 16:18 |
Laura Lambert | Empty | 41369-2 | LP-SIS | In progress | Sintering TaC coating container | Monday, June 29, 2015, 16:17
Target container is coated with |
|
224
|
Monday, June 29, 2015, 07:05 |
John Wong | ZrC | 41177-2 | LP-SIS | Done | Sintering back-up ZrC |
|
|
223
|
Thursday, June 25, 2015, 16:20 |
Laura Lambert | ZrC | 41177-2 | LP-SIS | In progress | Sintering back-up ZrC | Thursday, June 25, 2015, 16:14
Total number of foils: 422 discs |
|
222
|
Thursday, June 25, 2015, 16:13 |
Laura Lambert | SiC | 38817-6 | HP-SIS | Done | RUSH! SiC backup target undergoes sintering process |
|
|
221
|
Tuesday, June 23, 2015, 12:26 |
John Wong | SiC | 38817-6 | HP-SIS | In progress | RUSH! SiC backup target undergoes sintering process | Tuesday, June 23, 2015, 12:21
Target container is loaded with 485
discs of SiC with packed length of 17.4cm. |
|
220
|
Tuesday, June 23, 2015, 10:18 |
Laura Lambert | Empty | 38817-6 | HP-SIS | Done | RUSH! Sintering TaC coated container for SiC |
|
|